In today's social life, we use on the commitment letter is increasing day by day, using the right writing ideas to write a commitment letter will be more half the effort. Or are you at a loss for commitment letters? The following is my collection of 10 quality commitment letter, only for reference, welcome to read.
Quality commitment letter of Part 1
Commitment:
Commitment line:
Commitment content: the commitment of the line in the business activities, strictly in accordance with the following commitments to carry out business activities, such as the violation, consciously accept all levels of road transport management institutions in accordance with the law.
1, in the operation of the strict "six do not", namely: do not sell passengers, do not pull the strong transport, do not circle soliciting, do not change the logo, do not deceive the passengers, do not rudeness to the passengers;
2, according to the provisions of the hanging line signage, not private line signage;
3, according to the provisions of the line operation, According to the provisions of the station stops, not outside the station soliciting passengers, soliciting along the street.
4, strictly do a good job on the way up and down the passengers of the "three goods" checking and blocking work;
5, on the way due to breakdowns or accidents, can not continue to drive, and actively take measures to organize passenger transfer;
6, the driver and crew in accordance with the provisions of the documents;
7, consciously obey the traffic and transport management. Obedience to traffic, transport management, consciously accept the transport law enforcement officers to monitor and inspect;
8, in case of emergency, follow the scheduling, on time to complete the foreign affairs, disaster relief and other emergency transport tasks.
Commitment (seal):
Year month
Quality commitment letter of the Part 2First, the standard service commitment stipulated in the bidding documents
Commitment to the project bidding documents all the provisions of the procurement and service scope of all the content, as well as for the completion of the above content necessary for quality assurance and technical support, Construction, supply, installation, acceptance, testing, technical training, after-sales service, as well as payment methods, rights and obligations, default liability provisions and requirements.
Second, the warranty period of the service commitment
The supply unit for the equipment quality assurance period of 24 months, the calculation of the starting time, from the government departments to issue the "elevator safety inspection" certificate of the date of commencement of the calculation.
1, I will be based on the project, the establishment of a specialized maintenance team to deal with the project warranty period inside and outside the maintenance work. The number of elevators in each project reaches the number of commitment to the station, not to reach the number of units of the project we will use the way to cover to ensure that the daily maintenance work.
2, in the warranty period, the presence of the project Division I will be in minutes (non-resident minutes) to send personnel to the scene of the failure, free troubleshooting, repair or replacement of parts and components, troubleshooting (non-mainframe, door machine and control cabinet core components failure) time is generally no more than hours.
3, the warranty period, in the national holidays, such as the Spring Festival, May Day, National Day, free of charge on the elevator to carry out a comprehensive inspection, to ensure that the elevator in the normal use of holidays.
4. During the warranty period, the elevator will be maintained once a month and inspected once a quarter.
5, the supply unit free of charge to provide the buyer on-site training, training content see "free training program".
Our company as your company Yakshi tomato juice, Yakshi carrot juice goods suppliers, in order to ensure the quality and safety of the products supplied by our company, especially to your company to make the following commitments:
First, on our business qualifications commitment
We are committed to provide your company with a legally valid business license, tax registration certificate and business production license and other necessary documents. production license and other necessary documents.
Second, about our commitment to supply goods
1, all the goods supplied by our company have qualified "Quality Inspection Report" and the relevant product certification, in line with the relevant provisions of the state; and to ensure the timely provision of food companies need external inspection reports, food grade certificate, the national food additives designated manufacturer production certificate and all other documents, and to ensure that all the documents are true, legal and effective.
2, I supply all the goods to go such as your written confirmation of the supply brand, the use of performance and quality indicators related to the use of the specified goods manufacturers, formulas, production processes, etc. will not be arbitrarily replaced, such as replacement, our company will be replaced before at least 20 working days prior to the written notification of your company.
3, the shelf life of the goods supplied by our company is by no means less than the shelf life of the products labeled (from the date of manufacture of the products labeled). If the quality of the products supplied by us causes product quality problems or adverse effects on your company, we will voluntarily undertake to compensate for 1-10 times the price of the goods and bear all the losses and legal liabilities arising therefrom.
4, our company recognizes your company's goods acceptance system and warehouse storage conditions, and in the acceptance of the corresponding goods, voluntarily and strictly abide by your company's goods acceptance system.
5, our company did not pass the acceptance of the goods, our company guarantees that in your company within the specified time to replenish the qualified goods, or voluntarily bear all the losses caused by this.
