Xi'an 15th wastewater treatment plant status

The Xi'an 15th Wastewater Treatment Plant is a key project for wastewater treatment in Xi'an. It is located in the south section of Baisha Road, Baqiao District, Xi'an and was put into operation in 2007. The plant adopts biological contact oxidation process and secondary A2/O process for wastewater treatment, with a design scale of 60,000 tons of wastewater per day. The plant is currently in good operating condition and is able to meet the local sewage treatment needs. At the same time, in order to ensure the quality of wastewater treatment, the plant is equipped with a series of advanced wastewater treatment equipment and monitoring equipment, such as automatic COD monitors, automatic ammonia nitrogen monitors, and so on. In addition, the wastewater treatment plant is also committed to improving the utilization of resources, through the anaerobic digestion and compression of sludge, drying treatment, etc., the sludge will be converted into organic fertilizer, to achieve the utilization of resources.