I. Project Overview: Project Name: xxxxxx Hospital Project Territory: Kunming Construction Unit: xxxx Limited Design Unit: xxxx Design and Research Institute Company Limited Survey Unit: xxxx Engineering Survey Company Limited Supervision Unit: xxx Construction Supervision Company Limited Construction Unit: xxx Construction Engineering Company Limited 1.Architectural overview of the project is located in Kunming xxx, the project's total The project is located in Kunming xxx, with a total land area of mu, a net land area of mu, *** buildings, of which the total residential construction area is xx square meters (of which the above ground construction area is xxxx square meters and the underground construction area is xxx square meters), and there are underground motor vehicle parking spaces of xxx, and non-motor vehicle parking spaces of xxx. Second, the grid management significance and objectives 1.grid management significance 1.1 to ensure the safety and quality of the project site, improve the quality and safety of the project responsibility guarantee system, the implementation of safety and quality responsibility, to prevent the occurrence of major safety accidents in the mega-projects to promote the development of the grid management work. 1.2 engineering grid management, refers to relying on a unified project management platform, will manage the area according to a certain standard divided into unit grids, through strengthening the management of the project, to ensure the safety of the project site. standards into unit grids, and by strengthening the inspection of works, sites and personnel in the unit grids, establishing a way of dynamic management of works with active discovery and timely disposal coordinated with supervision and disposal.1.3 According to the above requirements, combining with the actual situation of the project, on the basis of unified management of the general contracting, the management area will be divided into unit grids according to the stage of construction and the content of construction. Through the formulation of strong management measures and the implementation of grid management for each area, all kinds of events occurring in the construction process will be discovered and disposed of in a timely manner. By identifying the hazardous sources on the construction site in advance and formulating control and management measures, we can reduce the accident rate as much as possible, eliminate major casualties and injuries, reduce minor injuries, and achieve the expected management effect. 2. Grid management objectives 2.1 Safety objectives ensure that the construction and production of major accidents is "zero"; pass the certification of DBJ08-903-2003 safety production assurance system; pass the certification of DBJ08-903-2003 safety production assurance system; pass the certification of DBJ08-903-2003 safety production assurance system. -2003 safety production assurance system certification; accident injury rate control at 0.15% or less; put an end to major casualties, fires, traffic, pipelines, equipment, food poisoning and other major accidents; Third, the grid management organizational structure and responsibilities 1.Grid management organization chart grid management leading group grid management work group patrol 5 people (2 times / day) grid management personnel 2. Leading organization (leading group) 2.1 Leading group composed of personnel description: group leader for the supervision unit superintendent engineer; deputy group leader for the general contractor responsible for the unit and supervision engineers; members of the general contracting unit and the main person in charge of each subcontracting unit. 2.2 Composition of personnel group leader: xxx deputy group leader: xxxxxxxx members: xxxxxxxx 2.3 Responsibilities: 2.3.1 Gridded management in major 2.3.2 Regular (weekly) to listen to the project grid management report, to provide leadership support for the grid management work. 3 grid management work organization (working group) 3.1 working group composition: group leader for the general contracting unit of the production manager; deputy group leader for the various subcontracting units of the production manager; members of the group for the general contracting unit and the various subcontracting unit safety officer. 3.2 personnel composition: xxx deputy group leader: xxxxxxxx 3.2 Personnel composition team leader: xxx deputy team leader: xxx team members: xxxxxxxxxxxx3.3 Responsibilities: 3.3.1 team leader, deputy team leader is responsible for the overall coordination and operation of the grid management. 3.3.2 regular organization of the grid management work meeting, to strengthen the communication of information, the content of the meeting in writing, the formation of the minutes of the meeting.3.3.2.1. Regular (once a week) to the grid management leading group ) to the grid management leading group to report the work. 3.3.3 Responsibilities of the team members: 3.3.3.1. responsible for the unified planning and management of grid management, the construction of the grid management information platform. 3.3.3.2. implementation of the staffing arrangements for the various management areas, and clarify the duties and responsibilities of the positions. 3.3.3.3. responsible for the development of the rules of grid management and operation, and the monthly inspection of the effectiveness of the on-site grid management, the Grid management operation to assess and make recommendations. 3.3.3.4. Responsible for grid management data collection and management, responsible for grid management team related training and assessment. 