Inadvertently, a period of time has ended, this period of time since the work, harvested a lot of achievements, is not it time to write a good job summary record? How do we go to write a work summary? The following is a summary of the work of the equipment and facilities I organized, for reference only, let's take a look at it.
Equipment and facilities work summary 1"Revolutionary and new, following the past to start". In the face of this global crisis in the photovoltaic industry, equipment and facilities department in accordance with the unified deployment of the company, the whole staff mobilization, full participation, strengthen awareness, scientific and reasonable to carry out all the work, tamping the foundation, management innovation, highlighting the long term effect, and the company with the breath, **** destiny, and its following for the first half of the department's work summary.
First, strengthen the leadership, sound maintenance system, the strong implementation of comprehensive production security.
1, improve the equipment management assessment system, refine the assessment program.
On the basis of the 20XX equipment management assessment rules, continue to improve the assessment system. Through last year's workshop equipment failure rate, equipment accidents, auxiliary material consumption, spare parts inventory, the implementation of planned maintenance plan for comprehensive analysis, statistics, re-quantification of assessment standards. Through the refinement of the assessment program, change the past equipment management one-size-fits-all model, to ensure that the system can be implemented, the assessment can be in place, and ultimately see the effect of good feedback.
2. Strengthen the implementation of planned maintenance, and steadily promote the fixed inspection and repair.
Through the daily point inspection of the equipment to grasp the state of the equipment in a timely manner, found that there are problems with the equipment, through the planned maintenance approach, to deal with the hidden problems of the equipment. In the past, the purpose of maintenance is not strong, the proposed planned maintenance project and the actual operation of the project is a big difference, resulting in the maintenance staff to implement the weak, spare parts replacement cycle disruption of many problems. For this reason, from the beginning of 20XX, all the inspection and maintenance forms for upgrading, streamlining the original form, for needless, do not want the form resolutely canceled. At the same time, the department to establish the single crystal, polycrystalline, slicing, square equipment, a separate project, highlighting the focus, the establishment of the main equipment resume, the effect is more obvious.
3, analyze the equipment failure, cite a three, the implementation of accident prevention measures, strengthen the supervision and inspection of safety measures.
Through the summary analysis of equipment accidents in recent years, found that part of the equipment failure is due to the operator's comprehensive quality is not high, skills are not skilled, can not reasonably and effectively deal with the unexpected situation, resulting in further deterioration of the consequences. In response to this situation, the Department of Equipment and Facilities organized a professional team to analyze the causes of accidents, especially man-made equipment accidents, recurring equipment failures, formulate preventive measures, and supervise and inspect the preventive measures. Together with the Ministry of Production, respectively, prepared the "equipment safety operating procedures" and "equipment operating instructions", the key, special processes of the staff for job skills training, to strengthen the staff's awareness of safe operation of equipment.
4, to point inspection, lubrication as the center to strengthen equipment management and maintenance work.
In the first half of the year, in the completion of a large number of basic equipment management work at the same time, strengthened the implementation of the system and assessment, to promote the equipment technician post inspection, equipment supervisor special inspection, equipment manager inspection of the three-level inspection and the comprehensive development of the equipment management work. And through the implementation of specialized personnel special responsibility and sub-package management mode, the establishment of repair, maintenance of two groups, reversing the past equipment accidents affect a long time, large loss of production capacity, the passive situation of the equipment repair efficiency under the bottom. Through the professional team daily inspection, on-site equipment lubrication, "running and leaking" phenomenon of inspection and tracking, basically eliminated the equipment due to poor lubrication caused by the phenomenon of failure.
