Baoding New Crown Pneumonia Square Cabin Hospital is located in the city south of Fuxing West Road and west of the West Second Ring Road.
The hospital has a construction area of about 22,000 square meters, the construction of 2,000 beds, bed units to implement the management of the Internet of Things, each nursing unit has an independent resuscitation room, resuscitation equipment, medical and nursing intercom monitoring system. In addition, it also realizes wireless network coverage, and has built medical informatization system, video monitoring hall, consultation hall and remote consultation system. At present, the medical equipment is being transported to the site, so that it can be activated at any time in case of emergency, and can meet the isolation observation and treatment of mild and asymptomatic infected people.
At the same time, Baoding City, in accordance with the principle of building a new batch, remodeling a batch, requisitioning a batch, to speed up the construction of isolation sites to ensure that when an epidemic occurs, can quickly form the receiving capacity. In accordance with the requirements, the city will be in the original 24,223 isolation room stock, based on the new construction, reconstruction of a number of centralized isolation room, which in the main urban areas, Baobei, Baonan and the western mountainous areas of the construction of the capacity of 1,000 more than nine large health post, and will be completed before April 15, put into use more than 50%, before April 30 to complete the construction of all the large health post, the rest of the isolation places will also be successively The rest of the isolation places will be built and put into use one after another. By then, the city's isolation place capacity will reach 40723.