One, the commissioning of the preparatory work and plans
1. First electrical commissioning, after the commissioning of equipment. (Linkage before the external power has been accepted)
2. First single-machine debugging, after the linkage debugging.
3. Process piping cleaning and inspection. (There is no leakage, bad, blocked, etc.)
Two, the commissioning of the security measures
1. Prepare a car at the scene standby for emergencies.
2. Keep the site communication open. (telephone and walkie-talkie)
3. In the process of equipment commissioning, flammable and explosive substances should be isolated, and prepare a dry powder fire extinguisher.
4. When the equipment is on fire, power should be cut off immediately and dry powder fire extinguisher should be used to extinguish the fire. 5. Electricians wear insulated shoes and insulated gloves.
6. When equipment failure occurs, the licensed electrician first power off, and then check and repair.
7. The equipment and the surrounding environment should be cleaned, no dusty or noisy operations near the equipment.
8. Turn on any electrical appliances before the discharge.
9. Install all grounding devices (both permanent and temporary) in accordance with site grounding requirements
10. Use circuit switches or fuses to isolate the equipment from the power source
11. Avoid touching electrical components with wet hands or while standing on wet floors
12. Take care to avoid touching energized parts when operating electronic equipment. Make sure all parts are energized. Check with a volt meter.
13. Keep circuit controls and motors clean and dust free. Keep the entire air loop free of dust to avoid heat generation. Accumulated heat sources can easily ignite flying dust or flammable vapors suspended in the air.
14. Prohibit the use of liquid fluids to clean any electrical components unless otherwise specified.
15. Do not start the appliance without the protective cover in place.
16. Do not start the machine if there are unsafe elements such as worn or corroded parts or if it is not installed.
17. In case of leakage of water or electricity, evacuate people by the person in charge and then repair by an electrician.
18. First do stand-alone debugging, contact with the manufacturer to assist, make a good debugging record (all aspects of the parameters) technical requirements. After entering the water, to carry out linkage commissioning.
19. After the completion of stand-alone commissioning, the first into the water, flushing the caliber of the process piping in the mud, debris.
20.