Nowadays, many citizens' awareness of rights protection is increasing, and there are more and more occasions where contracts can be used. The purpose of signing a contract is to protect the interests of both parties and avoid unnecessary disputes. So how is the general contracting drafted? The following is a sample construction service contract that I have compiled for you. Welcome to share.
Construction service contract 1 Party A:
party B
According to the Contract Law of People's Republic of China (PRC) and relevant national laws and regulations, Party A and Party B voluntarily sign this contract through equal consultation as follows:
First, the service content
Party A employs Party B to carry out sprinkler management on the main road areas of site construction confirmed by both parties, so as to ensure that there is no dust when vehicles pass and the construction roads are clean and tidy.
Two. Specific tasks of Party A's hiring security guards
1, maintain the normal production order of the construction site, water it every day, and ensure the cleanliness of the construction road on site.
2. Respond to emergencies and obey the unified command and dispatch of Party A. ..
3. The total length of roads to be watered is about1000m.
Three. Salary, length of service and place of employing Party B.
1. Ensure that the construction road is free of dust, and the cost of sprinkling water is 300 yuan/day. The above fees do not include water charges, including sprinkler charges, labor costs and electricity charges.
2. The service period is 20xx from April 1 day to May 3 1 day. Party A may terminate the contract in advance according to the actual construction situation, but it shall notify Party B three days in advance and the expenses shall be adjusted accordingly.
3. In case of rain and other special weather conditions, watering can be stopped with the consent of Party A, but the number of days without water supply should be deducted.
3. Service location: Fu You water town construction site.
4. Party B shall be responsible for its own safety. In case of personal injury or death, Party B shall take full responsibility.
Verb (abbreviation of verb) liability for breach of contract
During the contract period, if the construction road is covered with dust due to the passing of vehicles, 600 yuan will be detained for every discovery.
6. This contract is made in triplicate, two for Party A and one for Party B. ..
Party A:
Party B:
Date:
Construction Service Contract 2 Party A: Party B:
According to the relevant laws and regulations of People's Republic of China (PRC), Party A and Party B, based on the principles of honesty, credit, equality and mutual benefit, reached an agreement on the security services provided by Party B to Party A through friendly negotiation, and hereby signed this contract.
Article 1 Security Service Contents
1. Area scope: the area within the wall of Party A's construction site, including three functional areas: construction area, office area and living area.
2. doorman: the doorman at the south gate and the west gate is on duty 24 hours a day. Strictly implement the guard management system. Check and register personnel and vehicles entering and leaving the site, and prohibit idle personnel and vehicles from entering and leaving; It is strictly forbidden for vehicles that have not been washed clean to appear; Building materials and construction machinery and equipment shall not be used without approval.
2. Video monitoring room: video monitoring is manned 24 hours a day;
3. On-site patrol: 24-hour patrol to prevent fire, theft and damage;
4. Maintain public order in the region and intervene and mediate various contradictions and disputes in time.
5. Manage the security personnel according to Party B's management mode.
6. According to the requirements of post responsibilities confirmed by both parties, carry out safety prevention tasks and undertake corresponding safety service responsibilities.
Article 2 Party A's responsibilities
1. Provide necessary working conditions for Party B's security personnel, including duty room, office desks and chairs, and places for organizing training and study.
2. Equipped with security, fire fighting and video monitoring facilities that meet the requirements of relevant codes and standards. Party B shall promptly reply and improve the report on potential safety hazards. Formulate and implement internal safety rules and regulations, and educate employees to cooperate with and support Party B's safety personnel to perform safety duties.
3. Provide on-site accommodation for the security guards on duty, and provide 4 hand-held walkie-talkies and chargers.
4. Pay the security service fee to Party B at the time and manner agreed in the contract.
5. Party A has the right to ask Party B to replace incompetent and unqualified security personnel.
Article 3 Party B's responsibilities
1. Party B * * * appoints _ _ security guards to be responsible for Party A's security work (five security guards are appointed in advance, and two security guards will be appointed after Party A's project is fully started and Party A's written notice is received), among which the person in charge 1 (security guard captain).
2. According to the service content and Party A's requirements, Party B arranges and coordinates the security guards on duty by itself, and submits the list of personnel on duty to Party A's relevant departments for record and reference.
