Equipment handling contract

Six Sample Equipment Moving Contracts

With the establishment of people's legal awareness, anytime, anywhere, all kinds of scenarios are likely to use the contract, the signing of the contract can lead to the two sides regulate the commitment and fulfillment of cooperation. Then how to draw up the contract? I think this makes everyone very distressed, the following is what I have organized for you equipment handling contract 6, welcome to read and collect.

Equipment handling contract Part 1

Party A:

Party B:

After the two sides **** with the consultation, Dr. Zhejiang Baby Love Technology Co.

First, the scope of contracting and work

production equipment, raw materials, finished products, and the company's production and operation needs of other loading and unloading work.

Second, the contract period from January to January.

Third, the contract fee and payment

Party B to Party A to pay a contract deposit of ten thousand yuan (10000.00 yuan). Party B's wages are settled by piecework, with specific reference to the attachment to this contract. Wages are paid to Party B's employees on Party A's payday.

Fourth, the rights and obligations of both parties

1, Party A must pay Party B's contracting fees as agreed.

2, Party B must obey the management of the warehouseman and the management of the production department.

3. Party A must notify Party B by phone or in writing half an hour in advance and issue handling instructions. If Party B's response time is more than 1 hour, Party A will bear all the losses caused by untimely handling. The amount of this loss will be deducted from the total amount of the contract for that month.

4. Party B is responsible for the recruitment of handling personnel, but the recruited personnel must meet the employment standards of Party A

Company, and Party B is responsible for solving the labor problems of Party B's employees. All the personnel of Party B must comply with the management system of Party A. If they violate the rules, they will be punished according to the company's regulations.

5, Party B must seriously grasp the safety of handling and civilized handling work, if the goods are damaged due to Party B's man-made reasons, full compensation is required. Do a good job of staff 's ideological education and safety training. Party B must pay attention to safety in the factory work process, the safety accidents occurring outside the factory by Party B is fully responsible.

V. Other

1. Party B employees are not entitled to other benefits (including overtime pay for statutory holidays, full attendance bonus, etc.).

2, in the loading and unloading process shall not receive all the costs of the customer (such as found to receive customer cash and materials, each time a fine of one thousand dollars).

3, in the actual work in the event of the contract is not written matters, the two sides and then negotiate to solve the problem, to make additional provisions, additional provisions and this contract has the same effect.

4, the annex to this contract is part of this contract, and this contract has the same legal effect.

5. This contract shall enter into force on the date of signing. Both parties *** with the compliance, in case of default, the contracting fee of one month of Party B as liquidated damages. This contract in duplicate, Party A and Party B each sign a copy. ___________________

Phone: _____________________

Moving Company (Party B): _________

Address: _____________________

Contact: ___________________

Phone: _____________________

After the A and B parties **** the same consultation, hereby enter into this contract for both parties **** the same compliance.

I. Name of the goods: _____________________________________.

(Both parties may indicate the quantity and value of the goods in the list of goods, as an annex to this contract, and this contract has the same legal effect)

Second, the goods moved out of the place: _________________________________.

iii. Place where the goods are moved to: _________________________________.

iv. Model: _________________________________________.

v. Scheduled date of goods removal: _________ on _________.

VI. Packaging requirements: Party A shall carry out standard packaging according to Party B's requirements. It can also be packed by Party B, but the items should be checked before packing to ensure safe transportation.

VII. Party B's responsibility

Party B guarantees that the goods will be transported safely to the designated location within the period specified in the contract. The goods to be transported to be responsible for the safety of the goods to ensure that there is no shortage of goods, no damage, no man-made deterioration. In the loading and unloading, transportation in the event of loss of goods, shortages, deterioration, damage, etc., in principle, according to the market price of the arrival place to compensate. If otherwise agreed, compensation shall be made according to the agreed limit. However, if the lack of goods and damage is caused by force majeure, reasonable wear and tear of the properties of the goods themselves or Party A's fault, Party B will not be liable for compensation.

