Is there a company that designs and develops the software and hardware of the anodizing automatic line? Including technical services and professional hardware planning?

The appearance of the equipment (this picture shows a closed type, your company is not a fully enclosed type)

The assembly part is as follows:

1. Tank assembly ( Including PP, stainless steel, online drying oven)

2. Frame assembly (trough and crane base with track)

3. Swing and saddle assembly (Oxidated to copper saddle, others are PE saddles)

4. Crown crane assembly

5. FLYBAR assembly (the hanging gear is prepared by the owner according to the product)

6. Peripheral equipment (filter, rectifier power supply, refrigeration system, etc.)

7. Pipeline system (water inlet/drainage pipe, air mixing tube, circulating filter tube, ice Water cooling pipes, steam pipelines, etc.)

8. Control system (including PLC/DMS control, peripheral electrical control, etc.)

9. Exhaust gas treatment system

Equipment specifications and process flow

1. Applicable products and processing contents: notebook casings, TV casings, digital camera casings, 3C electronic products and aluminum plate oxidation surface treatment.

2. Processing process operating conditions

2.1 Automatic pretreatment and oxidation process:

3. The time sequence of each process can be controlled by the intelligent control system Make reasonable modifications

The equipment capacity is not described

The tank body and accessories of each process station

1.1 Tank body material: high-quality PP plate, 12mm, 15mmamp; 20mm Thick, chamfered and welded.

1.2 Inner diameter size: L600mm*W4000mm*H1950mm

1.3 Outer diameter size: L800mm*W4210mm*H1965mm

1.4 Groove edge reinforcement: PP20mm

1.5 Tank body reinforcement: SS41*80mm*40mm*4mm flat tube is used on the outside and 4mmPP same-color PP board is color-coated and welded.

Piping in the tank:

2.1 Ф3/4” PVC water inlet pipe (attached with PVC double-free ball valve) can control the water inlet and supply water volume. The water pipe enters the tank and extends into the tank to a depth of 2 /3 depth, the outlet slope opening ensures the uniformity of water quality, and is equipped with a flow meter to control and monitor water consumption and overflow drainage.

2.2 Ф3/4”/ Ф1” air inlet pipe (with PVC double-coupled pipe). Any ball valve) can control the gas flow. The air inlet pipe passes into the center of the bottom of the tank to evenly distribute the air flow to both sides. The air outlet holes are Ф1.5/Ф2mm in two rows downward (the size of the hole depends on the liquid composition, concentration and crystal size). There are two rows of holes. The angle between the vertical line of the pipe and the center of the pipe is 45°, and the left and right holes are arranged in a staggered manner. The distance between each row of holes is 50mm, which can evenly emit bubbles and fully stir the liquid to promote the mixing function. A siphon hole is drilled obliquely on the upper end of the air pipe to prevent The tank liquid is sucked back, causing cross-contamination of the tank liquid.

2.3 Drainage pipe: Ф 1.25”/ Ф 1.5” PVC drain pipe (with PVC double free ball valve) drained below the bottom of the tank, easy to drain and clean. Tank body. There is a first-level filtering device in front of the liquid outlet to prevent debris from being discharged into the pipeline system and causing system blockage.

2.4 Double-connected water washing tank

2.4.1. Effectively utilize the water source and save water consumption.

2.4.2 The inlet pipe extends into the tank body to make the water concentration in the first-level tank uniform. 3. The overflow mouth is distributed with throttling, and the top enters and the bottom exits, so that the water quality of the second-level water tank is evenly distributed.

Tank manufacturing process:

1. Drawing review? Cutting? Chamfering? Assembly (quality inspection to check shape and dimensional tolerances)? Welding tank reinforced electrostatic leak test? Water release pressure test and leak test? 1.1 Tank body material: A3 carbon plate, 6mm thick chamfer welding manufacturing.

