Scaffolding Contract

Scaffolding refers to all kinds of supports erected at construction sites for workers to operate and solve vertical and horizontal transportation. The following is a sample scaffolding contract I brought for you , welcome to read.

Contractor: (referred to as Party A)

Contractor: (referred to as Party B)

In order to make the construction of this project smoothly, to ensure the quality of the project, safety, schedule, and improve the enterprise, the economic interests of the workers. According to the provisions of the relevant laws and regulations, in accordance with the principle of equality, mutual benefit, voluntary, combined with the actual situation of the project, the two sides through friendly consultation, Party A to the project scaffolding sub-projects in the form of packet cleanup contracted to Party B. In order to clarify the responsibilities and obligations of Party A and Party B, the following agreement is concluded:

Article 1 Project name and location: <

1, project name: XX project

2, project location: XX

Article 2 project content and scope:

1, XX scaffolding sub-construction.

2, work content: according to the structure of the project to prepare the erection and dismantling of the program, drawing the construction of flat elevation drawings, classification statements, material plans, housing around the enclosure (mixer, entrances and exits, protection shed), ascending staircase (ramps), pit safety enclosure; the main body of the external scaffolding, holes, the top of the temporary housing erection, staircases, protective sheds, the erection and dismantling of the edge of the guards, isolation netting, pulling and dismantling; scaffolding pieces, safety netting, and the construction of the scaffolding. Enclosure hanging, turning, dismantling, connectors pre-buried; fasteners on the oil; drop hand clear work, on-site transportation. This type of material into the site with the new steel pipe need to send two people to cooperate with the unloading truck, the old steel pipe unloading their own; stacking connectors and in the process of temporary removal of the external wall decoration, temporary fixing; pull the connectors pre-buried, make safe, welding and cutting; after the removal of all the materials of this project clean up and centralized, according to the A party designated location of the stacking neatly. Unloading fasteners, safety nets stacked into the warehouse, the site of the provisional shed, house demolition and other work. Including reinforcing steel, carpentry, tool room and other operations shed, not including the material hoist, but including the channel mouth, channel board paving, not including the new steel pipe painting, and in this work there is no point of labor.

Article 3 Form of Contract: Package of clean labor.

Article IV Contracting Costs and Settlement Standards

1. Calculated according to the actual erection of the building area, each square meter by yuan comprehensive calculation, (if you need to build full scaffolding, should be erected by the erection of the class, and the cost of its cost is not higher than the market price) This price has been included in the following:

(1) Wages and bonuses.

(2) wages and bonuses.

(2) Allowances. And evening meal. Health care and other subsidies

(3) labor insurance benefits, labor insurance supplies, summer drinks, anti-freezing heating.

(4) Non-production labor: including social obligation labor, labor and travel expenses for meeting, study, training, visiting relatives

etc., stoppage of work due to the influence of climate, special stoppage and standby work expenses, etc.

(5) Recruitment, entry and exit of operation team members, transfer between sites and other costs.

(6) Horizontal on-site transportation of components, loading and unloading of materials within the scope of the work.

2, Party B undertakes to scaffolding project quality and safety period deposit of three thousand dollars (submitted before the entry into force of this contract). The deposit is returned after the end of the main body, without interest.

3, Party B does not advance the cost of living after entering the field, Party A according to the amount of work completed each month, and should be recognized by the quality, safety, construction management aspects of the project management, the cost of living, monthly per person per month yuan attendance rate of not less than 25 days, but the issuance of the cost of living of the personnel must be by the safety officer, for the three levels of education and hold the Ministry of the project system of valid badges of the workers, or else, will not be issued. Payment to 60% of the total price is made after the main body is topped out. When the quality of the project department is reached, after the scaffolding is removed, the full amount of the project will be settled and paid within 45 days. Insufficient part of the advance from Party B, such as not timely sent to each employee or card workers wages lead to the relevant departments to sue the company's interests and reputation, each time a fine of yuan.

4, such as non-normal reasons, Party B withdrew from the construction, Party A and Party B's settlement of the actual completion of 50% of the amount of work counted. Depending on the actual cause of the deposit to determine whether to return or confiscate.

5, Party B in the site required helmets, overalls, raincoats, safety belts, etc., unified to Party A, must be fully equipped, the cost of Party B's own responsibility.

6, in the event of a major inspection of the higher authorities, the scope of this type of work should be dealt with urgently by the team is responsible for, and the scope of responsibility of the brother team is not very clear by the Ministry of the project to decide who to clean up.

Article V schedule standards

Party B must organize sufficient construction technical force, in strict accordance with Party A's overall sub-division of the schedule ahead of time or in a timely manner to complete, closely cooperate with the relationship between the types of work, if the Party B delayed the schedule for any reason, or work stoppage for no apparent reason, resulting in the impact of the schedule and the schedule borne by the Party B, Party B fined $ 200, the fine in the security deposit. Yuan / day, the fine is deducted in the deposit, if the deposit is not enough to deduct in the month's wages.

Article VI quality standards

1, scaffolding and protection of scaffolding works must be set up in accordance with the current "safety technical specification for construction fasteners or steel pipe scaffolding". Construction quality must reach the current "building construction safety inspection standards" and the city safety supervision station standardized acceptance of good standards. Building does not meet the requirements must be reworked and rebuilt, resulting in costs borne by the party B.