3.3.4 Part of the working group members at the same time to supervise and inspect the work of the grid management personnel, responsible for the daily inspection of the cell grid, check the existence of safety hazards in the cell. 4. Grid management personnel 4.1.1 Site management personnel for the general contracting unit and each subcontracting unit of the guardian. 4.1.2 Composition of personnel team leader: xxx deputy team leader: xxx team members: xxxxxx 4.2 Responsibilities 4.2.1 guardian is responsible for the daily supervision of the cell grid, to do the cell when someone construction, must be on duty, and every day to do a good job of the guardianship record. 4.2.2 guardian found problems in a timely manner, and need to be in the guardianship record. Disposal, and need to leave traces on the guardianship record to ensure that the situation before and after rectification is closed. Disposal of the results and can not be disposed of in a timely manner to report to the working group. Fourth, the grid management operation 1. current construction progress: 2. construction site zoning 3. construction team at this stage 4. dynamic management measures 4.1 engineering grid management must be carried out throughout the whole process of the project since the start to completion. 4.2 with the progress of the project, curtain wall, electromechanical, decorative and other professional subcontracting units one after another into the field, subcontracting units must be included in a timely manner in the grid management system. 4.3 general contract, Subcontracting each unit of responsible personnel arrangements to achieve layered implementation, clear job responsibilities, the implementation of block management.5. Information feedback and disposal mechanism5.1 by the general contractor is responsible for the collection and summary of the grid operation.5.2 to establish an information communication mechanism, do a good job of the grid management operation records and archives, especially for the discovery of undesirable events, dispositions, cancellation of the process of recording, if necessary, to save the image data.5.3 to establish a good information interaction **** enjoyment system, for the scene can be disposed of in time, the grid management personnel should be disposed of in time and recorded; for the scene can not be disposed of in time, the grid management personnel must be reported to the working group and the leading group at the first time, and the working group will organize the timely disposal of the work group.5.4 The project establishes and implements a safety assurance system, which aims to provide a system by providing the system provided by a structured and systematic Operation mechanism, based on planning (P) implementation (D) inspection (C) improvement (A) composed of a dynamic cycle process, can effectively self-control in the construction activities of the project may have a negative impact on the safety, environmental construction activities of a variety of hazards and environmental factors, so that the project structure to achieve and systematically control their own set up a level of safety performance, so as to achieve the ultimate goal of continuous improvement.6. 6.1 Safety Management Measures Take safety production as the focus of standardized management, strictly implement the "site standardization management regulations" and all relevant measures, the construction site must strictly implement the six disciplines of safety production and "construction work at height safety technical measures", "safety technical specifications for the use of construction machinery", "safety technical specifications for the temporary use of electricity on the construction site", "general scaffolding safety technical provisions for building construction", "construction site Fire Prevention Provisions", "Construction Site Machinery and Equipment Safety Management Provisions", "Construction Site Electrical Management Provisions" and other relevant regulations, so as to achieve "safety first, prevention first".6.2 Establish the production safety assurance system, clear management personnel production safety responsibility system, and written submission by the project manager.6.3 Do a good job of safety All management personnel firmly establish the concept of "safety moment not forget, safety management is justified", so that the construction site found hidden dangers immediately rectify, found illegal immediately stop, to ensure that the project safety goals are achieved. 6.4 All operators to participate in the construction of the operation shall be qualified by the safety and technical operation training. Operators have the right to refuse instructions that violate safety regulations and are strictly prohibited from working under the influence of alcohol.6.5 Organize weekly inspections of safety facilities in all departments and subcontracting units, and make timely rectification of hidden dangers.6.6 Hang safety propaganda slogans and warning signs in key areas, work sites, danger zones, and passageways according to the situation.6.7 All personnel who are required to hold a license as stipulated by the Municipal Construction Committee and the Bureau of Labor Affairs must be certified to work.6.8 Strictly prohibit non-site staff from entering the construction area.6.9 Strong management measures for specialized subcontracting units6.9.1 Include subcontractors in the safety management system, and sign the contract together with the agreement on production safety and the regulations on financial penalties for on-site violations.6.9.2 Sign fire prevention agreements with outsourcing teams and subcontracting units to implement fire prevention responsibilities.6.9.3 Review the production safety assurance system of subcontracting units. 