1.2 Inner diameter size: L700mm*W4000mm*H1950mm

1.3 Outer diameter size: L910mm*W4210mm*H1965mm

1.4 Groove edge reinforcement: 5mm plate bending Reinforced into a U-shaped groove.

1.5 Tank body reinforcement: 5mm plate is bent into U-shaped groove for reinforcement. 1.6 Insulation: The insulation cotton is 50K rock wool

Tank piping

2.1 Ф3/4” PVC/PP combined water inlet pipe (with PVC double-free ball valve) can control water inlet and To supply water, the water pipe extends into the tank to a depth of 2/3, and the outlet is opened at a slope to ensure uniform water quality, and a flow meter is installed to control and monitor water consumption and overflow drainage.

2.2? Ф 3. /4" PVC/SUS304 pipe combined air inlet pipe (with PVC double-free ball valve) can control the gas flow

The air inlet pipe leads to the center of the bottom of the tank to evenly distribute the air flow to both sides, and the air outlet hole is Ф1.5/ There are two rows of Ф2mm downward (the size of the holes depends on the liquid composition, concentration and crystal size). The two rows of holes are each at an angle of 45° to the vertical line of the center of the tube. The left and right holes are arranged in a staggered manner. The distance between each row of holes is 50mm, allowing for even risk. Create bubbles and stir the liquid thoroughly to promote the stirring function. A siphon hole is drilled obliquely on the upper end of the air pumping pipe to prevent the tank liquid from sucking back and causing cross-contamination of the tank liquid.

2.3 Drain pipe: Ф1.25”/Ф1.5” SUS304 drain pipe (with SUS304 ball valve) drains below the bottom of the tank, making it easy to drain and clean the tank body. There is a first-level filtering device in front of the drain port to prevent debris from being discharged into the pipeline system and causing system blockage.

Trough manufacturing process

1. Drawing review, plate cutting (blanking), chamfering, assembly (quality inspection and verification of shape and size tolerances), welding tank repair Strong insulation and reinforcement? Water release, pressure test and leak test?

Chemical polishing tank

Trough structure

1.1 Tank material: Japan Nippon Steel SS316L stainless steel Plate, 4mm thick, chamfered and welded.

1.2 Inner diameter size: L700mm*W4000mm*H1950mm

1.3 Outer diameter size: L910mm*W4210mm*H1965mm

1.4 Groove edge reinforcement: 4mm plate bending U-shaped groove reinforcement

1.5 Tank body reinforcement: 4mm plate is bent into U-shaped groove for reinforcement. 1.6 Insulation: The insulation cotton is 50K rock wool

Piping in the tank:

2.1 Ф3/4” PVC/PP combined water inlet pipe (with PVC double-free ball valve) to control the water inlet The water pipe extends into the tank to a depth of 2/3, and the outlet is opened at a slope to ensure the uniformity of water quality, and a flow meter is installed to control and monitor water consumption and overflow drainage.

2.2 Ф1” The PVC/SS316L pipe combination air inlet pipe (with PVC double-free ball valve) can control the gas flow. The air inlet pipe leads to the center of the bottom of the tank to evenly distribute the air flow to both sides. The air outlet holes are Ф1.5/Ф2mm in two rows downward (the size of the hole depends on the liquid composition) , concentration and crystal size), the two rows of holes are each at an angle of 45° to the vertical line in the center of the tube, and the left and right holes are staggered. The distance between each row of holes is 50mm, which can bubble out evenly and fully stir the liquid to promote stirring. Function. A siphon hole is drilled obliquely on the upper end of the air pumping pipe to prevent the tank liquid from sucking back and causing cross-contamination of the tank liquid.

2.3 Drainage pipe: no design trough manufacturing process:

1. Drawing review? Cutting (cutting)? Chamfering? Assembly (quality inspection and proofreading of shape and position) Dimensional tolerance) Welding? Tank reinforcement? Insulation and reinforcement? Water release, pressure test and leak test oxidation tank

Tank structure

1.1 Tank material: Taiwan Xide PP plate, 12mm , 15mmamp; 20mm thick, manufactured by chamfer welding.

1.2 Inner diameter size: L1500mm*W4000mm*H1950mm

1.3 Outer diameter size: L1710mm*W4210mm*H1965mm

1.4 Groove edge reinforcement: PP20mm

1.5 Tank body reinforcement: SS41*80*40*4 flat tubes are used on the outside and 4mm PP plates of the same color are covered and welded. The piping in the tank 2.1 Ф1” PVC water inlet pipe (with PVC double-free ball valve) can control the water inlet and supply water volume.