VIII. General cargo insurance is the responsibility of Party B, and Party A is responsible for the insurance of valuable cargo. Party A shall inspect the delivered goods in time, and if the goods are not received after the due date, Party A shall pay the storage cost

IX. The total cost of packaging and transportation: _________________________________.

X. Settlement: Party A has paid a deposit _________. The remaining amount _________ is paid in a lump sum after the goods arrive and are accepted as complete.

XI, Party A's liability for breach of contract: Party B will be required to deliver the goods, if Party A does not pay the full amount of transportation fees and storage fees, Party B has a lien on the goods.

XII, arising from this contract or any dispute related to this contract, the parties shall negotiate to resolve; consultation fails, according to the following _________ way to resolve:

1. Submitted to the _________ Arbitration Commission arbitration;

2. According to the law to the people's court.

13, this contract will be terminated after the performance of both parties. Matters not yet resolved by the two sides.

Party A (signature): _________

_________ year ____ month ____ day

Signing place: _____________

Party B (seal): _________

Responsible person (signature): _______

_________ Year ____ Month ____ Day

Signed at _____________

Equipment Moving Contract Part 3

Party A (Demanding Party):

Party B (Supplying Party):

Party A and Party B, after friendly negotiation, in accordance with the "Chinese People's Republic of China", "Chinese People's Republic of China", "Chinese People's Republic of China", and the "Law of Construction" and the Relevant laws and regulations, in accordance with the principle of equality, voluntariness, fairness and honesty and credit, the two sides on the procurement and installation of the project consensus to enter into this contract.

Article 1 Overview of the project

Name of the project:

Location of the project:

Content of the contract:

Article 2 Documents constituting the contract

1, the contract and the terms of the contract

2, notice of award

3, tender and its attachments

4, bidding documents

5, the state of the art, the State Council, the State Council of the People's Republic of China, the State Council of the People's Republic of China. p>

5, national laws and regulations, norms, industry standards and relevant technical documents

6, the two sides of the supply of consultation, minutes of meetings and other written agreements or documents are considered part of this contract.

Article III Scope and conditions of the contract

The scope and conditions of this contract shall be consistent with the provisions of the above contract documents, the mode of delivery for the turnkey project.

Article IV Contract Price

Party B ordered (including transportation) of RMB ¥ yuan, installation of RMB ¥ yuan, a total of RMB ¥ yuan, capital RMB yuan. Its product name, specifications, quantity, unit price, manufacturer, technical specifications and functions, spare parts, wearing parts, imported and domestic parts list, maintenance schedule, five to ten years of wearing parts quotation, etc. See the attached table.

Article B to Party A in accordance with the contract agreed on time delivery and construction, completion, bear the quality of the equipment, and in the quality warranty period to bear the responsibility of engineering quality warranty.

Article 6 Party B undertakes to pay the contract price in accordance with the contract period and manner.

Article VII Contract Entry into Force

Time: Month, year

The place of conclusion of the contract:

The contract is agreed to enter into force after the signature and seal of both parties.

Article VIII number of copies of the contract

Two copies of the original of this contract, each party to save a copy. Both sides agreed to four copies of the contract, each side of the two copies.

Party A: (official seal) Party B: (official seal)

Legal representative: Legal representative:

Date of signing: Date of signing:

Equipment handling contract Part 4

Place of signing:

Signing time:

Party A:

Party B:

In order to rationalize the use of equipment handling costs. In order to rationalize the use of equipment handling costs, safe and smooth completion of the equipment handling work, by the A and B parties to serious consultations, to reach the following agreement.

First, the subject

Party A agreed in principle, "gravure machine production line equipment (transport)

Second, the handling location and time requirements

Party B received a notice of Party A, the handling vehicle should be within a day into the designated site of Party B forklift into the field of all the equipment handling work borne by Party B (according to the requirements of Party B, Party B can provide personnel assistance). Can provide personnel assistance).

