District property typhoon emergency plan (Selected 5)
In daily learning, work and life, it is inevitable that some events will not occur in their own expectations, in order to control the development of the accident situation, usually need to pre-prepare a complete emergency plan. How to prepare an emergency plan? The following is my carefully organized community property typhoon emergency plan (selected 5), for your reference, I hope to help friends in need.
Cell property typhoon emergency plan 1
A. Purpose:
The establishment of flood prevention, typhoon rescue emergency plan, through the training of the emergency response detachment and hands-on training, to strengthen the management of the service area of the ability to prevent flooding and rescue in the event of a dangerous situation in a more effective and timely exclusion of the damage will be reduced to a minimum, to ensure that the Flood and typhoon prevention and rescue work is foolproof.
Second, responsibilities:
Management Director for flood control, typhoon rescue commander-in-chief;
Management Director for the deputy commander-in-chief, is responsible for the overall work of the equipment group;
Safety host for the deputy commander-in-chief, is responsible for the overall work of the rescue group;
Environment host for the deputy commander-in-chief, is responsible for the overall work of the logistics group;
The environment host for the deputy commander-in-chief, is responsible for the overall work of the logistics group;
The management of the flood control and typhoon prevention and rescue work.
The control center is responsible for accurate communication and coordination of information;
All off-duty staff in the management office are flood and typhoon emergency response team members.
Third, the division of group responsibilities:
3.1 rescue group: by the safety host and not on duty all the safety members of the group
3.1.1 to take all the measures to deal with the danger;
3.1.2 responsible for flood sandbags filling, handling and stacking;
3.1.3 Utilize various ways and means to remove dangerous situations in time.
3.1.4 Division of labor
3.1.4.1 not on duty two center post is responsible for filling sandbags;
3.1.4.2 not on duty two two No. 2, No. 3, No. 4 post is responsible for transporting sandbags;
3.1.4.3 not on duty two No. 6, 8 is responsible for the site of the stacking of sandbags and other measures to rescue;
3.1.4.3 not on duty two No. 6, eight is responsible for stacking sandbags and other measures to rescue;
3.1.4.4 The two No. 6, eight, and other measures to rescue p> 3.1.4.4 safety organizer to lead the rescue team to take all other effective methods to do all kinds of rescue work.
3.2 equipment group: by the management office supervisor and the management office of two technicians
3.2.1 responsible for all kinds of pumps and power supply equipment on;
3.2.2 on the scene of the rescue technical guidance;
3.2.3 on-site equipment for emergency repair.
3.3 Logistics Group: composed of environmental organizers, housekeeping attendants, lifeguards, front desk attendants, cashiers, clubhouse attendants
3.3.1 Guaranteeing the normal supply of various types of relief supplies;
3.3.2 Responsible for on-site rescue of the injured;
3.3.3 Actively assisting the work of other groups;
3.3.4 Personnel division of labor
3.3.4.1 not on duty two five post is responsible for logistical material security;
3.3.4.2 front desk attendant, cashier, club attendant is responsible for the evacuation of the masses and rescue of the injured, the injured transferred to a safe location and timely report to the municipal emergency services center;
3.3.4.3 lifeguards and home helpers are responsible for the rescue of property.
3.4 On-duty personnel
4.1.1 On-duty personnel found dangerous situations should be promptly notified to the center and the shift supervisor on duty;
4.1.2 The center duty officer receives the information to take emergency assembly and other measures to convene the non-duty personnel to promptly discharged the dangerous situation;
4.1.3 The center duty officer should be the first time to notify the manager of the management office and the management office supervisor and the safety organizers;
4.1.4 The center watchman must be on duty to all positions to inform the situation;
4.1.5 on-site positions should be done to maintain order and people and vehicles channeling;
4.1.6 The center watchman should be closely monitor the situation on the scene, and if necessary, to seek other support.
4.1.7 Before the typhoon, the management office positions need to carefully check the position within the scope of the existence of potential safety hazards, and timely elimination of dangerous situations, the situation is serious and timely report to the superiors.
Note: All members must obey orders, follow the command; all members of the rescue process need to pay attention to their own safety.
First, the guiding ideology:
Typhoon, rainstorm work is related to the lives of teachers and students and national property safety is an important work, in order to effectively protect the safety of teachers and students and property safety, to enhance the kindergarten flood control and prevention of typhoon disposal capacity, in line with the principle of "prevention first, safety first," special The development of this plan.
