Luoyang Yongning Mansion, when will it be built?

Luoyang Yongning Mansion, opening time to be determined.

Luoning County Yongning Mansion Engineering Design Service Project Bidding Announcement

I. Bidding Conditions

Luoning County Yongning Mansion Engineering Design Service Project has been approved by the relevant departments for implementation, now the preliminary work has been prepared, with bidding conditions. Ltd. was commissioned by the Luoning Culture and Tourism Development Group Co. 161110

3 Project Overview: Luoning County Yongning Building is located in Luoning County, Luoyang City, Henan Province. It is adjacent to Xingning Road in the north, and the land for existing buildings is in the east, west and south directions. The project is the in-situ reconstruction project of Yongning Building, with a planned land area of 10043.2_

4 Bidding Scope: architectural scheme design, construction drawings design, and design of human defense engineering

5 Total Project Investment: 143 million yuan

6 Funding Source: Self-financing;

7 Bidding Requirements: Bidders shall provide the entire set of planning and monolithic architectural design program (drawings, renderings, design description), the depth of the program and the content of the drawings should be able to meet the requirements of the Luoning planning department for approval. Design program as an important content of the bidding documents, and business quotes and other technical parts of the content of the bid evaluation together. There is no program compensation fee for unsuccessful bidders in this bidding. The specific architectural design assignment is attached.

8 design cycle: within fifteen calendar days from the effective date of the contract, provide the planning department with the master plan and architectural design program modified in accordance with Party A's comments, and complete the construction drawings and design of the civil defense project within forty-five calendar days after the program is approved. China Mining Recruitment Network

9 design depth: the economic and technical indicators should meet the requirements of Luoyang city building planning and management of technical regulations and combined with the specific requirements of the Yongning Building project to determine.

10 bidding section: the project is divided into a bidding section .