3. The security personnel shall strictly perform the scope of security duties specified in Article 1 of this contract and abide by all legal rules and regulations of Party A..
4. Timely handle and report criminal cases, public security cases and public security disasters and accidents in the area of responsibility to Party A and local public security organs, take effective measures to protect the crime scene, assist public security organs in investigating all kinds of public security criminal cases, and properly handle other emergencies within their responsibilities according to law.
5. Implement safety measures such as fire prevention, theft prevention and damage prevention, report to Party A in time and assist in handling potential safety hazards in the responsible area.
6. The selected security guards must undergo formal safety training and have no criminal record, and provide Party A with a copy of the security guard registration form and ID card.
7. Provide uniforms and basic security equipment for security personnel, be responsible for the salaries and meals of security personnel, and undertake social insurance and accidental injury insurance such as endowment insurance, medical insurance and unemployment insurance for security personnel.
8. Strengthen the on-the-job training, supervision and management of security guards to ensure the quality and efficiency of security services.
Article 4 Security Service Fees and Payment Methods
1. Party A shall pay the service fee to Party B in one lump sum at the rate of RMB per person per month, and the actual payment amount shall be subject to the figures signed and confirmed by Party A and Party B in that month.
2. Party A shall pay the service fee of the current month to Party B by transfer check or cash before 15 of the current month.
Article 5 Term of security service
From the date of 1 on April 20xx to the date of 1 on February 20xx.
Article 6 Contract modification and liability for breach of contract
1. During the validity of the contract, this contract can be modified through negotiation between Party A and Party B. ..
2. If the contract is unilaterally terminated within the validity period of the contract, the security service fee for one month shall be paid to the other party as liquidated damages.
3. If Party A fails to pay the security service fee, it shall pay Party B a late payment fee of three thousandths per day. If Party A fails to pay the security service fee within 30 days, Party B has the right to unilaterally terminate the contract and hold Party A liable for breach of contract.
4. Party A shall send security personnel to work outside the scope of security services agreed in this contract, and Party A shall be responsible for the economic compensation liabilities caused to security personnel and other third parties.
5. According to this contract, if it is confirmed by the public security organ that Party B's security personnel have caused economic losses to Party A due to negligence or intentional behavior in the process of security service, Party B shall bear all the compensation responsibilities.
Article 7 Ways to settle disputes
1. Where Party A investigates the liability for compensation for Party B's dereliction of duty in safety work, it shall bring a lawsuit to the court, and Party B's liability for compensation shall be subject to the effective judgment of the court. However, if the economic loss of Party A is less than 10000 yuan, both parties may determine the liability for compensation through consultation. Party B shall pay the compensation within 30 days after the liability for compensation is determined. Before the liability for compensation is determined, Party A shall not deduct the security service fee without authorization.
2. All legal and economic compensation liabilities incurred by security personnel outside the security responsibility scope and regional scope specified by Party A shall be borne by Party B. ..
3. Other disputes arising from the performance of this contract shall be settled by both parties through consultation; If negotiation fails, they can solve it through judicial channels.
Article 8 Other matters that both parties think need to be agreed.
Matters not covered in this contract shall be settled by both parties through consultation.
Article 9 Supplementary Provisions
This contract is made in duplicate, one for each party, with the same legal effect.
Party A (seal): _ _ _ _ _ Party B (seal): _ _ _ _ _
Project manager (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Construction Service Contract 3 Party A:
Party B:
According to the Contract Law of People's Republic of China (PRC) and relevant regulations, Shanghai xx Development Co., Ltd. (hereinafter referred to as Party A) entrusts the security work within the red line of Party A's xx Plaza construction to Shanghai xx Property Management Co., Ltd. (hereinafter referred to as Party B). In order to clarify the rights and obligations of both parties in the process of work, Party A and Party B sign this agreement through consultation:
Article 1 Service content, service scope and post allocation
1. service content: provide 24-hour security service for Shanghai xx plaza project, including:
(1) Be responsible for the inquiry and registration of outsiders entering and leaving the management area of Party A;
(2) Responsible for maintaining the normal office and construction order within Party A;
(3) Be responsible for preventing the occurrence of criminal and public security cases in the area managed by Party A;
(4) Be responsible for preventing water, electricity, fire and other disasters and destructive accidents within the management area of Party A;
(5) Be responsible for protecting the safety of Party A's assets and employees.