Second, preventive steps:
1, the leading group list and contact phone number
Leader: Director
Members: Logistics Team Leader
Nursing Director
Union Chairman
Kindergarten started the Taiwan flood control plan, the implementation of the 24-hour leadership, duty system. The kindergarten is on a 24-hour duty system.
Third, emergency measures:
1, strengthen the information communication, to do the top of the situation, the bottom of the report.
In the event of a major flood, all the leaders into place, flood control and Taiwan work leading group began to operate; the leaders in charge of the flood control and Taiwan work leading group to report on the flood; the full deployment of anti-Taiwan flood control work.
2, prevention-oriented:
1) clear corridor. Before the typhoon landed, the balcony, corridor debris, flower pots, etc. should be cleaned up to prevent the typhoon landed, was blown down by the wind to hurt people.
2) Close doors and windows. When a typhoon or rainstorm comes, the wind and rainfall are large, so you should close the doors and windows to prevent the wind and rain from damaging the doors, windows, furniture and causing casualties.
3) The janitor of the school's sewers and main catchment wells to carry out a comprehensive dredging.
4) Unclogging of guttering and downpipes on school buildings and houses, and pruning and strengthening of large trees across the school.
5) Do a comprehensive safety check of the lightning protection facilities and outdoor wiring of all school buildings.
6) Do a comprehensive safety check of outdoor antennas, air conditioning outdoor units, and external hangings.
7) Indoor power supply, sockets, doors and windows of all departments to do a comprehensive check.
8) When the circuit and wires are interrupted due to typhoon, the power switch should be turned off in time and emergency lights, torches or candles should be activated for lighting.
Fourth, safeguard measures:
After the plan is activated, the kindergarten to do a good job of early warning and information records. Convene an emergency meeting, in the shortest possible time, by telephone and other forms of kindergarten flood control and Taiwan work deployment, inform the Taiwan flood dynamics, the arrangement of flood control and Taiwan, rescue and relief requirements and tasks.
At any time with the higher departments and units to maintain close contact, strengthen information communication, to do the upper situation, the lower situation reported.
Community Property Typhoon Emergency Plan 3
In order to implement the Civil Aviation Administration of East China "on doing a good job in flood control and typhoon prevention work of the spirit of the notice" and the relevant requirements of the local governments at all levels, combined with the "x Airport Flood Control and Typhoon Emergency Response Plan", the development of this plan, the airport to prevent the frontal attack of the typhoon emergency plan.
This plan is used in conjunction with the "x Airport Flood and Typhoon Emergency Plan".
First, the principle of work
In accordance with the arrival of the typhoon before the "defense" based on the arrival of the typhoon to "avoid" based on the typhoon, the typhoon after the "rescue" principle.
In accordance with the principle of "prevention" before the arrival of the typhoon to "avoid" the main, after the typhoon to "save" the main principle, organized to carry out a good job to prevent the typhoon frontal attack of emergency response.
Second, the organization
x airport to prevent the typhoon frontal attack of the emergency response work in the x airport flood control and typhoon rescue headquarters under the unified leadership.
Third, the duties of each department
When the typhoon received a warning notice of the attack, in the x airport flood and typhoon rescue headquarters under the unified leadership of the departments to act quickly, in accordance with their respective duties, to do a good job of all the "prevention", "Avoid", "save" the preparation and implementation of the work. The duties of each department are as follows:
1. Airport Office: After receiving the warning notice of typhoon attack, inform the company leaders and airport departments in a timely manner. After consulting the company leadership agreed, start the plan, arrange personnel on duty, assume x airport flood and typhoon rescue headquarters office duties.
2. On-site command center: after receiving the warning of typhoon attack and start the plan notice, in a timely manner, in conjunction with the airport construction management office, aircraft security department and security checkpoints, to do a good job of parked planes, apron facilities and equipment of the tie-ups, reinforcement or removal of the work, and timely report on the relevant situation of the x airport flood and typhoon rescue headquarters office.
3. Aviation Management Center: After receiving the warning notice of typhoon attack, do a good job of pre-arrival flights to prepare for the landing and the presence of flights on the transfer of the liaison matters; navigation station site of the wind, drainage and reinforcement, etc.; to do a good job of emergency communication security; in accordance with the requirements of the Bureau of the implementation of the airport air traffic control to prevent the positive impact of the typhoon plan content.
