1, the organization of the plant's daily management of equipment, in-depth inspection of the workshop to guide the workshop equipment management, to ensure that the production of normal and stable. Every day can go into the workshop production line to check and understand the operation of the important equipment, tracking the inventory and procurement of major spare parts, urging the Department of Supply on the procurement of the main shortage of spare parts, check the workshop homemade parts processing production, to ensure that the main parts with the use of with; check and supervise the workshop to do a good job in the day-to-day maintenance of the equipment, and technical guidance; reasonable arrangements for the production and maintenance of the equipment Reasonable arrangement of production and equipment maintenance work, encounter abnormalities and make timely adjustments, encounter repair tasks, do a good job in the three workshops mechanic staff deployment. Strengthened the ** workshop equipment inspection tours, strengthened the ** workshop equipment spare parts program of the thoroughness and adequate spare parts preparation work. after May focus on ** workshop to grab the site management, irregularly checking the reactor's important indicators "temperature" to avoid abnormal corrosion of the cylinder. Strengthened the equipment of the work of the leakage, so that the workshop equipment, production environment greatly improved.
2, the design of 7 # reactor expansion project drawings, equipment, material planning and implementation. Planning and organizing equipment installation.
3, design **** workshop 18,000 tons of fluorite drying line drawings, planning and organization of equipment installation.
4, design **** workshop 40,000 tons of fluorite drying line drawings, planning and organization of equipment installation. In the design and construction process, to do can use the old equipment as much as possible with the old, spend less money to do a good job of the company. As scheduled to meet the design requirements.
5, put forward the third production line of the second section of the furnace to add a set of extraction and dust collection system program, many times on the elevator to check the transformation of the furnace hood to solve the smoky material problems.
6, the second reactor slag way from the neutralization furnace, belt machine way to transform the spiral machine way, reducing the number of second reactor failure downtime.
7, participate in the technical reform of sewage treatment equipment, cooling water with sludge problem has improved.
8, the organization of the production workshop equipment overhaul, the acid production workshop of the reactor cylinder overhaul put forward a new overhaul concept, and get the support of the workshop. For the 20xx annual equipment integrity rate increased to lay the foundation.
9, strengthened the daily inspection of equipment, timely detection of equipment operation fault hidden danger, notify the workshop to deal with timely. So that the equipment failure did not further development, improve the equipment operation rate.
10, actively participate in the workshop's technical reform and overhaul work, as a good technical reform and overhaul work of the leading role, so that the technical reform and overhaul work completed on schedule.
11, efforts to respond to the company's call, and actively participate in the training work, their knowledge and technology unreservedly to the workers. Carry out equipment training courses 1 time.
12, physically, lead by example, to maintain the same spirit with the company, do the work to be done, do a good job, do a good job of mentality. Correctly guide the workers to keep in line with the company, to maintain the stability of production and normal development.