Three excellent examples of work plans about maintenance

An excellent work plan can make you stand out in the future work, but we write the premise of the plan is to fully understand their own work in practice, you really will write a work plan? Here is my organization about the maintenance work plan excellent example of three, take a look at it.

Maintenance work plan 1

? Near the end of the year, the equipment security center to do a good job in all maintenance work to protect the premise of peace, and actively communicate with relevant departments to carry out a number of maintenance work. Work appliance maintenance, focusing on the completion of the nickel mine elevated hopper clearing object production, maintenance of the lighthouse and so on.

? First, the material out of storage

? In December, the equipment security center materials out of 2775, 9 yuan, including fuel oil out of 212, 99 yuan, instrumentation 551, 72 yuan, finished metal products out of 1955, 16 yuan.

? Second, the flow of machine maintenance

? This month on time to complete the key equipment maintenance, maintenance of machine failure 128 times, including maintenance of electrical failure 45 times, maintenance dispatch completion rate of 96, 09%.

?1, complete the forklift 4 # steering cylinder oil seepage repair;

?2, complete the frontal crane 1 # operating handle and gear switch replacement;

?3, complete the sweeper 1 # roller brush replacement;

?4, complete the crane 2 # outriggers support the maintenance of the up;

?5, complete the forklift 5 # right side of the tilting cylinder oil seepage repair;

?5, complete the forklift 5 # right side of the tilt cylinder seepage repair;

?

?6, complete the forklift 2 # right steering wheel bearing replacement;

?7, complete the tractor 6 # left rear tire replacement, tractor 5 # right front tire replacement;

?8, complete the bucket 5 # left steering cylinder oil seepage repair;

?9, complete the tractor 1 #, 2 #, 3 # sealing of the related work;

?10, to complete the 205 field generator use of security maintenance.

? Third, the gate machine maintenance

? This month on time to complete the door machine maintenance plan and the maintenance plan of the work appliance, real-time repair of the door machine failure 86 times, grab failure 31 times; door machine maintenance sent to complete the rate of 95, 35%, the work appliance sent to complete the rate of maintenance 90, 32%.

?1, complete KS25-04 # equalization beam fracture repair work;

?2, complete the 11 # door machine walking gearbox oil seepage disposal punishment;

?3, complete the 2 # door machine before the left wire rope replacement;

?4, complete the 5 # door machine centralized lubrication pump repair;

?5, Completion of 16 # door machine wire rope to do head maintenance;

?6, complete a container stabilizer modification work;

?7, complete 4 sets of sub-timber grab repair plastic repair;

?8, complete three nickel elevated hopper hopper cracking repair welding;;

?9, complete 3 sets of nickel grab a coal grab a timber grab wire rope exchange

?

?10, to complete a nickel ore grab bucket body welding repair, a nickel ore grab under the beam accumulator plate welding repair

? Fourth, the peace and environmental protection

?1, welcome the group equipment reflection center actively **** with the operation of the department to carry out the workshop and the port daily use of machines and equipment reflection campaign, in addition to hidden danger to ensure safety. Do a detailed inspection of the door machine flow machine and grab objects, etc., on the invention of the fault and the existence of hidden trouble real-time maintenance and disposal of punishment.

?2, sprinting to keep the whole year, the last month of the 100-day accident-free production campaign, all aspects of the workshop and the port maintenance operations to promote the safety of the supervision, comprehensive investigation and management of hidden accidents, to improve the workers' awareness of self-coverage, the implementation of safety precautions, and strive to achieve the year without a variety of reported accidents.

?3, December 17, the center of the organization of the door machine patch class members to apply the noon time for port machine maintenance and repair of basic knowledge learning, focusing on combing the daily maintenance tasks in the various basic points and the site operation of the operation specification, to improve the maintenance of the personnel operation of the self-safety vigilance awareness, enhance the implementation of regional closure and responsible person responsible for the system;

?4, the organization to carry out New Year's Day before the fire prevention related reflections, **** invented 3 bottles of underpressure fire extinguishers, real-time report and do the replacement, to ensure that "safety first, prevention first" guidelines, through a clear responsibility for safety, strengthen the implementation of the responsibility to enhance the safety of governance, and to further promote the implementation of the work of the production of peace

? Fifth, next month's work plan

?1, *** with the operation center to complete the delivery of grabber 1 # of the use of work;

?2, complete the door reducer gearbox oil seepage repair work;

?3, to complete the bucket car 4 #, 5 # of the lifting cylinder of the oil seepage of the maintenance;

?4, to ensure that the 205 field of generators for normal use;

?5, Do a good job in the preparation of the materials before the Spring Festival.