4. Mechanical Security Division: After receiving the warning notice of typhoon attack, in accordance with the requirements of the "Mechanical Security Division of the wind damage prevention emergency plan", tied up parked aircraft, special vehicles should be stored in the warehouse, can not be stored in the warehouse of special vehicles should be far away from tied up aircraft, parked in the leeward side, to set up a good brakes and add the wheelblock. Equipment and facilities on the apron should also take windproof measures to prevent collision cones into storage, traction poles and work ladders should be in storage or tethered to prevent the wind from blowing and damaging other facilities, planning program "Airport Emergency Plan to Prevent Frontal Attacks by Typhoons". Strengthen the staff on duty and keep communications open.
5. Airport Construction Management Office: After receiving the warning notice of typhoon attack, strengthen the protection of the power supply system, make good preparations for power repair, to ensure that the power supply is normal. Equipment and facilities on the apron to take windproof measures. Immediately after the gale, inspect the flight area field paths and lighting facilities to prepare for the opening of the airport.
6. Security checkpoints: After receiving the warning notice of typhoon attack, make good corridor bridge reinforcement tethering to prevent accidents.
7. Cargo Center: After receiving the warning notice of the typhoon attack, the cargo equipment and facilities outside the cargo warehouse to take windproof measures, the cargo equipment and facilities on the apron transferred to the cargo warehouse.
8. Airport Public Security Bureau: After receiving the warning notice of typhoon attack, timely fire vehicles and air defense guards all vehicles into the warehouse or parked in the leeward place, to set up the brakes and add wheel block. All the police are in a state of readiness, ready to wait for x airport flood control and typhoon rescue headquarters to participate in rescue and relief work.
9. Other departments: according to the "x airport flood control and Taiwan rescue emergency plan" of the duty requirements, standby duty, keep communication.
Four, work requirements
1. Responsibility in place, a clear division of labor. The airport departments can be based on the "x airport flood control rescue emergency plan" and "x airport to prevent the front of the typhoon attack emergency plan" to develop departmental implementation rules, clear responsibility and specific person in charge, will be determined by the plan of the various tasks of the typhoon break down and implement to the specific person in charge, the formation of horizontal to the vertical to the end of the work of the network and a flexible and efficient liaison and response mechanism.
2. Well-prepared, strong measures. Each department should organize experienced and competent personnel to respond to emergencies according to the typhoon prevention plan. When a strong typhoon strikes the airport head-on or affects the airport, emergency personnel should be assembled at the specified time to be ready for battle, emergency supplies, equipment, transportation tools, etc. arranged to the front line in order to emergency call. Promptly report to the municipal emergency office, contact the socialized reserves of emergency supplies, equipment and tools, etc., to prepare for emergencies.
3. Strengthen alert, timely disposal. Flood and typhoon rescue headquarters office to arrange personnel to grasp and develop the dynamics of the flood situation, encountered ultra-alert, abnormal or dangerous situation timely report, and seize the organization of evacuation, repair, reinforcement, encountered in emergency situations, in the report of the superiors at the same time, should take the initiative to take emergency measures, seize the favorable opportunity to implement the emergency disposal, eliminate hidden dangers.
4. Emergency duty, smooth communication. After receiving the warning notice of the typhoon attack, the flood control and typhoon rescue headquarters office and departments to implement 24-hour duty system, to keep the information open, the head of each department and the department responsible for the work of typhoon prevention cell phone on day and night, the whole tracking rain, water, wind, disaster and secondary disasters, timely consultation, and according to different situations to start the relevant emergency procedures.
V. Appendix
1. This plan by the airport company is responsible for the interpretation and implementation of the organization. And according to changes in the actual situation and timely revision.
2. This plan is implemented since the date of publication.
Community Property Typhoon Emergency Plan 4
In order to effectively do a good job of our town's typhoon, storm surge rescue work, minimize the damage caused by the disaster, to protect the people's lives and property safety, according to the spirit of the "Emergency Response Law", combined with the actual town, has formulated this plan.
First, the guiding ideology
Based on the city, the district government instructions, combined with the actual town, firmly establish flood control, typhoon prevention, storm surge prevention ideas, in peace and security, typhoons, floods come to the house does not collapse, the traffic is not interrupted, flooding does not become a disaster, to ensure that the people's lives and property safety.
