Shelf labor contract model

Scaffolding project construction labor contract

Party A: project department

Party B: scaffolding class

According to the "Chinese People's Republic of China *** and the State Construction Law" and "Labor Law" and the relevant provisions of the management, in order to high-quality, high-speed, safe, low-consumption completion of the project and ancillary works of the construction task, after friendly consultation between the two sides, the scaffolding works of the project will be contracted to the B side of the construction, in order to clarify the rights and obligations of both parties, the following contract is drawn up and *** with the implementation of the contract. Construction, in order to clarify the rights and obligations of both parties, the following contract is drawn up, and *** with the implementation of compliance.

I. Project Overview

1. Project Name:

2. Project Location:

3. Building Area:M2

4. Structure Type and Height:

2. Contracting Mode and Contracting Contents

1. excellent), package construction period, package safety and civilized construction.

2, the scope of contracting:

①This project according to the provisions of all the external scaffolding; the inner wall of the super-high masonry frame, plastering frame, stairwells, duplex floor, including: the site of all the edges and holes in the protection; concrete pouring and transportation channel, pedestrian pavement resting platforms, unloading platforms; depending on the ramp, the transport ramps, safe passage, all the safety rack mixing station, platform protection racks; with the nails Gantry pile, temporary shed scaffolding, other machinery and equipment shed; horizontal and vertical safety nets and protection boards hanging; tower crane attached to the scaffolding set up and removal and protection; with the construction elevator and other vertical transportation equipment installation.

②The scaffolding material on-site transfer and material out of the loading, materials according to the project department requirements cleaning, stacking, into the warehouse;.

3 ③ the production of concrete pads for the outer frame; temporary cleaning and replacement of fasteners; picket or unloading and other iron parts used in the pre-buried; safety banners, safety signs hanging, construction scaffolding, anti-mixing railing due to the construction needs of many times the repetitive erection and dismantling and hanging of safety nets.

④The construction team will provide its own tools and purchase its own auxiliary materials as required, including: nails, hammers, wire (18# for hanging safety net), oxygen welding equipment, board hand, helmets, rain gear, gray wire, gloves and so on.

⑤Painting of racking pipes and protective railings for external racking (including removal of accumulated dirt on pipe walls).

Three, labor contracting costs

1, Party B to complete the required work content, construction quality to achieve excellent standards, work safety and civilized construction have reached the requirements of Party A, the labor contracting costs according to the unit price of the construction area of yuan (yuan)/M2.

2, the unit price of labor contracting, in addition to including the completion of the type of work content, auxiliary materials, and bring their own equipment and maintenance costs also include a variety of equipment. Machine maintenance costs also include a variety of allowances and subsidies, overtime on holidays, night work, rush subsidies; labor insurance premiums, safety supplies, medical expenses, labor management fees; site civilization construction costs and quality, safety, schedule, civilized construction to meet the standards of the costs incurred and all other foreseeable and unforeseeable costs. It also includes the cost of losses due to risk events resulting from the occurrence of the risk factors present, in particular security risks.

Fourth, labor payment:

1. When the project starts from the foundation and the main body is completed up to the sixteenth floor, Party A will start to pay the labor payment to Party B. The amount of this payment will be 60% of the amount of the labor fee for the amount of the work completed under this contract (floor area). Subsequently, according to the construction unit (the owner side) to the project department project progress payment approval, by party A to party B for payment, the payment amount for the batch of time period, this labor contract to complete the amount of work (floor area) labor payment of 60%, to the main body of the roof inspection and acceptance of the passage, paid to the total amount of labor payment of the contract of 80%, the unit of the project after the completion of the acceptance of the total amount of labor payment of the contract of 90%, and the rest of the 10% The remaining 10% will be settled half a year after the acceptance of the unit work.

2. The payment for labor shall be deducted from the amount of liquidated damages payable by Party B to Party A during the time period of the payment batch and the cost of the meal ticket received by Party B.

3, the payment must be applied by Party B, signed by Party A's competent constructor, quality inspector, safety officer, general engineer, the project manager signed the agreement to be paid.