6.9.4 Implement daily roll-call assessment system for the number of safety officer allocation and attendance of subcontracting units. 6.9.5 If subcontracting units need to use safety facilities, the general contractor will handle the written handover procedures and carry out safety handover to implement the responsible body, and the general contractor will strengthen the supervision and management during the process. 6.9.6 Strictly control the fire operation of subcontracting units, and uniformly issue the fire certificate by the general contractor, and put the daily fire area on the wall in time, and strengthen the monitoring in the process.6.9.7 When the subcontracting unit carries out the operation of the next process, organize the subcontracting unit of the previous process in time to hand over the work surface, and make clear the main body of responsibility.7. 7. Grid management personnel configuration 7.1 Structural construction stage 7.2 Decorative construction stage in the subsequent construction stage of the refinement of the complementary. V. Inspection and assessment measures 1. inspectors must make daily inspection records, and report the work to the working group on a daily basis. 2. the working group will report the work to the leading group of grid-based management on a weekly basis. 3. each management area will carry out a monthly check of the operation of the grid-based management, self-assessment, and the assessment will be reported to the working group. 4. the working group will supervise the supervision of the site guardianship work, and the first time it will find a problem warning, the The second financial penalties, the third personnel adjustments. 5. The leading group of the working group of the leader and deputy leader of the comprehensive assessment. Sixth, the grid management safety measures 1.Significant sources of danger and control measures 1.1 large machinery installation and demolition works (construction elevators, people and goods elevators) 1.1.1 before the installation of the site site survey, according to the actual situation of the site to prepare the installation of the construction program. Select reasonable construction location and installation machinery, should ensure that the construction elevator and the surrounding facilities have sufficient safety distance.1.1.2 Operators are licensed, and have the appropriate professional knowledge, the installer should enter the site wearing safety protection products, work at height, must find the appropriate place in its own position, fasten the safety belt, hang up the insurance hooks.1.1.3 The conductor must be familiar with the installation of the operating program 1.1.4 Check each mechanism of mounting and dismounting machinery, structural welded joints, important parts of bolts, pins, winch mechanisms and wire ropes, hooks, spreaders, and electrical equipment, wiring, etc. before use, and eliminate hidden dangers in time.1.1.5 Complete information on hidden engineering of equipment foundations, testing and acceptance of machinery, and measures for preventing equipment 1.1.6 Before installation and dismantling construction, set up safety warning area, and implement special person to carry out "bystander" whole process monitoring. 1.1.7 After installation, it must be tested and qualified by relevant departments and issued certificate before use. 1.2 Supporting mold project 1.2.1 Prepare special plan. 1.2.2 Before operation, the equipment and electrical equipment shall be inspected and checked. 1.2.1 Before operation, the equipment and electrical equipment shall be inspected. 1.2.2 Before operation, conduct briefing for operators according to the requirements of the program and record it. 1.2.3 Setting up of frame uprights, crossbars, scissor braces, sweeping rods, insurance fasteners, etc. is in accordance with the requirements of the program to ensure the stability of the frame. Only after acceptance by the supervisor and general contractor can the next process be carried out.1.2.4 Safety technical briefing should be carried out before dismantling the template, set up a warning line, and implement special guardianship.1.2.5 Supporting and dismantling of molds of more than 52 meters must be preceded by the erection of operating platforms, set up protective rails, and the operators must be equipped with safety belts and hang high and use low.1.3 Hoisting construction (steel structure, equipment) 1.3.1 Hoisting operation of this project Mainly have the main structure of the section steel column and section steel beam lifting, roof steel structure lifting, installation equipment and other large equipment lifting.1.3.2 Before the operation of the preparation of lifting special construction program, and through the approval of the superiors, non-routine lifting operations must be organized to assess the experts.1.3.3 lifting, in accordance with the requirements of the organization of the lifting machinery, foundation bearing capacity, the surrounding environment, and other lifting conditions of acceptance, before the formal operation. 1.3.4 Strictly abide by the lifting machinery, "ten do not hang" regulations, lifting radius of the area set up a safety cordon and the implementation of special guardianship. 1.3.5 lifting and hoisting workers must be licensed, up and down the command to the post in place, the signal is unobstructed. Strictly prohibit unauthorized command, unauthorized operation.1.4 Emergency plan
More about engineering/service/procurement bid writing production, enhance the winning rate, you can click on the bottom of the official website customer service free advice:/#/?source=bdzd