Second, strengthen the leadership, the establishment of typhoon and storm surge prevention work leading group
The establishment of the town mayor as the leader of the leaders in charge of the deputy leader of the flood control, typhoon, storm surge prevention of the leading group of rescue, the establishment of the emergency response team, the captain of the party office set up the Office of the Party Secretary of the Party Committee Office Director; Flood Control, Typhoon Prevention, Storm surge rescue team is responsible for the town's flood control, typhoon, storm surge prevention work arrangements, inspection and supervision and the upper situation, timely communication of the city and district levels of typhoon, storm surge prevention instructions, summary report of the town typhoon, storm surge prevention situation.
Three, the division of responsibility
(a) the management district
1, responsible for: the management district secretary
2, the task
(1) rapid notification of villages, and make a good record of it;
(2) dangerous house households forced to move out;
(3) urge the typhoon period (4) organize village cadres to remove weeds in the channel, quickly drain the water in the field, never allow the ditch depression water storage;
(5) villages to do a good job of moisture preparedness;
(6) animal husbandry villages to do a good job of wind and rain preparedness;
(7) after the wind and rain quickly statistics of disasters and do a good job of relief and appeasement work.
(B) security
1, responsible for:, salt office, fisheries office
2, the task
(1) quickly notify in writing the jurisdiction of the farming caretaker to evacuate;
(2) written notice of sea cucumber farming and other enterprises to stop construction, the evacuation of machinery and personnel;
(3) notification of salt and salt chemical enterprises to do a good job of wind and tide preparation;
(3) notify the salt and salt chemical enterprises,
(3) enterprises within the jurisdiction
1, responsible person:, Economic Development Office
2, task
notify the good precautionary work
(4) construction sites
1, responsible person:
2, task
(1) pay great attention to the Mirror Lake Gardens, secondary school building, kindergarten, community, Market building, poor housing construction site;
(2) written notice, pay attention to electric work, overhead hanging objects and personal safety.
(E) road repair
1, responsible for:
2, the task
(1) repair of serious damage to the road;
(2) rapid repair after the disaster;
(3) along the road billboards, poles, line check.
(F) housing, homes for the elderly
1, responsible for:
2, the task
(1) check the housing, homes for the elderly;
(2) disaster statistics and reporting, to do a good job of communicating with the Flood Control Command.
(VII) township flood control
1, responsible for:
2, the task
(1) drainage dredging;
(2) billboards and other overhead hanging things.
(H) flood control facilities
1, responsible person:
2, tasks
(1) dredging of all drainage trunk canals, lifting gates, digging dams, clearing grass;
(2) inspection of reservoir dams;
(3) reservoirs, trunk canals division of responsibility, the development of a division of responsibility table.
(IX) "three nets"
1, responsible for:, "three nets" Office, Forestry Station
2, the task
Mainly post-disaster recovery.
(J) rescue team
1, responsible person:
2, the task
organization of two rescue teams, divided into a number of groups, each 1 to 2 members of the team, to ensure that the personnel in place.
(XI) information flow
1, Responsible Person:
2, Tasks
(1) Flood Control Command information communication;
(2) disaster statistics;
(3) personnel, vehicle scheduling;
(4) uploading and sending.
(XII) Supervision
Responsibility:, Supervision Office, notify the armed police, police stations, health centers to prepare for disaster prevention and response.
Fourth, comprehensive preparation, the implementation of measures
The village committees, units in my town, according to their actual situation, to arrange for the prevention of typhoons, storm surge prevention work, especially according to the prevention of typhoons, storm surge prevention of hidden priorities, targeted to develop appropriate preventive measures.
(a) do a good job of my town typhoon and storm surge prevention survey mapping work. At present, my town drainage ditches, pipelines and other occupied, covered, filled with more phenomena, some houses are still dangerous, leakage of rain worry, these are typhoon prevention, storm surge prevention work is an important hidden danger, the village committees, units in my town to do a good job of investigating and mapping work, especially the villages should be focused on the investigation of the existence of the problem, immediately reported to the town of typhoon prevention and storm surge leading group.
(b) do a good job of typhoon prevention, storm surge prevention work program and key areas of typhoon prevention, storm surge prevention. Town typhoon, storm surge leading group, based on the city, district typhoon, storm surge prevention work implementation views, combined with the town typhoon, storm surge prevention of the actual town typhoon, storm surge prevention work to develop the town typhoon, storm surge prevention work implementation program and key areas of typhoon, storm surge prevention of the first level of the plan.