6, our company on the acceptance of the goods through the company before your company put into use, the relevant license is incomplete, brand does not match and any quality problems, our company promises to return unconditionally, and in your company within the time limit to replenish qualified goods, or voluntarily bear all the losses caused by this.
7, our company promises never to add add additives other than those stipulated in laws and regulations, and to ensure that the use of additives within the scope of the state allows the use of additives, and not to exceed the amount and scope of the use of additives, or else we voluntarily undertake to pay compensation for the price of the batch of goods 1-10 times the price of the goods, and to bear all the losses caused by the resulting losses and legal responsibility.
8, our company promises to strictly abide by the national management regulations on labeling and marking, to ensure that the product packaging meets the requirements.
9, I promise to comply with the contract provisions, never add your company specified not to add or may not contain substances, or voluntarily bear all the resulting losses and legal liability.
10, my company promises to strictly abide by the relevant state laws and regulations, on the food business raw materials, additives, the latest provisions, and to ensure the timely implementation of the implementation of the company without the need for your company to notify again.
Quality Commitment ` Part 4Supply Contract
Supply unit ___________________ (referred to as Party A) Incoming unit: __________________ (referred to as Party B)
I. Party A obligations
1. Party A shall be a party with a "business license", "Organization Code", "Tax Registration Certificate" and other certificates that have the ability to fulfill the contract. Tax Registration Certificate" and other legal enterprises with the ability to fulfill the contract, and shall provide a copy of the qualification with a red seal to Party B.
2. The goods supplied by Party A must be original and genuine.
3. Party A shall provide inspection reports and certificates of conformity of the goods sold.
Second, Party B's obligations
1. After the arrival and acceptance of the goods, Party B within 7 days to settle all payments.
Third, the agreement explains
1. Party A provides the goods quality does not comply with the provisions (including the name, specifications, number, weight, expiration date, etc.), Party B has the right to refuse to accept, Party A should actively deal with the aftermath. Within the validity period of the goods: Party A is responsible for the quality of the goods it sells, if the quality is unqualified (as determined by the factory), the two sides agreed to bear the economic losses, but due to the quality problems caused by Party B's construction process, Party B will bear the losses.
2. Party A must ensure that Party B order the next day.
3. This agreement and the contract has the same legal effect, a party in breach of contract, consultation to resolve, consultation fails, by the ruling.
4. This agreement is valid for ________ years.
Party A (signature): ____________ Party B (signature):
year _______ month _____ year _______ month _____ day
Quality commitment letter of the Part 5First, the company according to iso9001: XX quality system requirements, the raw materials into the factory, the production of products and the process of inspection strict management, to ensure that unqualified raw materials do not enter the factory, product production and process inspection. Ensure that unqualified raw materials do not enter the factory, unqualified semi-finished products do not flow into the next process, unqualified products will never leave the factory.
Secondly, the normal service life of new composite material manhole cover sold by our company is 15 years.
Third, the customer must install the manhole cover in strict accordance with the requirements of the installation instructions, and the case of not installing the manhole cover according to the installation instructions is not covered by the warranty. For the correct installation, within the normal service life, our company implements lifelong maintenance for the new composite material manhole cover products sold.
Fourth, the company according to iso9001: XX quality system requirements of production and operation, set up by the professional composition of the user service group.
Fifth, the company guarantees that the production and inspection are strictly according to the relevant national standards and enterprise standards that are stricter than the national standards, and the products are delivered to the customers on time according to the quality and quantity.
Sixth, the company sells products, free maintenance within two years, lifelong maintenance, warranty period, non-demanding side of the human factor and the emergence of quality problems, the supply side is responsible for the implementation of the "three packages" (package repair, package, package, package replacement) services, and bear the actual cost of repairs, replacements or returns, warranty period outside the repair only charges Parts and accessories costs.
Seventh, the company has an after-sales service organization, to provide users with 24-hour hotline service and long-term free technical support, in the warranty period, if the product quality reasons affecting the use of the user, the company guarantees that after receiving the report, the Pearl River Delta users within 6 hours to respond within 12 hours to arrive at the scene to deal with the incident, the provinces it is the region in the 24 hours to arrive at the scene to deal with the incident. If the fault can not be repaired within the agreed time, the company will provide free goods of the same grade to the user for temporary use.
Commitment: XXX
Time: XXXX year XX month XX
Quality Commitment Part 6XXX company from the official put into the non-scheduled tourist passenger transportation, in the quality of transport services, the following commitments:
1, abide by the rules and regulations, according to the law of operation. Operating vehicle documents, licenses are complete and valid. Vehicle technical condition in line with national standards, vehicle intact, and regularly do a good job of secondary maintenance to ensure safety.