? Maintenance work plan 2

? Article 1: Purpose

? In order to make the company's production equipment, preventive maintenance, routine maintenance, failure to repair spare parts management, maintenance performance operations to follow, in order to maintain the normal operation of production equipment, reduce the failure rate to improve productivity, the establishment of this approach.

? Article 2: Scope

? Where the production of machinery, electrical gas instrumentation, utility equipment and other maintenance, are in accordance with the provisions of this approach to deal with the scope of the following:

?1, the division of authority and responsibility of the unit and duties

?2, the establishment of the equipment benchmarking information

?3, maintenance and lubrication program set up

?4, maintenance and lubrication program implementation and verification.

?5, fault repair.

?6, spare parts requisition and management.

?7, welding, gas welding operation management.

?8, maintenance performance review.

? Article 3: Organization name and functions

? First, the names of the departments and related personnel mentioned in these measures, are based on the current organizational structure.

? Second, in the event of organizational restructuring, the General Manager's Office to convene the relevant people to review the revision.

? Article 4: The division of powers and duties of the organization

? First, the management unit

? (A) management: the Ministry of Finance and Accounting for the management of the Company's equipment.

? (B) maintenance and maintenance department

?1. Production Department maintenance unit (because of the work required to distinguish between mechanical and electrical groups), responsible for the production of business-related construction equipment, machinery and equipment, storage equipment, electrical instrumentation equipment and miscellaneous equipment and other maintenance.

?2. Ministry of Administration, General Affairs Unit: responsible for non-production of the Ministry of Public Works unit of other equipment maintenance.

?3. The use of the department: responsible for the use of equipment maintenance and repair, the use of the department is difficult to divide the management of the department for the use of the department.

? Second, the duties of the relevant departments

? (A) Management:

?1, the establishment of equipment books and to be categorized into operational norms.

?2, with the maintenance of the maintenance department to establish the maintenance of the equipment specification.

?3, supervise the use of the department in accordance with the norms of the implementation of the maintenance work

?4, regular contracts with the use of departmental inventory of the equipment used in accordance with the operation of the company's equipment inventory management operations.

?5, at any time to check the equipment registration card contained in the name, specifications, and the number of whether the actual match

?6, the production of labels on the equipment to facilitate the custodian and inventory.

? (B) maintenance department

?1, to assist in the installation of newly purchased equipment, test drive and acceptance.

?2, the implementation of fault repair.

?3, the preparation and implementation of regular maintenance program.

?4, equipment use abnormal response and failure cause analysis.

?5, commissioned external repair application, supervision and acceptance.

?6, energy saving program implementation and follow-up.

?7, the use of departmental lubrication maintenance, lubrication implementation review.

?8, the equipment file establishment and...

?8, the equipment files.

?9, idle equipment refurbishment or scrapping proposals

?10, work improvement, equipment improvement program implementation tracking

?11, spare parts use control and audit.

?12, other matters assigned by the superior

? (C) the use of equipment department

?1, to assist the installation of new equipment, test drive, acceptance and other operations.

?2, equipment cleaning, organization and maintenance of the surrounding environment.

?3, in accordance with the maintenance and lubrication standards for the implementation of equipment maintenance operations.

?4, to assist in the regular maintenance of equipment, fault repair operations.

?5, equipment improvement proposal.

?6, other superior matters.

? Article 5: the establishment of basic equipment information

? First, the establishment of basic information on equipment

? (A) new equipment installation, test run after the completion of maintenance units should be in charge of the main customer in accordance with the equipment manual and other information to establish the original equipment registry, and will be related to the manual, drawings and other information into the equipment maintenance file management.