(C) to strengthen the duty, duty system. Town typhoon, storm surge duty personnel, from the month of 24-hour day and night duty, timely and proper handling of all kinds of emergencies occur. The establishment of flood control, typhoon, storm surge reporting system, the village committee of the town of typhoon, storm surge prevention timely report to the town; town typhoon, storm surge prevention team to make preparations for rescue and relief work, a dangerous situation immediately mobilized.
(D) make preparations for flood control materials. Purchase shovels, pickaxes, straw bags, wire and sand and stone materials, as flood control, typhoon and storm surge reserves.
Fifth, the work requirements
(a) in peace, enhance the sense of worry. The units can not be taken lightly, we must be determined to do to prevent the problem before it occurs. Seriously study the higher level about the typhoon, storm surge prevention work instructions, improve the typhoon, storm surge prevention of the importance of awareness, to overcome paralysis and luck, firmly establish flood control, typhoon, storm surge prevention awareness, typhoon prevention, storm surge prevention work included in one of the current important work.
(b) Strengthen the leadership, the implementation of typhoon, storm surge prevention responsibility. In accordance with the requirements of the city and district typhoon prevention, storm surge prevention headquarters, the implementation of a responsible system, the implementation of typhoon prevention, storm surge prevention responsibility. Each village committee set up a typhoon prevention, storm surge prevention leading group, the village committee director as the leader, do a good job of mass thinking, materials and other preparations to ensure that the town safely through the typhoon prevention, storm surge prevention. Staff to maintain 24-hour communication, the typhoon is approaching during the duty with staff, vehicles 24 hours on duty, other pending.
Six, accountability
Because of paralysis of thought, poor work, not active as, empty post, absenteeism, drinking, etc. caused by losses or adverse effects, seriously investigate the responsibility of the relevant responsible person.
Community property typhoon contingency plan 5
A general principle:
1, the preparation of the purpose
In order to effectively do a good job in defending against the typhoon of the work, timely disposal of typhoons due to a variety of disasters, to maximize the reduction of my construction site of the loss of all kinds of construction, maintenance of normal construction, to ensure that the project is carried out smoothly.
2, the scope of application
This plan applies to the construction of this section of the scope of typhoon disaster prevention and emergency response.
3, the principle of work
Typhoon disaster according to the construction area to implement local management, the main disposal of the functional departments and construction teams, and the implementation of the functional departments corresponding to the construction team responsibility system. Each functional department actively support and guide, supervise the corresponding construction team's emergency disposal work. The prevention of typhoon disaster should be put in the prominent link, and all the preventive work should be done seriously. Seriously analyze the typhoon may cause gusty winds and rainfall, once the danger occurs, should respond quickly and promptly start this emergency plan, organize personnel and forces to rescue and relief work at full steam.
4, the focus of work
(1) the pit excavation construction site of waterproofing, anti-pit wall collapse and rolling stone, etc.;
(2) construction road landslides, avalanches, and other disasters that may cause accidents prevention;
(3) temporary construction site and construction team stationed at the site of the transfer of personnel and equipment before the disaster comes;
(4) the construction sites
(5) vertical transportation equipment, scaffolding, construction power safety measures;
(6) the construction site and the resident in the period of high winds, heavy rain life security;
(7) typhoon, heavy rain weather forecast, prediction and early warning, in a timely manner, to the construction team, the construction site to release typhoon warning information.
Second, the flood and typhoon disaster leading group:
The project set up a flood and typhoon disaster leading group, the implementation of unified command, sub-departmental corresponds to the specific responsibility of the construction team.
Flood and typhoon disaster leading group
Leading group leader:
Deputy leader:
Members:
Third, the prevention and early warning mechanism:
1, typhoon and other disaster monitoring
By the Ministry of Safety is responsible for the typhoon, torrential rains, storms and mountains. Disaster monitoring and information collection, in advance of the weather conditions, timely summary of the construction site base, traffic roads, a variety of information reported to the leading group.
2, each construction site. Safety inspection
Insist on the safety inspection of the construction site, the implementation of wind and flood control measures as the focus of the inspection work, timely understanding of the relevant information, the possible hazards caused by the basement, the road ahead of time to arrange for personnel to deal with, to avoid accidents caused by the occurrence of disasters.