2, the company's drivers are taken to drive the vehicle compatible with the license, more than five years of driving experience, no accident record. In addition, the company regularly carries out safety training and education for drivers,
3, strict compliance with the relevant provisions of the contract signed, timely deployment of vehicles, regularly scheduled buses.
4, the car, car appearance clean and sanitary, strict sterilization, smoking is strictly prohibited, to ensure that the car environment.
5, strictly require drivers to drive in accordance with operating procedures, and resolutely put an end to speeding, overloading and other violations
6, strict compliance with the relevant provisions of the transport management department, the company's vehicles are for the relevant insurance.
7, the establishment of customer files, improve service quality. In addition to customer tracking services, the company is also responsible for collecting and organizing customer complaints, consulting information, to ensure that the problems and requirements of the customer, to be dealt with in a timely manner.
8, the establishment of passenger service hotline, timely help travelers to solve practical difficulties or problems during the journey.
9, to ensure that one person a, not overloaded, not over-seat, strict compliance with traffic laws and regulations, polite and courteous safe driving.
10, the vehicle running speed limit control, the use of GPS, car recorder on the operation of the vehicle to implement dynamic monitoring.
11, to maintain the company's image, the implementation of Putonghua, polite, uniformed service, properly handle the travelers to our company's service complaints.
Quality Commitment Part 7Longwu - Zeku 110kV transmission line project, will strictly abide by the "Construction Project Quality Management Regulations", "Construction Project Safety Management Regulations", "110kV ~ 500kV overhead transmission line construction level acceptance specification", "State Grid Project Construction Standard Production Management Regulations", consciously fulfill the due obligations. Due diligence obligations, in order to reflect my and the enterprise's determination to comply with the law, is now special to Qinghai Thermal Power Engineering Company Transmission and Transformation Branch solemnly make the following commitments:
1, strict implementation of the company's C version of the quality system documents. Scientific management, continuous improvement of product quality, with satisfactory service, to meet customer needs.
2, 110kV Longwu - Zeku transmission line project, to achieve the project up to standard put into operation, to ensure the quality of workmanship, to provide high quality and efficient service, and strive to create a provincial company "transmission and substation project safety and civilization construction standardization demonstration project";
3, construction project inspection rate 70%, the inspection accuracy rate is greater than 95%, the data record reaches 98%, the project acceptance rate reaches 100%, the hidden project inspection content is complete, complete visa formalities;
4, transmission and substation engineering project acceptance rate of more than 90%; sub-projects is greater than 85%, the unit engineering rate is greater than 85%; customer satisfaction is greater than 85 points;
5, the quality of technical data software in line with the relevant provisions, so that the data and the progress of the project synchronization;
6, the strict implementation of the material purchase inspection system, to eliminate unqualified products into the construction site;
7, in strict accordance with the provisions of the company's use of machinery and equipment, and regular maintenance;
8, the strict implementation of the three-tier acceptance of engineering quality system, the previous process is not qualified strictly prohibited to enter the next process. Qualified strictly prohibited to enter the next process;
9, strengthen the management of subcontracting units;
10, other violations of laws and regulations.
11, willing to accept branch leaders at all levels, the owner of the supervision and other professional companies to monitor. From the quality of service, engineering quality, schedule progress, from the management, technology to the operation of the construction to start strictly good quality. To establish a good image for the enterprise.
This guarantee in duplicate, power transmission branch and I each hold a copy.
Power Transmission Branch
Project Manager: Commitment:
Monthly
Quality Commitment Part 8Our participation in the project bidding (bidding number:, such as winning the bid, our company guarantees that the service according to the following terms:
First, the quality of the equipment commitment:
1, the performance of the equipment testing and quality of the perception of the quality of quality records and testing information. Records and testing information.
2, the detection of equipment performance, we invite users to come to the equipment for the whole process, the whole performance check, to be confirmed that the equipment is qualified before packing and shipping.
Second, the equipment price commitment:
1, in order to ensure the high reliability of the equipment and advanced, the system selection of materials are selected from domestic or international high-quality brand-name equipment.
2, in the same competitive conditions, I do not reduce the technical performance of the equipment, change the cost of equipment components, based on the sincerity of the most favorable price to your side.
Third, the delivery date commitment:
1, equipment delivery: as far as possible according to user requirements, if there are special requirements, need to be completed in advance, I try to arrange for professional staff to install equipment, and strive to meet user needs.