2.2 Ф1” air inlet pipe (with PVC double-free ball valve) can control the gas flow. The air pipe in the tank adopts Japanese nano air pipe (or uses high-speed nozzle instead of air stirring pipe), which produces very uniform bubbles, effectively improving the quality and film formation rate of the oxide film. A siphon hole is drilled obliquely into the upper part of the air inlet pipe to prevent the tank liquid from being sucked back into the air pump pipe, causing cross contamination of the tank liquid.

2.3 Filter tube: The filter inlet hole is designed at one end of the tank bottom and a first-level filter screen is added. The impurities are filtered through the 5-10u" cotton core of the filter and then spit out from both sides of the other end of the oxidation tank. This cycle is repeated to achieve Full filtration effect. The upper part of the filter tube is equipped with a siphon hole to prevent the tank liquid from sucking back.

2.4 Ice water circulation pipe: One end of the ice water circulation pipe is sucked into the circulation pump through the first-level filter hole and undergoes freezing replacement. , the fresh sulfuric acid liquid is evenly distributed through the PVC pipe drilling (or using a high-speed nozzle) and spits upward at the bottom of the workpiece. There are siphon holes on the upper part of the circulating pipe to prevent the tank liquid from being sucked back.

2.5 Drainage pipe: Ф1.5” PVC drainage pipe (with PVC double-free ball valve) is discharged from the bottom of the tank, which is easy to drain and clean the tank body. There is a first-level filtering device (can be used with the drain outlet) in front of the liquid outlet to prevent debris from being discharged into the pipeline system and causing system blockage.

Tank manufacturing process

1. Drawing review? Cutting? Chamfering? Assembly (quality inspection to check shape and dimensional tolerances) Welding? Tank body reinforcement? Electrostatic test Leakage? Release water for pressure test and leak test? Cathode and anode cathode devices

1.1 The cathode conductive plate can be an immersed titanium-clad copper flat (or Yuan rod) or a red copper flat for continuous connection. The connection point with the rectifier is segmented to ensure even distribution of current and reduce the difference in voltage drop. 1.2 The immersed cathode can be made of carbon plate, lead plate or 6061 aluminum plate according to the actual production conditions of the customer. The surface of the cathode is covered with a filter bag to filter impurities and hydrogen bubbles. 1.3 Between the oxidation tank and the rectifier, our company uses 99.9 (T2 series) red copper flats. The joints

are welded after the screws are locked to ensure conductive stability. The upper part of the copper flats is also equipped with Protective cover. Anode device

The 2.1 copper V-seat is cast from aluminum bronze, and the angle is processed by precision running-in to ensure that the contact area and strength requirements are met, and it can withstand high impact and friction.

The 2.2 copper V-seat adopts open cooling:

l? First, it achieves the cooling effect.

l? The second is to clean the V-seat contact surface to avoid the generation of copper chlorine.

l? Third, a layer of conductive water film is formed between the swing triangle head and the V seat to ensure full contact and ensure the stability of current transmission. Sealing tank

1.1 Tank body material: Taigang SUS304 stainless steel plate, 3mm thick chamfer

1.2 Inner diameter size: L90mm*W4000mm*H1950mm

1.3 Outside Diameter size: L1110mm*W4210mm*H1965mm

1.4 Groove edge reinforcement: 3mm plate is bent into U-shaped groove for reinforcement.

1.5 Tank body reinforcement: 3mm plate is bent into U-shaped groove for reinforcement. 1.6 Insulation: The insulation wool is 50K rock wool. Tank piping

2.1? Ф 3/4” PVC/PP combined water inlet pipe (with PVC double-free ball valve) can control the water inlet and supply water volume.

