What information should be reported on the construction of towed pipe
Directional drilling control records, guide bar drilling control records, reexpansion of the hole records, pulling the pipe record sheet, directional drilling drag construction process quality assessment form, process quality inspection sheet, hidden works inspection and acceptance records, pre-inspection works inspection records, directional drilling pipeline inspection batch quality acceptance records,