2, equipment delivery, our company to the user to bring the following services and documents;
① technical maintenance and repair manuals
② equipment manuals and manufacturers
④ related operator training courses
Fourth, after-sales service commitment:
1, the service objective: fast, decisive, accurate, thoughtful, thorough
2, service goals: service quality to win customer satisfaction3, service principles: equipment warranty period of 36 months, the warranty period, the supplier will be free of charge to repair and replace the quality of the parts caused by damage, damage to parts outside the warranty period, to bring the parts only cost charges, the demand side of the equipment damage caused by human factors, the supply side of the repair or to bring the parts are based on the cost of the price. The company to the user to bring a full range of technical services, in the implementation of the project in all phases, the company's engineers will be fully for the user to bring quality services.
4, service mode: the company brings 7 * 24 hours of telephone service support, for the user's service request, within one hour, the first through the phone and other means of technical support.
Contact: XXX
Phone: XXXXXXXXXXXXXX
5, the system upgrade service
In the quality assurance period, all the projects involved in the equipment of the free upgrade of the system software, the company will send engineers are responsible for the specific upgrading to ensure that it does not affect the operation of the system.
6, the system operation of technical consulting services
Whether in the warranty period, or outside the warranty period, the company free of charge for the customer to bring technical consulting services, which include: new technology consulting, configuration adjustments, troubleshooting and so on. Anytime and anywhere to answer the customer's technical inquiries.
7, inspection services
According to the needs of users, the company to bring regular inspection services to ensure that the system works properly, and fill out the "engineering inspection report.
If we violate the above commitments, we will be penalized in the settlement of payments and other aspects of the contract, we have no objection.
Quality Commitment Part 9
In order to regulate the operation of my school teaching behavior, improve the quality of training, optimize the training service, safeguard the legitimate rights and interests of both sides of the teaching and learning, to do the student satisfaction, social cognition, the government assured of civilized driving school, I myself strict self-discipline, accept the supervision. Commitment is as follows:
First, abide by the rules and regulations, legal teaching. Implementation of national laws and regulations, strict implementation of the rules and regulations of the driving school, do not eat, take, card, want, do not accept gifts and banquets in disguise;
Second, integrity-based, standardized training. The implementation of the Ministry of Transportation promulgated the "motor vehicle driving training program" and "motor vehicle driving training program", do not reduce the student's training hours and training content without authorization;
Third, scientific and technological innovation, energy saving and emission reduction. Fair and impartial treatment of each student, not picking and choosing, fair and reasonable to teach each student, according to the material teaching, patience and meticulous, and constantly improve the quality of service and teaching methods, to be recognized by the students of the excellent instructors;
Fourth, regular maintenance, strict management. Strict implementation of the coach maintenance and inspection system, regular maintenance and testing of coaches, three daily checks to ensure that the coach is in good condition;
Fifth, safety training, teaching in accordance with the law. The teaching of safety-oriented, to protect the students, their own and the driving school property safety;
Six, accept the supervision, rewards and punishments. Strictly implement and accept the social supervision system, driving school training service quality ranking and performance bond system, accept the students and driving school comments, standardize the teaching behavior;
VII, voluntarily pay performance bond 20xx yuan, such as the violation of the above commitments, voluntarily accept the breach of contract compensation and processing.
Driving school (signature):
Instructor (signature):
June 18, 2010
Quality Commitment Part 10Supervisory station:
Our company has won the bidding for the residential building project according to the law, and now we are completing the foundation project, in order to ensure the quality of the construction and safe production, we make the following commitments:
The company is also responsible for the construction of the residential building project. Not subcontracting or illegal subcontracting.
2, the establishment of quality responsibility system, responsible for the construction quality of construction works. According to the law, the construction works will be distributed to other units, the quality of its subcontracted works to bear joint and several responsibility.
3, in accordance with the engineering design drawings and construction technical standards of construction, without unauthorized modification of the engineering design, without cutting corners. In the construction process found in the design documents and drawings have errors, timely comments and suggestions.
4, in accordance with the engineering design requirements, construction technical standards and contractual agreements, building materials, components, equipment and commercial concrete inspection; without inspection or unqualified test, do not use.
5, the establishment of a sound construction quality inspection system, strict process management, good quality inspection of hidden works and records
6, involving structural safety of the test blocks, test pieces and related information, in the construction unit or the project supervision unit witnessed on-site sampling, and sent to the appropriate qualification level of the quality of the quality testing unit for quality testing.
7, the establishment of a sound education and training system, to strengthen the education and training of employees; without education and training or assessment of unqualified personnel, not on duty.