3, the construction site of the implementation of the responsibility of the early-warning staff
designate the construction site of the part-time safety officer at the same time for the disaster early-warning staff, is mainly responsible for the collection of information on the construction site dynamics, reporting and the leading group of the release of the instructions of the briefing. Assist the construction team leader to do a good job in the implementation of disaster prevention measures and disaster command work.
4, disaster early warning mechanism
safety group to establish the weather conditions, the construction site conditions of the monitoring system, the implementation of information to obtain measures, adhere to the daily inspection system, during the rainfall, encrypted observation inspections, once found signs of danger, the immediate issuance of an alarm, the transfer of personnel and equipment, and reported to the project leading group.
Four, emergency response:
The project department leading group of the overall command, all members of the participation, and coordination of the relevant departments to participate.
The disaster monitoring department analyzes the development trend of the typhoon according to the weather forecast, releases the rainfall and wind forecast, and puts forward the defense goal to report to the leading group in time. According to the report, the leading group to clarify the defense objectives and priorities, issued the order to transfer people, and announced into the emergency flood control and wind prevention period, start the disaster prevention plan, to the disaster area to send people to guide the work, organize and direct the rescue and relief work, and timely report to the relevant departments of the higher levels of the relevant situation, if necessary, reported to the higher level of coordination of the deployment of medical and living materials assistance.
Fifth, rescue and relief:
After the typhoon landed or seriously affected, the leading group of disaster prevention held a timely meeting of rescue and relief, deployment of rescue and relief work. Organize various personnel to the scene of the disaster, guide the rescue and relief, fully committed to the rescue and relief work.
(1) group leader in time to grasp the summary of the disaster, coordination of rescue and relief work, is responsible for the deployment of disaster prevention materials, and with the relevant personnel to do a good job of disaster prevention and evaluation, and do a good job to the construction command and supervision of the Department of the report.
(2) the members of the team in accordance with their respective responsibilities, the organization of post-disaster recovery of materials, equipment and other supplies, priority arrangements for the construction personnel stationed in the supply of living supplies.
(3) the construction team on the damaged construction site, timely development of repair plans, and organize forces to repair as soon as possible.
(4) The leading group contacted the local health department, organizing forces to actively rescue the sick and injured people, while cooperating with government agencies to do a good job of quarantine and epidemic prevention in the disaster area, to prevent the epidemic.
(5) the construction team to organize forces to repair the damaged roads and communications and other facilities to do a good job after the disaster production self-help work.
(6) logistics personnel to do a good job in the management of materials issued to ensure that the supply of necessities of life.
(7) Contact the insurance department to do a good job of claims.
(8) After the typhoon, each construction team and department should report the disaster damage to the leading group in time. After the disaster, the leading group should summarize the lessons learned from the flood, disaster, and disaster resistance, and submit a written report to the project command and supervision department.
(9) When the typhoon and the occurrence of disasters are effectively controlled, the leading group can be based on the information summarized, announced the end of the emergency.
Six, emergency security:
1, rescue team security
I project within the scope of all construction personnel have the obligation to participate in the typhoon and disaster prevention. Each construction team to lead and safety officer as the backbone, disaster should be organized when all personnel to participate in disaster relief work.
2, material security
Materials and logistics departments should reserve the necessary anti-Taiwan rescue materials for emergency use in case of major disasters.
3, financial security
The office to do a good job in the implementation of rescue and relief funds, when the disaster occurs, according to the instructions of the leadership team, the distribution of funds and distribution work.
4, communication and information security
Communication links to cell phones and handheld radios, public telephone network failure, timely start the application system of disaster prevention radios, the use of fixed-channel contact after the notification, to ensure that the information channel is unimpeded.
5, health care security
The leading group contacted the local health department is responsible for the affected area of the health epidemic prevention and medical care, prevention of disease epidemics, immunization and disinfection of public **** place.
6. Evaluation of typhoon prevention and relief work
After each typhoon, the leading group should summarize, analyze, and evaluate qualitatively and quantitatively all aspects and links of typhoon prevention and relief work. Summarize the experience, identify problems, and further improve the work of typhoon prevention and response.
This plan by the project department "flood and typhoon disaster leading group" is responsible for interpretation.
This plan will be implemented from now on.
;