Second, continuous improvement, management innovation, key areas of energy saving
Only low-cost, high efficiency. The department requires all jurisdictions to take active action, focusing on the control of non-silicon costs, to save water and electricity two energy-saving work as a breakthrough, bold innovation, the development of effective methods and measures to strengthen energy saving and consumption reduction work. Organization, planning, implementation and inspection; carry out energy-saving technological transformation, strengthen overhaul management, improve the quality of overhaul and equipment availability coefficients; strengthen the operation management, strict control of peripheral power energy consumption, co-ordination and coordination of the main equipment and supporting facilities, to ensure that the operating parameters of the minimum. At the same time, strengthen the management and supervision of spare parts, reduce inventory, and focus on the recycling of water resources. Based on the passing rate of monocrystalline, polycrystalline and slicing production in the past, through the renovation of the main equipment, together with the Quality Department, we are committed to improving the quality rate and production capacity. On this basis, we have successfully carried out the renovation of the cool water tower in the second workshop of slicing, the lighting circuit renovation, the recycling of polycrystalline heating, and the test of changing pure water to municipal water in the clear bale workshop. Some of these improvements have been completed or are in progress, through the late tracking statistics, the final result of the successful achievement of the expected results, the real meaning for the company to improve the quality and efficiency, enhance the core competitiveness of enterprises.
Third, both the symptoms and root causes, the implementation of long-term effect, personnel structure efficiency has improved significantly
Considering the big picture, from the small things. In view of the company's current situation, the department responded to the company's call to encourage everyone to work with the company **** in trouble, streamlining staffing, duties from the new division, focusing on improving efficiency, emphasizing the ability to do more work, the implementation of flexible performance appraisal system. Cultivate the backbone, actively engaged in skills grading, ability matrix to carry out, optimize the organizational structure. Through the above matters, it can be seen that our equipment and facilities department, dare to do, dare to think, dare to fight, do not give in to weakness, dare to fight for ability, fight for results, a very good exercise of the team, to become the company's front-runner for continuous improvement. Details determine success or failure, in the next work will continue to grasp the equipment management work and technical reform work in the general direction, and actively explore the idea of fine management, equipment and facilities for the Group's efforts to escort the company's ambitious goals.
Equipment and facilities work summary 2In order to eliminate campus safety hazards, to ensure that the majority of teachers and students of life and property safety, my school equipment and facilities, school building safety hazards inspection team in 20xx x month x - September x day of all educational and teaching equipment, facilities and all housing construction in the school carried out a comprehensive inspection. Now the work of the inspection is summarized as follows.
First, the school's daily equipment and facilities inspection
1, the inspection is mainly for my school power lines, education and teaching aids. My school belongs to the Wabu town power resource management station Zhangzui - seven temple area, the campus power lines in strict accordance with the requirements of the power sector, without the phenomenon of indiscriminate wiring. Electricity required by the line, also approved by the relevant state departments of qualified products. And by the electric power department relevant person in charge of wiring to build electricity lines. No private violation of the phenomenon of electricity, the line is intact, no old weathering phenomenon.
2, the campus broadcasting system is running well. Campus broadcasting system in my school by direct frequency conversion broadcasting equipment and external sound two parts. This inspection found that the two parts of the operation of the education is very complete, in the daily teaching and learning can be normal application. It is very good to promote the daily work of the school.
3, sporting goods facilities intact. This inspection for the school daily sporting goods facilities and stay in the children's home special facilities to carry out a comprehensive inspection.
Second, the campus health treatment facilities inspection
1, the classroom garbage disposal division of labor is clear, timely treatment, there is a unified arrangement of the school garbage disposal tools, duty is good.
2, the school's original garbage transfer pool due to changes in the campus environment, the original building location is seriously inappropriate, seriously affecting the overall cleanliness of the campus. Resulting in confetti, bags and other waste products in the breeze will be scattered campus activities area.
Third, the school water facilities to check the situation
1, our school due to the distance from the town center is too far, temporarily unable to use running water. Originally built artificial wells, but because the wells are too shallow, dry period wells without water, rainy period surface water; and the mouth of the well is wider, the summer comes, there are students privately to the well water phenomenon, become a serious safety hazard in my school.
2, for this situation, the school by all teachers to discuss the adoption, and outside the school Sun Minggen signed a construction contract, in the original water wells on the basis of the reconstruction and expansion of the new well, and the water well mouth to lock closed measures, both to ensure the safety of the school's water, but also to solve a major security risks of the school.
Fourth, the future work
The whole school should form a good situation that everyone has a responsibility, everything is done, when there is monitoring, daily supervision, monthly inspection. However, due to a variety of factors, our school safety situation is still very serious, the campus surrounding environment security rectification work is still to be further improved, in this regard, we seriously analyze and have the courage to face up to the school security and the campus surrounding environment security rectification work in the problems.