Why does the quality management system require a compilation of forms

Because the quality management system requirements of the project more, and the answer is concise language, sometimes with a word can be described, if the article-style expression is very troublesome, but also may be narrated by Lori verbose, judgment of the language may also be biased, by the next quality management system project to see, with the form of an article can be resolved, to express the speed of speech to be used for a longer period, so the quality management system requires the table Compilation.

1 General Provisions 2 Terminology 3 Basic Provisions 3.1 General Provisions 3.2 Acceptance of major equipment, materials, finished products and semi-finished goods into the field 3.3 Process handover confirmation 4 overhead lines and pole mounted electrical equipment installation 4.1 Master Project 4.2 General Project 5 Transformers, box-type substation installation 5.1 Master Project 5.2 General Project 6 sets of distribution cabinets, control cabinets (panels, platforms) and power, lighting distribution boxes (panels) and power distribution boxes (panels). Distribution box (panel) 6.1 Project 6.2 General 7 low-voltage motors, electric heaters and electric actuators to check the wiring 7.1 Project 7.2 General 8 diesel generator set installation 8.1 Project 8.2 General 9 uninterruptible power supply installation 9.1 Project 9.2 General 10 low-voltage electrical power equipment testing and commissioning 10.1 Project 10.2 General 11 bare busbar, closed circuit busbar, power supply system, power supply system, power distribution system, power distribution system, lighting system, power distribution system, lighting system, power distribution system, power distribution system, power distribution system, lighting system, power distribution system, power distribution system, power distribution system, lighting system, power distribution system, lighting system, lighting system, etc. General Item 11 Installation of bare busbar, closed busbar and jointed busbar 11.1 Controlled Item 11.2 General Item 12 Installation of cable trays and laying of cables in trays 12.1 Controlled Item 12.2 General Item 13 Laying of cables in cable trenches and cable shafts 13.1 Controlled Item 13.2 General Item 14 Laying of wires, cables and conduits and trenching of wire 14.1 Controlled Item 14.2 General Item 15 Wires and cables through pipes and tunnels 14.2 General Item 15 Wires and cables through pipes and tunnels 14.2 General Item 15 Wires and cables through tubing and tunnelling Item 15 Wire, cable conduit and trench laying 15.1 OC Item 15.2 General Item 16 Slot plate wiring 16.1 Item 16.2 General Item 17 Outline cable wiring 17.1 OC Item 17.2 General Item 18 Cable head fabrication splicing and line insulation testing 18.1 OC Item 18.2 General Item 19 Installation of general light fixtures 20 Installation of special light fixtures 21 Landscape lighting, aerial obstruction marker lights and building Lighting, aviation obstacle marking lights and garden lights installation22 Switches, sockets, fan installation23 Building lighting energized test run24 Grounding device installation25 Lightning lead and substation room grounding trunking26 Flashover installation27 Building equipotential linkage28 Division (sub-division) acceptance of the projectAppendix A generator handover testAppendix B low-voltage appliance handover testAppendix C busbar bolts lapped in inches Appendix D busbar lap bolt tightening torque Appendix E indoor bare busbar minimum safe net torque of the specification of the word description