2.2? Ф 1” PVC/SUS304 pipe combined air inlet pipe (with PVC double-free ball valve) can control the gas flow. The air inlet pipe leads to the center of the bottom of the tank to evenly distribute the air flow to both sides, and the air outlet hole Ф2mm downwards There are two rows (the size of the holes depends on the liquid composition, concentration and crystal size). The two rows of holes are each at an angle of 45° to the vertical line of the center of the tube. The left and right holes are arranged in a staggered manner. The distance between the holes in each row is 50mm, allowing bubbles to emerge evenly and Stir the liquid thoroughly to promote the mixing function. A siphon hole is drilled at the upper end of the air pipe to prevent the tank liquid from being sucked back and causing cross-contamination of the tank liquid.

2.3? Filter tube: A filter is designed at the bottom of the tank. Add a first-level filter to the entrance hole, filter the impurities through the 5-10u" cotton core of the filter, and then spit them out from both sides of the other end of the sealing groove. Repeat this cycle to achieve full filtration effect. The upper part of the filter tube entering the tank is equipped with a siphon hole to prevent the tank liquid from being sucked back.

2.4? Drain pipe: Ф 1.5” SUS304 drain pipe (attached with SUS304 ball valve) is discharged from the bottom of the tank, making it easy to drain and clean the tank body. There is a first-level filtering device in front of the drain port (can be connected with the drain The outlet is only used) to prevent debris from being discharged into the pipeline system and causing system blockage.

2.5? Spray cleaning function: A PP spray cleaning pipe is installed above the tank, and the spray cleaning pipe is equipped with mist. After the workpiece is lifted, the following effects can be achieved by atomizing spray cleaning: 2.5.1 The temperature of the sealing tank evaporates quickly, and the spray water can be used to replenish it in time by lifting the workpiece. 2.5.2 It can be removed by spray cleaning. Sealing dust on the surface of the workpiece ensures surface cleanliness.

2.5.3 Rapid cooling of the workpiece has a better sealing effect.

1. Review. Picture? Cutting (cutting)? Chamfering? Assembly (quality inspection to check shape and dimensional tolerances) Welding? Tank body reinforcement? Insulation and reinforcement? Water release, pressure test and leak test function description:

1. Use online drying, no need to hang it, which reduces the intensity of manual operation and avoids the hidden danger of being damaged by hanging. In addition, all materials are discharged from dry hangers, and there is no dripping phenomenon. The operation site is hygienic and clean.

2. The drying furnace door is controlled by PLC and automatically opens and closes to coordinate the entry and exit of workpieces. The hot air adopts circulating convection type, which greatly saves operating space and heat energy.

3. The hot air inlet and outlet are equipped with adjustable backflow plates to facilitate adjustment of direction and ensure uniform temperature in all corners of the furnace.

Ensure the quality of workpieces in this process

4. There is a drainage device under the furnace body to prevent water accumulation in the furnace from affecting the drying effect and ineffective energy loss.

Frame structure and rails

1. Main. Rack structure type:

Horizontal floor-mounted rack structure. The racks are all made of standard carbon steel square tubes. There are reinforced connections in both vertical and horizontal directions, forming a set of stable mechanism modules. The bottom of the frame is equipped with leveling screws and is supported by force. The required load-bearing force on the ground is 1-1.5TON/M2 (when working)

2. Main frame functions and features:

2.1 The entire frame is located horizontally. After the tank is statically pressed, it forms a stable base on which the crane and swing mechanism

run smoothly.

2.2 All solder joints of the frame and rails are welded by electric welding, which is beautiful and durable.

2.3 The rails are laid with anti-slip SUS304 sand-faced steel plates, which on the one hand strengthens the rigidity of the rails and on the other hand

In terms of ensuring friction and positioning braking force when the crane is driven, the 2.4 frame can be designed into an elevated structure according to the height of the owner's workshop, and the bottom can be used to place materials, and the entire set of equipment

It is magnificent after being formed.

The entire 2.5 rack is modular and the structure can be disassembled and can be moved after disassembly.

3. Pedestrian operation walkway

3.1 On the side of the main frame (operation surface), a pedestrian operation walkway is designed, and the operation walkways are all made of carbon steel

Flat channels Welded together to form one piece with the main frame.