Third, handling

Before handling by both parties **** with the test equipment without damage. Party B must choose the appropriate forklift for handling, and according to Party A's designated placement in place to ensure the safety of the equipment in the handling process. If Party B causes damage to the equipment in the process of transportation and damage to other items in the company caused by Party B's responsibility, personal injury to personnel, Party A according to the actual damage valuation, Party B to compensate. In the process of handling, if Party B's responsibility caused by Party B's personnel personal injury, all losses borne by Party B itself.

Fourth, the equipment intact acceptance) pieces", handed over to Party B to move

Party B according to Party A's request to move to the designated location, the equipment by the Ministry of equipment inspection of the equipment intact and in the "equipment intact acceptance of the single" on the signature to confirm.

V. Acceptance requirements

Whether the appearance of the equipment and the same as before the move, there is no impact and other circumstances resulting in damage to the part.

VI. Payment

Party B in accordance with Party A's requirements to the designated location, after Party A acceptance of the equipment is intact and transported to the designated location, after receiving the official invoice to pay the full amount.

VII. If any dispute arises from this contract, both parties should negotiate to solve it. If the consultation fails, then the relevant legal provisions of the implementation

VIII, this contract in duplicate, A and B each party holds a copy, with the same legal effect.

IX. This contract shall come into effect upon signature and seal of both parties.

Party A:

Monthly

Party B:

Monthly

Equipment Moving Contract Part 5

Party A: _________

Party B: _________

In order to rationalize the use of equipment handling costs, safe and smooth completion of the equipment handling work, by the party A, party B serious consultations, reached the following agreement. reached the following agreement.

1. Party A agrees in principle that the finished product warehouse, drying cylinder, doser, powder tanks, and other equipment (***_________ pieces) should be transported by Party B. When Party B receives Party A's notice, it will be transported by Party B, which is the first party in the company. After Party B receives Party A's notice, hoisting and transportation vehicles should enter Party A's designated site within 3 days, and all equipment hoisting and unloading work will be borne by Party B after Party B's hoist enters the site.

2. Party A intends to equipment for the above work of the crane, the use of transportation trucks one-time package to Party B.

3.

3. In order to induce Party B to actively cooperate with Party B in pulling the equipment out of the site as soon as possible, the two sides agreed that Party A would pay a certain amount of coordination fee to Party B. No matter how much difficulty Party B encounters or how long it takes to continue the work, Party B must do its best to load the equipment onto the truck as fast as possible and transport the goods carried by Party B out of the site of the dismantling. Based on the above additional responsibilities undertaken by Party B, Party A will give Party B a coordination fee totaling ***_________ yuan (capitalized: _________ yuan). This fee Party B package dead immovable.

4. After Party B loaded and pulled out of the demolition site to ensure that within _________ days to Party A unloading site. Due to climate and other unforeseen factors, can be extended as appropriate.

5. Party A's total **** to Party B's contribution of _________ yuan (capitals: _________), as a way to go to the road and bridge and other funds needed on the way.

6. Party A does not bear Party B driver accommodation and food and Party B vehicle maintenance costs.

7. Party A provides "loading list", Party B according to the loading list of transportation. Party B must choose suitable cranes, trucks and lorries, and transport them according to the routes specified by Party A to ensure the safety of the equipment in the process of lifting, unloading and transportation. If the equipment is damaged due to Party B's failure to follow Party A's designated routes and speeds, Party B will compensate for the damage according to Party A's valuation of the actual damage.

8. Crane, panel truck and truck costs and payment (1) Party B to bear the personnel, transportation costs totaling _________ yuan (capitals: _________).