8, according to law to fulfill the quality of construction projects warranty obligations.
(B) safety
1, according to the corresponding level of qualification certificates, and in the qualification level within the scope of the license to undertake the project.
2, the main person in charge of the unit in accordance with the law is fully responsible for production safety. Establish and improve the production safety responsibility system and production safety education and training system, the development of production safety rules and regulations and operating procedures, to ensure that the unit of production safety conditions required for the investment of funds, the construction works undertaken by the regular and special safety inspections, and make a good record of safety inspections.
The person in charge of the project is a person who has obtained the corresponding licensing qualifications, and is responsible for the safe construction of the construction project, the implementation of the production safety responsibility system, production safety rules and regulations and operating procedures, to ensure the effective use of production safety costs, and according to the characteristics of the project to organize and develop safe construction measures to eliminate hidden safety accidents, timely and truthful reporting of production safety accidents.
3, the establishment of production safety management organization, with full-time production safety management personnel.
Full-time production safety management personnel are responsible for on-site supervision and inspection of production safety. Discover hidden dangers of safety accidents. Promptly report to the project manager and the production safety management organization; for unauthorized command and operation, immediately stop.
4, vertical transportation machinery operators, installation and dismantling workers, demolition operators
lifting signal workers, scaffolding operators and other special operators, in accordance with the relevant provisions of the state after special training in safety operations, and obtain a special operations qualification certificate, on duty.
5, in the construction of the organizational design of the preparation of safety and technical measures and construction site temporary power plan, for the more dangerous sub-parts of the project, in accordance with the national and provincial and municipal regulations for the preparation of special construction programs, review and expert verification, meet the requirements of the organization and implementation.
6, construction projects before the construction, the technical personnel responsible for project management of the technical requirements related to safety construction to the construction team, the operator to explain in detail, and signed by both parties to confirm.
7, at the entrance to the construction site, construction cranes, temporary power facilities, scaffolding, access to the mouth, stairways, elevator shafts, holes, bridges, tunnels, the edge of the pit, explosives and hazardous dangerous gases and liquids storage and other dangerous parts. Set up obvious safety warning signs.
According to the different stages of construction and the surrounding environment and seasonal and climatic changes, the construction site to take appropriate safety measures. If the construction site is temporarily suspended, do a good job of site protection.
8, will be set up separately from the construction site office, living area and operating area, and maintain a safe distance; office, living area site selection in line with the safety requirements. Employee meals, drinking water, resting places, etc. in line with health standards. Not set up in the building has not been completed staff group quarters.
9, due to construction works may cause damage to adjacent buildings, structures
underground pipelines, etc., to take special protective measures.
Comply with the provisions of relevant environmental protection laws and regulations, and take measures at the construction site to prevent or reduce the hazards and pollution of dust, exhaust gas, wastewater, solid waste, noise, vibration and construction lighting on people and the environment.
10, in the urban areas of the city's construction projects, support the construction site to implement closed enclosure.
In the construction site to establish a fire safety responsibility system, to determine the fire safety responsibility. The development of fire, electricity, the use of flammable, explosive materials and other fire safety management system and operating procedures, set up fire escapes, fire water, equipped with fire fighting facilities and fire fighting equipment, and set up a clear sign at the entrance to the construction site.
11, to provide safety protective equipment and safety protective clothing to the operating personnel, and informed in writing of the operating procedures of dangerous jobs and the hazards of unauthorized operation.
12, the operators to comply with the mandatory standards of safety construction, rules and regulations and operating procedures. Correct use of safety protective gear, machinery and equipment.
13, procurement, rental production (manufacturing) license, product certification of safety protective gear, machinery and equipment, construction equipment and accessories, and check before entering the construction site.
Construction site safety gear, machinery and equipment, construction equipment and accessories arranged for special management, regular inspection, repair and maintenance, the establishment of the appropriate file information, and in accordance with the relevant provisions of the state timely retirement.
14, in the use of construction cranes and overall lifting scaffolding, templates and other self-erecting erection facilities before the organization of the relevant units for acceptance, or commissioned with the appropriate qualifications of the testing and inspection agency for acceptance; the use of leased machinery and equipment and construction machinery and fittings, acceptance and use.
15, the main person in charge, the project manager, full-time production safety management personnel qualified by the competent administrative department of construction or other relevant departments to serve. Managers and operators at least once a year for production safety education and training, their education and training is recorded in the individual work files.
16, for construction sites engaged in hazardous operations for accidental injury insurance.