The upper surface is laid with a high-strength fiberglass grating for operators to move safely and quickly on it to facilitate manual operation of the crane, observation of the working conditions of each tank, and opening and closing of the water/air inlet valves of each working slot. At the same time, it can be easily transported and added to the potion. 3.2 An emergency stop pull rope switch system is installed at a convenient location on the pedestrian operation walkway to prevent the device from being operated under abnormal conditions and avoid safety accidents. 3.3 The height and width of the pedestrian walkway can be adjusted and designed accordingly in conjunction with the main frame according to on-site operation needs

to conform to human operating habits.

Crane crane assembly

1. Model:

Gantry crane structure

2. Function:

In order to transport (up and down/front and back) and the objects to be processed on them to the appropriate workstation, the timer can be stopped when lifting to facilitate dripping. Several groups of cranes distribute tasks reasonably without affecting each other's operation.

3. Structure and power 3.1 The main body is all made of A3 bending. The front and rear are rectangular frames, and the upper and lower frames are "n" shaped. They are fixed on the front and rear rectangular frames through screws, and perform front and rear/up and down movements together. . The surface of the frame is electrostatically sprayed with baked acid-resistant paint. 3.2 The front and rear transmission motor reducers are installed in the middle of the transmission box. They are connected through couplings and supported by bearing seats to transmit torque to the driving wheels on both sides to ensure the synchronization of the running wheels on both sides. The main drive is covered with acid-resistant PU rubber rollers. The friction is smooth and noise-free when the crane is running, and it does not slide when it is stopped and positioned, making it smooth and smooth. Both sides of the rail are designed with left and right side wheels to prevent the crane from running sideways and the swing bar not falling in place. The left and right speed can reach 1500px/sec. 3.3 The upper/lower transmission motor reducer is installed on the side of the vertical arm. Through the belt-type reel, the upper/lower workpiece is lifted and lowered. The belt is a high-strength acid-resistant belt imported from the United States. It has no noise during operation and will not stretch. The belt The transition wheel is cleverly designed into a waist drum shape, which is concentrated in force and difficult to slide axially. The upper and lower support rollers are made of Swiss UPE material, which is highly wear-resistant, and the upper/lower transmission units are hidden in a nearly closed transmission box. The up/down speed can reach 500px/sec 3.4 Water basin device (this is an optional item)

The water basin moves through a motor reducer drive shaft equipped with a PE gear, which drives the corresponding rack of the water basin. Perform opening and closing actions. The purpose is to reduce the cross-contamination of the tank liquid, reduce the dripping residence time of the crane in each tank, shorten the crane action time, and increase production capacity.

l? Effectively improves the phenomenon of secondary pollution and poor conductivity caused by liquid medicine dripping onto the surface of FLYBAR.

l? Concentrate and classify the dripping liquid for discharge, which effectively improves the working environment on site.

4. Crane safety protection 4.1 Up/down, left/right timeout protection and display can prevent the motor from overloading and burning down. 4.2 Up/down, left/right overload protection and display can prevent the motor from being overloaded and burned out. 4.3 Up/down, left/right limited time protection and display can prevent the motor from being overloaded and burned out. 4.4 Up/down, left/right action locking protection can prevent the motor from being overloaded and burned out. 4.5 Up/down positioning failure, limit switch action protection can prevent the motor from being overloaded and burned out. 4.6 When the front/rear crane collides, the crane limit protection switch is activated to prevent the motor from overloading and burning down. 4.7 The safety guardrail switch operates to prevent the safety of personnel and equipment.

4.8 has an emergency pause function, which can be temporarily stopped and restarted to continue running.

4.9 The overhead crane/upper belt is equipped with a reversal control switch to prevent the upper and lower belts from being reversed and causing damage to objects or the overhead crane mechanism.

4.10 The lower part of the crane is equipped with a wave anti-overlapping photoelectric SENSOR. Its purpose is to prevent the wave from being placed in an uncertain position, causing the wave to overlap and break the wave, resulting in damage to the wave and the workpiece.

4.11 The water basin opening and closing positioning is time-limited, protected and displayed to prevent the motor from being overloaded and burned out.