(2) the cost of payment: Party B all cranes, transport vehicles into the site, Party A prepaid _________ yuan in full (to pay), as start-up capital, such as all the boarding trucks, trucks (including other carrier unit vehicles) loaded with goods, Party A and then pay _________ yuan in full, the rest of the _________ yuan in full to be transported to the destination of the goods carried by the Party B after one time The remaining yuan will be paid once the goods are transported to the destination by Party B.

(3) Other instructions: Party B will pull Party A's equipment to the destination and safely unloaded, Party A's receiving personnel issued a certificate of completion of transportation, which is the basis for the final settlement.

9. Matters not covered in this agreement, by Party A and Party B to negotiate a supplementary agreement. Supplementary agreement and this agreement have the same effect.

10. This agreement is in four copies, each of the two sides of the two copies, both sides signed and stamped on the date of automatic entry into force, the contract will expire after payment.

Party A (seal): ______________

Legal representative (signature): ________

_________ _______ month ______

Signed at: __________________

Party B (seal): ______________

Legal representative (signature): ________

_________ _______ ______

Signed at: __________________

Equipment Moving Contract Part 6

Party A: _________

Party B: _________

By consensus of both parties, the following terms are entered into, *** together with the trust.

I. Party B undertakes the following projects:

1, equipment moving to the new school: _________ yuan / table, _________ table, _________ yuan, computer desks and chairs _________ yuan / set, _________ set, _________ yuan. Podiums _________, _________ dollars. Other stuff moving costs _________$ (including switch moving, remaining _________ computers and remaining desks and chairs to the main control room, etc.). Total _________ dollars.

2, computer dismantling and installation: _________ yuan / units, _________ units, _________ yuan.

3, network connection: the computer room has a network cable, so no longer buy a network cable. But the network cable is not installed to connect. Network cable production, _________ yuan / node, *** production of _________ nodes, counting _________ yuan. Podium, switch, hub, cabinet installation, broadband incoming cable installation and connection, system debugging, etc. _________ yuan, rj45 connector _________, _________ yuan. All wires are centralized to the podium. Adopt double network isolation program, need to add a network card, _________ yuan. Replace the network cable _________, the original cable is not long enough, _________ yuan. Total _________ yuan

4, power lines and installation: the new district has two computer rooms are not used, one of the power lines are not installed. Need to assemble _________ line line, _________ outlets. _________ yuan / a, counting _________ yuan, distribution box installation and three-phase power deployment costs _________ yuan, materials _________ yuan (including _________ sockets, _________mm2 copper wire _________ package, _________ copper wire _________ package. _________mm2 copper wire _________ meters, _________ road distribution box, etc.). Reliable power delivery of 20 kW or more. Total _________ dollars.

Second, other projects:

1, the new area of the first floor of the multimedia classroom to add a podium floor, multimedia systems can not be directly moved to pan, had to dismantle and re-installation. Including the dismantling of the original podium base plate (_________ yuan, the original base plate for the 5 meters × 2 meters of the whole plate), dismantling the multimedia system (_________ yuan), assembling the podium base plate (by the production of the base plate of the carpentry with), reinstallation of the multimedia system (_________ yuan). The total cost _________ dollars.

2, the _________ computer room power line repair, replace a set of lines, the labor cost _________ yuan.

3, computer (school computer) keyboard replacement 1, _________ yuan.

3, other terms:

1, the quality of materials, the quality of installation, must meet the requirements of each item in the table, the network 100m to the desktop. The project has additional, another negotiation.

2, the duration of the project _________ days, over the period of fine, according to _________ yuan / day.

3, after completion, Party A organization acceptance, acceptance of payment.

4, this contract in two copies, the original Party A 2 copies, Party B 1 copy.

5, the date of signing of this contract: _________ year _________ month _________ day

Party A (seal): _________ Party B (seal): _________

Legal representative (signature): _________ Legal representative (signature): _________

Bank of Account: _________ Bank of Account: _________

Account No.: _________ Account No.: _________

_________ Year ____ Month ____ Day _________ Year ____ Month ____ Day