Digital medical information technology project, the weak electrical system of deepening the design of the standard and the general contracting standard which first recruited?

Generally stronger design institute capacity, project information is sufficient, the site information is detailed, you can first deepen the design bid, but generally are design institute out of the foundation of the weak power construction drawings, recruiting the weak power weak power intelligent system integrator turnkey by the general contractor to deepen the design, Shi Shi installation of the late system integration, etc. House base weak grid to provide the answer to the