Fifth, the quality of the project

1, Party B must be strictly in accordance with the design drawings, the relevant norms and technical instructions for construction, to ensure that the scope of contracting the quality of the sub-projects to meet the standards of the national acceptance criteria in force, where it does not meet the national norms and requirements of Party A, Party A has the right to make it rework, rework all the costs of materials and materials by Party B is responsible for rework, rework is still not up to the requirements or can not be reworked in a timely manner in accordance with the requirements of the Party, Party A has the right to order rework. After reworking, Party A has the right to instruct the relevant team to assist in reworking, and Party B will bear the costs incurred in reworking.

2, strict implementation of quality self-inspection, mutual inspection, handover inspection "three inspection" system, and make a good record, meet the requirements, notify the Party A professional builder acceptance, no Party A professional builder acceptance record, the construction of this type of construction program has not been completed, and can not be carried out in the next process.

3, Party A's professional constructor in the construction process inspection or acceptance of the corrective comments made, Party B must be implemented according to the rules, the refusal to implement the corrective comments, by Party B to Party A to pay liquidated damages.

4, quality inspection and evaluation of Party A, supervision, Party B, three acceptance shall prevail, the results of which as the basis for payment of labor costs.

Sixth, the schedule

1) Party B must be issued by Party A to control the total progress of the schedule, the monthly progress of the plan for decomposition, decomposition of weekly and daily schedule, and reported to Party A for approval for the record, the progress of Party A's plan must be completed on time or ahead of schedule.

2) Monthly assessment of the progress of Party B's construction, due to Party B's reasons for the second consecutive failure to meet the schedule requirements, Party A has the right to order Party B to unconditionally withdraw from the site, and at the same time terminate the contract.

3) traditional holidays, legal holidays or busy season, Party B must stay staff, according to Party A requirements to complete the construction tasks.

4) If the progress is delayed for more than one day due to Party A's reasons, the construction period will be postponed.

Seven, safe production, civilized construction

1) Party B shall carry out the construction in accordance with the production principle of safe production and civilized construction, and during the construction period, it shall actively cooperate with Party A on the three-level education and management of the team, and do a good job on the safety of the team itself, and it shall strengthen the education of civilized construction within the team, and improve the civilized construction of the site as well as cleanliness and hygiene within the lodgings.

2) Party B's work floor, construction site and materials yard and the work of the garbage pile must be in Party A's designated location, to do neatly stacked, in order, or Party A will assign someone to clean up the labor costs used in Party B settlement doubled deduction.

3) Party B must follow the safety rules and regulations, strengthen safety management, all types of work require a license. Party A provides qualified protective materials, machinery and equipment; Party B has the right to refuse to use the materials and equipment that do not meet the safety standards, Party B must civilize the construction in accordance with the safety regulations, and shall not take risks. For illegal instructions, you can refuse to accept, the team leader must coordinate the construction of each type of construction links, to eliminate man-made safety hazards, and effectively improve safety production, during the construction period, such as Party B's reasons for the occurrence of safety accidents, the cost of accidents are borne by Party B. Safety accidents caused by non-Party B, by Party A, Party B, and the labor inspection department together with the analysis of the accident responsibility, in accordance with the national labor insurance policy and related regulations. regulations.

4) Other terms and conditions are detailed in the "Project Management System" which is attached to the contract.

VIII. Duties of both parties

I. Duties of Party A

①Party A will provide accommodation for Party B (Party B will bring its own luggage and buy its own tableware).

② Party A organization of Party B construction personnel for engineering quality, safety, civilized construction induction training;

③ Party A according to the production of Party B's work, and Party B for the sub-project technical instructions and technical guidance, to solve the technical problems encountered in the construction.

④Party A will provide Party B with materials and construction machinery except for Party B's own machinery and auxiliary materials.

⑤ Party A will provide temporary water source and power source to each floor.

6 Party A will pay the labor fee in time according to the contract.

2, Party B's responsibility

①, Party B must organize the skilled construction operators and the corresponding management team to enter the site with the induction certificate, and must seriously hand over the general information of the project and the relevant rules and regulations to all the construction workers, and Party B will be responsible for the unclear explanation or failure to hand over the information; the content of the handing over will include: a general information of the project and the quality of the provisions of the b safety responsibility system and the c construction period limitation days. norms c the implementation of the work period to limit the number of days of control d a variety of rules and regulations and civilized construction requirements; Party B is strictly prohibited from hiring child labor.