2. Service scope: all jurisdictions within the red line of Shanghai xx Plaza project.
3. Post allocation: the number of security personnel is tentatively set at 12, and there are 4 people on day shift; Two night shift personnel. (See Annex I for details, subject to Party A's written confirmation)
Article 2 security costs
1. During the term of this agreement, Party A shall pay Party B the security fee according to the standard of 12 persons, that is, xxxx yuan per month.
2. The security personnel provided by Party B must meet the requirements of this Agreement and Party A's security management post, and Party B shall guarantee to provide Party A with no less than 65,438+02 security personnel during the agreement period.
3. The expenses include the salary and welfare of security personnel, clothing expenses, training fees, employee insurance fees, transportation and accommodation fees, profits, taxes and other expenses required for Party B to complete the security services agreed in this agreement. Unless otherwise agreed in this agreement, Party A will not pay any other fees.
4. Other expenses: the electricity fee for the booth is xxx yuan/month, and the communication fee is xxx yuan/month, totaling xxx yuan/month.
5. During the execution of this Agreement, Party B shall not ask Party A to increase any fees for any reason; During the execution of this agreement, Party A shall not reduce the amount of fees agreed in this agreement without reason.
Article 3 Method of settlement
1. During the security service contract period, Party A shall pay the security fee, electricity fee and communication fee to Party B at the rate of 10000 yuan/month.
2. After Party B's security personnel work for one month, Party B shall submit a written payment application to Party A before the 5th of next month. After receiving the payment request, Party A shall verify and settle all relevant financial procedures according to the standards agreed in this agreement, and pay Party B according to the settlement amount of Party A before 10 of the current month. If Party B fails to submit relevant materials within the time limit, which leads to Party A's overdue payment, Party B shall bear the responsibility. If Party B's personnel work for less than one month, the expenses shall be calculated according to the actual number of days.
3. Party B shall provide a valid and legal invoice to Party A at the same time of payment, otherwise, Party A has the right to refuse payment.
Article 4 Rights and obligations of both parties
(1) Rights and obligations of Party A:
1. Have the right to supervise, inspect and correct the personnel, equipment and articles used by Party B, and have the right to require Party B to complete the security tasks according to the contents and time of the security work plan determined by both parties.
2. Have the right to supervise and inspect Party B's work quality, put forward opinions and suggestions for improvement of Party B's work quality, and make rectification within a time limit or require Party B to bear liquidated damages according to this agreement and other relevant regulations.
3. Party A has the right to object to the performance of Party B's employees, and Party B must replace the employees that Party A considers unqualified.
4. Party A prohibits Party B from illegally employing employees, otherwise all consequences will be borne by Party B. If Party A suffers losses as a result, Party B must compensate Party A for all its reputation and economic losses.
5. Party A has the right to hold safety meetings regularly or irregularly, and Party B shall entrust qualified personnel to attend.
6. When Party B enters the project site management, Party A shall provide Party B with 1 post, 1 desk, 2 office chairs, 2 walkie-talkies, 1 communication tools (mobile phones), 2 flashlights and 2 batons.
7. All information provided by Party A to Party B (including but not limited to the above information) must be confirmed by Party B, and both parties shall sign a data transfer form. When the contract is terminated, Party B shall return the materials listed in the handover form to Party A. In addition to normal material losses, Party B shall be responsible for compensation for other man-made damages caused by improper use.
(II) Rights and obligations of Party B:
1. The personnel appointed by Party B to serve Party A must be trained and qualified security personnel. Party B shall provide the identity files and training certificates of relevant personnel to Party A for filing.
2. Party B's on-site security personnel must be dressing the, wear badges, keep the site clean and tidy, strictly abide by Party A's rules and regulations, and obey the management of Party A's management personnel.
3. The staff of Party B shall be employed by Party B according to law, and the salary, treatment and insurance of such staff shall be borne and paid by Party B, which has nothing to do with Party A. ..
