Special equipment safety management system and emergency plans are the same?

Safety management system and emergency plans are not the same,

Special equipment safety management system

In order to ensure that the use of this unit of boilers, pressure vessels, pressure piping, elevators, lifting machinery, large amusement rides, passenger ropeways and other special equipment, safe, normal and effective use, the development of safety management regulations, which are as follows:

(a) special equipment Acquisition, installation. All special equipment should be used by the department to put forward the purchase plan, the XX department audit and reported to the leadership of the unit approved by the XX department is responsible for the purchase of holding the corresponding national manufacturing license of the production unit manufactured in accordance with the safety specifications of the special equipment.

Special equipment before the installation, the use of the department to determine the first unit with the appropriate national installation permit is responsible for the installation work, before the start of work should be in accordance with the provisions of the special equipment safety supervision department for the start of work to inform the formalities. Any department shall not install unauthorized special equipment.

After the completion of the installation, the unit (or should be urged to install units) should be declared to the relevant special equipment inspection and testing organizations acceptance test.

(ii) the registration of all types of special equipment. Special equipment before being put into use or put into use within 30 days after the unit XX department XX comrades responsible for the city, district quality and technical supervision departments for registration. Registration marks and inspection marks should be placed or attached to the special equipment in a prominent position.

(c) managers should be clear about the installation location of all equipment, use, operators, managers and safety conditions, and is responsible for the development of relevant equipment management system and safety and technical operating procedures.

(d) the management of special equipment file information.

Special equipment safety and technical file management, is for the safe operation of special equipment to provide technical support for the only traceable technical documents. The relevant responsibilities should be given great importance and proper storage. When the need to access the special equipment technical file information, file management responsibility should be strictly according to the rules, to fulfill the call borrowing procedures and approval by the relevant leaders, before the information can be handed over to the borrower.

Special equipment technical files should include the following: special equipment design documents, manufacturing units, product quality certification, use and maintenance manuals and other documents, as well as the installation of technical documents and information, etc.; special equipment operation and management documents, including: special equipment, periodic inspection and periodic self-check records; special equipment, daily use of the condition of the record (operating records); special equipment and its safety accessories, safety protection devices, measuring devices. Safety accessories, safety protection devices, measurement and control devices and related ancillary instrumentation of the daily maintenance records; special equipment operation failure and accident records.

The contents of the Emergency Response Plan are as follows:

Table of Contents

1. Purpose of Preparation ............................................

2. Hazard analysis ..........................................

2.1 Characteristics of special equipment ............................

2.2 Danger sources and hazards ....................................

3.Emergency organizational structure and responsibilities ................................

3.1Establishment of safety production team ................................

3.2 Main responsibilities of the leading group ..............................

4.Prevention and Early Warning ..........................................

5.Emergency Response ............................................

5.1 Accident alarm .......................................

5.2 Handling measures .......................................

6.Training and Drill ..........................................

7. Revision of the plan ............................................