If the project safety, civilized construction, quality and other reasons affecting the selection of provincial standardization

Party B contracted by the entire 10% of the total price of the penalty, the quality of site construction, safety, civilized construction, environmental protection, according to the Ministry of the project security management clauses and systems for rewards and penalties.

Article VII A, Party B responsibility

(a) Party A's responsibility

1, the full implementation of the contract, to ensure that Party B normal construction.

2, according to the construction program to implement measures to take safety construction, to ensure the safety of Party B's laborers and 10 people live in the dormitory.

3, is responsible for the site to party B two safety education.

4, is responsible for the technical delivery, acceptance, on-site construction and deployment; material procurement.

5, to coordinate the internal and external construction environment, and to do a good job for the party B operation of the various logistical services.

(B) Party B's responsibility

1, the strict implementation of the rules and regulations of the project department, in accordance with Party A's construction schedule, the organization of qualified laborers into the construction, and humbly accept the supervision and inspection of the relevant personnel and all sectors of the community and guidance (special types of work need to be licensed). Responsible for the maintenance and management of all construction equipment and labor protection facilities to ensure normal production. Finish the production tasks of Party A's production department on time. When the project department needs Party B's cooperation, it must fully obey. No additional conditions shall be imposed.

Party B is responsible for the scaffolding and safety protection materials, acceptance, unqualified materials shall not be used in the project. The loss rate of fasteners is 1%, and Party B will be responsible for the excess part, and Party A will reward the saving part according to the market price. There is no loss of steel pipe. Loss does not include the quality of fasteners due to damage, as well as the nut slip wire.

2, the team must be friendly between the types of work, cooperate with each other, not to shirk each other.

3, party B construction personnel to visit relatives, prohibited on the site site, the site and does not arrange accommodation. In case of special circumstances must be approved by the Ministry of Permission and by my family to do a good job of safety education, children should be strictly controlled by family members. Strictly prohibited in the dormitory fire cooking, private wires, confiscated by the investigation and punishment of appliances and a fine of 100 yuan each time. Accidents happen by party B bear the responsibility.

4, the construction period of conflict, should be promptly reported to the person in charge of the site, to seek a solution to the discussion, it is strictly prohibited to mob fights, such as fights on the construction site, regardless of whether there is no reason for a fine of 500 yuan each time, such as found to be responsible for the participation of the person responsible for or behind the back of the penalty for the responsible person of the contractors 1,000 yuan per person times. Strictly prohibited in the construction site or dormitory, found each time a fine of one hundred yuan, the fine is deducted in the warranty, such as violations of the law public security organs to deal with, the project does not assume any responsibility.

5, the labor force into the site construction, must carry out three levels of safety education, strict implementation of safety rules and regulations, in the event of safety accidents, to find out the cause of such as Party B's responsibility 'deduction and punishment in addition to the quality and safety deposit at the same time, according to the actual loss of accidents by the Party B, at the same time, while pursuing the responsibility for the responsibility, according to the responsibility of the seriousness of the heavy penalty measures. Occurrence of other accidents, medical expenses within 1,000 yuan by Party B is responsible for, outside of 1,000 yuan part of Party A bear 70% Party B bear 30%,

6, actively cooperate with the project quality and safety departments to do a good job up through the bottom of the timely signing of the safety responsibility at all levels, the implementation of the production safety responsibility system at all levels.

7, the occurrence of safety accidents should be immediately organized to rescue, and protect the scene, immediately reported, is strictly prohibited to conceal the accident without reporting.

8, Party B contractors should be the first person responsible for the production safety of this type of work, should take the lead in compliance with the law, are not allowed to violate the rules of command, accurately placed in the position of safety, quality, progress, efficiency, to ensure that all construction workers, all-round movement.

9, actively cooperate with the project department to organize safety knowledge learning, publicity and amateur classes, and implement to each employee, truly safety first, prevention first, people-oriented site safety atmosphere.

10, Party B must ensure that the team leader, full-time technical quality, safety inspectors in place, such as not in place the Ministry of the project has the right to 100 yuan / day - person penalty.

Article VIII materials, equipment supply

1, scaffolding materials are responsible for procurement by Party A, Party B should be used 15 days before the previous written report on the amount of plans.

2, the erection of protection used by Party B to provide their own equipment.

3, Party B shall not waste materials, cut off the steel pipe. Artificial waste of materials caused by Party B to bear all the losses.

Article IX Other

1, Party B must be fully and effectively organize the site construction personnel, must meet the progress of the project needs to put an end to subcontracting, once subcontracting occurs, Party A has the right to terminate the contract, the security deposit is confiscated.

2, Party B shall obey the management and command of Party A, implement all the rules and regulations of the project department, and comply with the national policies and decrees, Party B shall have the right to unilaterally terminate the agreement and arrange for construction of another team during the construction due to the chaotic management, the quality and safety do not comply with the requirements of this agreement, and the construction period does not meet the Party A's requirements. Termination of the agreement according to the stage of prepaid wages to terminate the settlement, the balance and the deposit for the loss of Party A to make up.

3. The agreement will come into effect after signed by A and B, and will be terminated after the completion of the project. This agreement is in three copies, two copies of Party A and one copy of Party B. The agreement will be signed by Party A and Party B after the completion of the project. Matters not yet concluded, according to the project department of the relevant provisions of the implementation of the above agreement with the two sides **** with the implementation of the agreement.

Party A: (seal) Party B: (seal)

Representative (Signature): Representative (Signature):

Date: Month of year Date:

The agreement is in three copies.