4.12 If the water basin opening and closing positioning fails, the limit switch action protection can prevent the motor from overloading and burning down.

5. Comes with its own operating platform (this line has 3 intermediate stations, no need for this structure) 5.1 After the workpiece is oxidized, the thickness of the oxide film can be conveniently measured on the platform without removing the hanger.

5.2 After convenient dyeing, the operator can compare and measure the color difference on the platform, add and troubleshoot problems in a timely manner

5.3 Convenient maintenance and inspection of front and rear/up and down transmission groups.

6. Position reading and positioning system 6.1 The upper and lower parts of the crane are controlled by frequency converters according to segmented speeds, and the upper and lower parts are equipped with fast, medium and slow speeds

Spend. There are four speeds for front/rear: fast, medium, slow and rapid. The crane operation is controlled in a stable and smooth state to ensure working speed and positioning accuracy. 6.2 The BCD code is used to read the position before and after the crane. If the reading is misaligned, the crane will automatically correct and retrieve the target address. 6.3 Faults such as crane overload, upper/lower misalignment, slot error, off-position element, etc. will be displayed and recorded with digital codes.

6.4 The entire crane control system has a power-off memory function.

7. The crane can be operated in three operating modes: manual, manual and automatic.

8. The manufacturing process of the crane: Bending parts? Drilling? Welding? Trial assembly? Painting? Drawing review? Body assembly? Transmission machine parts blanking? Processing (turning, milling, cutting) Mechanism assembly? Electronic control wiring crane molding

Wavebar and hanger

1. The swing bar adopts T2 red copper flat 12*60 (80) as the conductive main rod, and the two ends are locked and run-in copper triangular heads. The upper part of the copper flat is reinforced with a stainless steel square pass to ensure that the straightness of the swing bar is not deformed.

2. Hanging fixtures: Customers can customize matching hanging fixtures according to the needs of their own products.

Peripheral equipment

1. Oxidation filter

Sealing filter

According to the nature and usage temperature of each tank potion, and Circulating working flow to select the corresponding circulating pump.

The purpose of the circulating filtration system is to continuously filter the liquid to remove undesirable particulate impurities in the liquid, make the coating fine and reduce roughness or defects, and to forcefully stir the liquid to make the liquid The temperature and concentration of each ingredient are maintained consistent. To increase plating efficiency and quality uniformity.

2. The outlet and inlet of the circulating filtration pump are equipped with optional valves, which can be easily configured, inspected and replaced

The cotton core and flow adjustment function.

3. The oxidation tank is equipped with a PP filter and circulation pump; the sealing tank is equipped with a stainless steel filter. The dyeing tank is equipped with a PP filter.

4. The inlet of the circulating filtration pump is equipped with a self-made primary filter to prevent the inhalation of debris from clogging the pump, causing pump blockage, or causing damage to the pump impeller.

5.? The filter is equipped with a vent hole and a valve to increase the filtration effect.

6.? The filter is equipped with a medicine cup and valve, which can easily add medicine and start pouring medicine for normal operation.

7.? The circulating pumps and filters selected by our company are all branded by Taiwan's Guobao (or Sanchuan Hong). This brand has reliable quality and timely after-sales service. The water washing tank is equipped with an air pump to enhance the cleaning effect. The hot water washing tank is equipped with an air pump to ensure even temperature mixing throughout the tank. The medicine tank and oxidation tank are equipped with air pumps to remove air bubbles on the workpiece surface and enhance the activity of the medicine.

1. The planning of air agitation is determined based on the area and properties of the tank liquid. The air agitation required per square meter per minute for the oxidation and chemical tank is calculated based on 0.12-0.15M. The air agitation required per square meter per minute for the water washing tank is calculated. Calculated based on 0.1M. The air ducts are proportionally sized from the blower to each work tank.

2. Due to the high heat at the outlet end of the blower, the front end is equipped with inner and outer circulating water buffer pipes. On the one hand, it protects the back-end PVC pipe from being scalded, and on the other hand, it prevents the condition of the bath workpiece from being affected.