②, bring their own machinery and equipment must be clearly marked, and attached to the list to Party A in order to clean up the exit;

③, Party B must be in accordance with the engineering drawings, Party A's construction program, technology standards, technical instructions and current building construction norms and other requirements of Party A organization of the construction must be on schedule, quality, quantity, and safety to complete the undertaken sub-contracting;

4 Party B must abide by Party A's rules and regulations, and obey Party A's unified command and dispatch to ensure the smooth flow of orders.

⑤ Party B must report the required material plan to Party A one week in advance, Party B construction personnel shall not arbitrarily change the construction process of the racking and dismantling, if there is a waste of Party A's materials, Party B doubled the value of the loss of materials to Party A compensation;

⑥ Party B must take care of the construction equipment provided by Party A, if damaged or lost, the price of the compensation;

⑦ Party B's construction personnel uniform dress, uniform rain jacket, civilized Uniform dress, uniform raincoat, civilized construction, consciously maintain the surrounding environment, shall not damage any public property and trees in the field, if any damage to the price of compensation.

8 Party B in the construction must comply with the relevant provisions of production safety, production safety education.

9 Party B personnel are strictly prohibited in the construction site area and the accommodation area using electric stoves and other equipment for heating and cooking, prohibit indiscriminate, indiscriminate connection of all kinds of wires.

Nine, the use of materials

Incoming steel pipe, steel wire, safety nets, fasteners and fastener screws and nuts and other materials, before use, Party B must declare to Party A in advance of the material used in the plan and fill out the material list, clean up the frame tube according to the specifications of the field of 100% by the Party acceptance of the warehouse, such as the loss of the necessary, the need to explain the reason; fasteners and fasteners and fasteners screws and nuts according to the 99% of the delivery of the inventory, beyond the prescribed loss of part of Party B as a result of the acceptance. Exceeding the loss of part of the provisions of Party B at the price of compensation.

Ten, other matters

1, after the signing of the labor contract, Party B into the field personnel must be fully documented, there shall be no personnel and criminal personnel, must be into the field personnel roster reported to Party A, the roster must be reported to the corresponding personnel with the corresponding personnel ID card name consistent with the local administrative work with the Party. Party B must ensure the stability of its team staff, can not arbitrarily increase or decrease the number of personnel, such as changes must be provided to Party A three days before the change in the list of personnel, Party B should be in the Party designated and agreed to increase or decrease the labor force within a period of time, otherwise, according to the difference in the number of each increase or decrease in the number of people by the B party to Party B to pay liquidated damages.

2, Party B designated comrades for the site responsible for the coordination of work with the Ministry of the project and the team, Party B shall not be responsible for unauthorized absence, and every morning and evening to the Party A professional construction workers report, such as the need to leave must be agreed to by Party A's main person in charge, and appoint an acting responsible person, such as the site responsible for unauthorized absence of the other impacts caused by the person in charge of the site, Party B bears all the responsibility for the economic loss of its responsibility and Related responsibilities.

3, the construction process, such as no Party A instructions, Party B shall not be unauthorized stoppages, such as the occurrence of unauthorized stoppages, Party B unconditionally indemnify Party A for all losses, and according to the degree of impact on the project by Party B to Party A to pay the liquidated damages from 1,000 yuan to 10,000 yuan.

4, Party B must do a good job within the scope of the contract for the protection of finished products, semi-finished products, shall not destroy other finished products and semi-finished products, or according to the status of the loss of double to Party A compensation.

5, Party B contracted the scope of work shall not be subcontracted, otherwise it will unconditionally withdraw from the site, and terminate the contract at the same time.

6, Party B must always be ready to rain, snow construction, equipped with rain, snow construction of the required labor insurance products, all labor insurance costs have been included in the contract price, Party A does not bear.

7, such as Party B does not fulfill the contract, the rest of the money as payment of Party A liquidated damages.

8, the contract is not exhaustive, supplemented.

The above terms from the date of signature of both parties, the project payment is completed, the contract is automatically terminated; this contract in two copies, Party A, Party B, a copy.

Party A's representative (signature): Party B's representative (signature):