4. All actions of Party B's staff are regarded as Party B's actions, and the responsibilities shall be borne by Party B, which has nothing to do with Party A. ..
5. Party B must carry out safety training and education for security personnel, establish self-protection awareness and ensure the safety of security work, otherwise all consequences will be borne by Party B. ..
6. Party B shall conduct adequate training and supervision to enable employees to manage safety correctly.
7. Party B's employees are not allowed to swear, drink, gamble, take drugs, fight or behave badly in the management area, and are not allowed to ask for benefits, money or gifts from the construction party and construction personnel. In case of discovery, the authorized person of Party A may order the employee to leave, and Party B shall bear all responsibilities and compensate the losses caused thereby.
8. When Party A's management personnel object to Party B's work, but Party B considers it unreasonable, Party A has the right to lodge a complaint with Party A's management department, but shall not refuse to implement it or have a dispute with Party A's personnel.
9. Without the written consent of Party A, Party B shall not transfer all or any part of this Agreement to other individuals or units, otherwise Party A has the right to terminate this Agreement.
10. In addition to the details of this agreement, if there are any work requirements not listed in detail, Party B must follow the requirements of Party A on the principle of ensuring construction safety under this agreement. Party A shall not be responsible for any work done by Party B without Party A's request.
1 1. Due to the business needs of Party B, Party B must be responsible for strictly keeping the keys handed over to Party B by Party A according to the prescribed procedures, and accept the supervision of Party A at any time.
12. All confidential matters and business secrets about Party A that Party B's personnel have learned in the execution of business shall not be disclosed to anyone, otherwise Party B shall bear relevant responsibilities.
13. During the contract period, if the security guards dispatched by Party B have disputes with any third party or cause casualties to others, Party B shall be responsible for solving them, and the compensation expenses arising therefrom shall be borne by Party B, which has nothing to do with Party A. ..
Article 5 Force Majeure
If the contract cannot be performed due to force majeure, Party A and Party B may terminate the contract, and both parties shall not hold each other accountable for the failure to perform the contract. The party with force majeure shall notify the other party in writing within 10 days from the date of force majeure.
Article 6 Applicable law
This Agreement adopts the existing laws, regulations and relevant provisions of People's Republic of China (PRC).
Article 7 Settlement of disputes
During the validity of this agreement, if there is any dispute or disagreement between the two parties on any matter or event of this agreement, the two parties shall try their best to resolve it through consultation. If no settlement can be reached through negotiation, the relevant matter shall be submitted to Shanghai Arbitration Commission for arbitration in accordance with People's Republic of China (PRC) Arbitration Law.
Article 8 Term of Agreement and Early Termination of Contract
1. The term of this agreement is from xx to xx.
2. During the term of this agreement, Party A may terminate this contract under any of the following circumstances. Where losses are caused to Party A due to Party B, Party B shall be liable for compensation, and Party A does not need to pay remuneration to Party B:
(1) Party B transfers security personnel without authorization;
(2) The security personnel dispatched by Party B leave their posts for more than xx hours without reason;
(3) The security personnel dispatched by Party B cannot complete the affairs agreed in this contract, and the security personnel dispatched by Party B after replacement still cannot complete the affairs agreed in this contract;
(4) Losses are caused to Party A due to the intention or negligence of the security personnel dispatched by Party B;
(5) Party A is dissatisfied with Party B's service level, and Party B refuses to correct it after being told twice by Party A;
(6) Party B engages in illegal and criminal activities.
3. Party A has the right to notify Party B to terminate this contract seven days in advance, and both parties shall settle accounts according to the actual service period provided by Party B and the standards agreed in this contract. In addition, Party A does not need to bear any compensation or liability to Party B. ..
Article 9 Other clauses
1. This agreement is made in quadruplicate, and each party holds two copies.
2. This agreement shall come into effect as of the date of signature and seal by both parties.
3. As an integral part of this agreement, the annex has the same legal effect as this agreement. Modifying the "Job Requirements for Security Personnel" (see Annex II for details) is not enough to invalidate this Agreement. If Party A reasonably requests to add or delete the items of "security personnel's job requirements", the service price of this contract will remain unchanged.