3. Blower: TH-80

Power: 10HP

Air volume: 7.2M3/Min

Static pressure: 3000mmAq

p>

1. There are two types of rectifiers available: SCR and Switch (Switch type rectifier is recommended to be installed in an independent constant temperature room).

2. The rectifier operation can be set to rated current or rated voltage operation.

3. Rectifier cooling methods include water cooling, oil cooling, air cooling or air-water cooling.

4. The automatic line rectifier can control the current and voltage through PLC. The rectifier can start to work only after the swing bar is stabilized to prevent damage to the workpiece caused by the impact current; when the swing bar is about to be lifted, the rectifier will automatically power off.

5. The manual line rectifier can optionally come with a timing alarm device.

6. The rectifier can be equipped with an ampere-minute counter according to customer requirements to facilitate the addition of dyeing tanks.

During the anodizing process, part of the electrical energy will be converted into heat energy. As the bath temperature increases, the quality and metal loss of the film are significantly reduced, and the outer layer of the film has a low hardness. Under atmospheric conditions, this film will appear "pulverized". Therefore, it is very important to control the temperature of the oxidation tank. Generally controlled between 18℃-22℃.

Oxidation tank refrigeration types are generally divided into three types

l? First, direct cooling: one oxidation tank corresponds to a freezer, and an acid-alkali resistant pump is used to directly cool the sulfuric acid oxidation solution. It is pumped into the ice water machine, cooled in the acid and alkali resistant SS316L exchanger, and then returned to the oxidation tank. This method cools quickly. One-to-one correspondence, the oxidation tanks will not affect each other's operations.

l? Second, indirect cooling: a set of temperature control tanks are specially designed. This temperature control tank implements heating tubes and cooling, and the temperature can be set as needed. There are 1-2 ice water machines for temperature management. Each group of oxidation tanks corresponds to a plate exchanger. The plate exchanger has an inlet and outlet for ice water and liquid medicine to implement the temperature control of each group of oxidation tanks. This method saves energy. In summer, the ice water machine needs to be turned on at full load. In winter, the ice water machine needs to be turned on at full load. The ice water machine is half turned on.

l? Third, direct mixed flow type: a set of management tanks are specially designed. This management tank can perform functions such as chemical addition, heating and cooling. Each group of oxidation tanks overflows to the corresponding management tank through circulation. When passing through the ice water machine (or heating pipe), the temperature of the management tank is controlled between 18°C ??and 22°C. Advantages of this method: The temperature of several oxidation tanks is guaranteed to be consistent.

Based on the ingredients of the potion, there are two types of heating designs: electric heating and steam heating.

For electric heating tubes, our company adopts brands with reliable quality. The quartz tube is guaranteed for half a year. The stainless steel and TEFLON heating tubes are guaranteed for one year, and are designed to be heated to process temperature within 3 hours.

Steam heating is divided into two types: air intake system and return water system.

lThe temperature control meter is of OMRON brand.

The temperature probe is PT-100, a straight TEFLON temperature sensing rod, with high sensitivity, strong acid and alkali resistance

and long service life.

l Temperature can also be monitored by PLC through the temperature module.

l There are two types of liquid level switches: one is a three-prong inductive type, and the other is a float magnetic liquid level switch (for the

American Madison brand).

Pipeline system

1. All the piping of this equipment have been carefully considered to not only facilitate the user's operation, but also provide simplicity and efficiency in the use and maintenance of pipe fittings. See the piping design drawing for details.

2. The water inlet pipe can be divided into tap water, pure water and other medicine delivery pipes. On the operating side, the drainage pipe is on the other side of the periphery, which is clear at a glance during operation.

3. Drainage pipes should be discharged according to classification to comply with the principles of pollution prevention and resource recycling.

4. All pipe fittings are classified as follows according to their chemical properties and temperature:

4.1 Nanya PVC pipe (10Kg/cm2)

4.2 Nanya PP pipe

4.3 Stainless steel SUS04 and SS316L seamless steel pipe control system

1. The main electric control box is a double-door custom-made form, with dimensions of W600*L1800*H1800mm, material SS41, thickness 2mm, and door panels CNC automatically drilled And strengthen, the surface is baked with computer white paint.