? (B) equipment such as improvement, replacement and other changes in the situation, the director of the public works unit should be based on the actual change in the situation to amend the information.

? (C) equipment maintenance files should include:

1. equipment important elements

2. installation and commissioning status.

?3. Spare parts details.

?4. Inspection benchmarks.

?5. Lubrication reference.

?6. Maintenance records.

?7. Lubrication records.

?8. Equipment failure cause analysis and countermeasure program.

? Second, the establishment of equipment inspection benchmarks

?1. Equipment in the installation test run completed, the labor unit supervisor should be based on the characteristics of the equipment drawings, maintenance instructions, operating conditions and other information, the preparation of equipment containing the inspection items, inspection methods, judgment standards, treatment, inspection cycle, inspection of personnel and other items of equipment inspection benchmarks

?2. After the completion of the equipment inspection benchmark table, the production department manager called the use of the main unit to turn over and review the general manager approved the announcement of the implementation.

? Third, the establishment of equipment lubrication benchmarks

?1. Public works unit supervisors should be the existing equipment, based on equipment information, lubrication instructions, operating conditions, etc. to establish the lubrication part of the equipment, the use of grease, inspection cycles, oil change benchmarks, the person responsible for the lubrication of equipment benchmarks table

?2. equipment inspection benchmarks table after the completion of the call by the manager of the Ministry of Production to the use of the main unit of the flip and review. After the completion of the equipment inspection benchmark table by the production manager to convene the use of the main unit to turn over and review, the general manager approved the announcement of the implementation.

Maintenance work plan 3

? With the promotion of the hospital three a, the logistics maintenance class of the General Affairs Section requirements are further high, the new year is coming, maintenance class all personnel will be in the section chief and and hospital leadership of the correct leadership and guidance, comprehensively implement the scientific concept of development, improve the quality of thought and quality of service, to do a good job of the hospital's logistical maintenance and security work, and always set up a clinical front-line service needs to improve the quality of medical services in our hospitals and work hard. Now develop the work plan for 20xx:

? First, energy saving: energy saving for next year's maintenance class work focus, advocating conservation of electricity and water, water, resolutely to put an end to running, leakage and dripping, found that the damage is timely maintenance, electricity to develop energy-saving programs to reduce the power consumption of lighting equipment, and gradually phase out high-energy, low energy-efficiency equipment.

? Second, equipment maintenance and testing: Regular maintenance and testing of power distribution facilities in the hospital's computer rooms and the hospital's main distribution room, including transformer level temperature rise, effective grounding resistance testing of the distribution cabinet.

? Third, personnel training: maintenance team members shall each be licensed to work, including high-voltage electrician into the network operating license, elevator operating license, generator operating license, sewage treatment room personnel shall hold a sewage treatment operating license.

? Fourth, safety production: to achieve electricity safety, production safety, to eliminate all accidents, strict compliance with all kinds of electromechanical equipment, fire safety facilities operating procedures, adhere to the maintenance and repair, and strive to improve the safety awareness of all members of the self-protection capabilities, prevention is the mainstay of the combination of precautionary measures to eliminate the hidden dangers of unsafe production, and to eliminate accidents

? Fifth, the head of the class work: adhere to each week under the section of the inspection tour system, found that the problem of timely processing, do a good job of the hospital's water and electricity energy consumption meter reading statistics.

? Sixth, the plan to rectify and maintenance projects: rectification of outpatient building facade decoration line, outpatient fee indoor line rectification, the hospital internal and external telephone line rectification, the hospital air conditioning drainage network rectification, the hospital broken air conditioning bracket rectification, outpatient clinic on the fourth floor of the biochemical room total distribution box rectification, the blood dialysis room water storage facilities and the water room line rectification, the wards of the old window rectification and repair.

? Seven, saving maintenance costs: promote diligence and simple savings, can repair as much as possible to repair, never replace.

? Eight, work discipline: strictly abide by the work discipline and duty system, duty personnel adhere to the workstation, to ensure the smooth progress of the work of the hospital.

?