4. If there are any matters not covered in this agreement or amendments, a supplementary agreement shall be signed in written form after negotiation by both parties.
5. After the expiration of this agreement, if both parties intend to renew the service contract, they should submit a letter of intent to the other party one month before the termination date of this contract, otherwise, after the expiration of this contract, both parties have the right to sign another service contract with other companies.
6. See Annex III for the contact list and contact information of both parties.
Party A: Shanghai xx Development Co., Ltd. Party B: Shanghai xx Property Management Co., Ltd.
Legal representative:
(entrusted representative) (entrusted representative)
Account Name: Account Name:
Bank of deposit: Bank of deposit:
Account number: Account number:
Year, month, sun, moon, sun.
Construction Service Contract 4 Party A (Entrusting Party):
Party B (Trustee):
According to the provisions of the Contract Law of People's Republic of China (PRC), Party A and Party B have reached the following agreement on the technical service for the subgrade and pavement construction of Fenxi Mining Bureau's Shuang Liukuang Mining Area to Fengjing Highway through negotiation, which shall be abided by both parties.
I. Scope of service
Party B shall organize technicians to provide technical services (excluding test and site construction) such as construction survey, self-inspection data collation, survey and change data collation within the scope of this project to Party A..
Two. Rights and obligations of Party A
(1) Party A shall provide Party B with all design drawings required for the project and relevant documents issued by the owner and supervision unit.
(2) Party A shall provide Party B with total station, level, tape measure, steel tape measure, flower pole, walkie-talkie, computer, printer, filing cabinet, writing desk, digital camera and other measuring and office equipment and two measuring assistants.
(3) Party A shall be fully responsible for unblocking and handling the relationship with the owner, the supervisor and other higher-level personnel, and bear all expenses for the project completion acceptance (including data acceptance).
(4) Party A shall provide Party B with accommodation and office conditions.
⑤ Party A provides Party B with special vehicles for engineering technology.
⑥ Party A has on-site construction personnel at each working face to accept the technical disclosure from Party B. ..
⑦ During the construction period, Party A has the right to ask Party B to provide personnel to meet the engineering and technical needs.
⑧ If Party B's personnel do not comply with Party A's management system and refuse to listen after repeated persuasion, Party A has the right to ask Party B to replace them.
Pet-name ruby In the process of engineering construction, Party A must carry out the construction according to Party B's technical requirements and relevant national construction technical specifications, otherwise Party B will not be responsible for engineering quality accidents and engineering losses.
Three. Rights and obligations of Party B
① Party B must provide technical services to Party A according to Party A's requirements.
(2) If Party A's requirements do not meet the construction specifications and there are obvious quality risks, Party B has the right to refuse to implement them.
(3) Party B must be equipped with sufficient technical personnel to ensure the project progress and technical quality of Party A. ..
(4) After setting out and leveling, Party B shall submit the information to the site builder in written form, and both parties shall sign for confirmation.
Fourth, the service period.
① The service period shall be subject to the contract period signed by Party A and the construction unit.
(2) The construction period includes the construction retest time (10- 15 days), rainy season, and shutdown caused by the owner and Party A, etc. Does not include the preparation time of completion data.
(3) The preparation time of completion data is one month.
(4) If the project cannot be completed due to the project owner, Party A and the rainy season, Party B will not bear any responsibility.
⑤ If the construction period exceeds the contract period due to the project owner, Party A or the weather, Party A shall pay the salary of Party B's technicians for more than a few days.
Verb (abbreviation for verb) fee and payment method
① The service term of this contract is three months, and the total cost is RMB one hundred and fifty thousand Yuan only (excluding tax).
(2) Party A shall pay 65,438+00% of the total cost after Party B's personnel enter the site, and pay Party B 90% of the monthly proportion of the total cost during the construction period, and all the remaining expenses shall be settled when submitting the project completion data.
Six, other matters not covered, the two sides will negotiate separately.
7. This contract is made in duplicate, and shall come into effect from the date when Party B enters the site to accept the disclosure from the design unit, until the self-inspection data submission fee is settled at the end of the project.
Party A: Party B:
Date: Date:
Address: Address:
Tel: Tel:
;