2. The electric control box control includes crane and swing control, and peripheral equipment control. The electric control box is equipped with a cooling fan to exhaust heat in time. There is an automatic switch LED heat light on the top for easy viewing. Check the components in the box. (It is recommended that the electric control box be designed in a constant temperature room)

3. Crane control

3.1 PLC adopts Japanese OMRON (C200H series), which is compact and powerful, with rich instructions and reliable quality . 3.2 The frequency converter is a Japanese Mitsubishi brand. 3.3 The contactor is Shilin or Schneider brand. 3.4 The intermediate and time relays are of OMRON brand. 3.5 The human-machine interface adopts Pro-face brand or equivalent brands.

The 3.6 crane can be operated in three modes: one-time operation, continuous operation and manual operation.

Our company picks up the above brands from first-level agents, with guaranteed quality and high safety.

4. Peripheral equipment control

4.1 Contactor Shilin or Schneider brand. 4.2 The relay is of OMRON brand. 4.3 The switches and indicator lights are from Taiwan Tiande brand.

4.4 Each processing tank, various workpiece status and parameters are clearly displayed on the electrical box panel or the human-machine interface. For example: pump switch, heating and cooling switch, temperature display, etc.

5. Wiring standards

5.1 The electrical box lines equipped by our company are neat, and numbers are written at both ends of each wire. 5.2 Each contact point is firmly fixed and will not loosen. 5.3 The wires are made of national standard cables with sufficient wire diameter. 5.4 Lines and electrical appliances are distributed reasonably and will not interfere with each other. 5.5 After the wiring is completed, check each item one by one without powering on. Only after OK, power on and test.

6. Rectifier control

Rectifier control is divided into power control part and signal control part. The rectifier can be automatically controlled through PLC and DMS.

7. Open program (software) 7.1 The oxidation line crane control programs are all intelligent and fully open programs. After the on-site supervisor inputs the password for process and working time operations, it can be automatically implemented according to production needs and environmental changes. Revise. 7.2 Multiple material numbers can also be mixed for production. There is no need for professional programming engineers to draw ladder diagrams and then enter DM codes, which greatly improves work efficiency.

8.DMS data monitoring system (optional item) 8.1 The computer monitoring system can monitor the working status of the production line crane. The electroplating process parameters can be monitored and modified, including the rectifier current setting record, the working temperature setting record in the tank (setting records are automatically added), and the processing time of each tank can be monitored, and high and low water level abnormality alarms can be monitored.

8.2 The computer collects, displays, records and saves relevant operating process parameters and data, and prints them out in the form of production reports, so that managers can have a good grasp of the production status of the equipment.

8.3 When an equipment failure occurs, the alarm device will sound an alarm and display the corresponding fault code. The operator will promptly troubleshoot the fault according to the code instructions, and the computer will also record the time of occurrence and repair time. And can print or make reports.

8.4 The DMS system sets the permission to enter the operation. The operator can modify the parameters after entering with the password.

8.5 It can be connected to the Internet to remotely monitor all production data, which also facilitates the management of the entire enterprise.

Items not included

1. Distribution of water source for primary measurement (distributed to the machine)

2. Distribution of power supply for primary measurement (distributed to the machine) The main switch in the main electrical box of the station, and the distribution board of the surrounding large electrical appliances)

3. Raw materials and medicines for the trial production of the tank.

4. On-site civil engineering, drainage ditch setting, ground treatment and preparation of transportation channels before installation.

5. Install the water and electricity used during the test run.

6. Equipped with consumables for test run.

7. Wastewater (and pure water) treatment equipment

8. Analytical instruments.

9. Air compressor (boiler) and other equipment.

10. Filter cotton core and other consumables.

11. Matters not mentioned before are necessary for production.

12. Items required by the owner to include: water machine, rectifier, refrigerator, lead plate in the oxidation tank, short-circuited copper bar, exhaust gas treatment device, hangers and equipment foundation construction. /article/canst-8-2389100.html

/product-detail/100174167172.html

Special note: The above parameters and descriptions are for reference only, and the data communicated by both parties shall prevail. .