URA approval of fire procedures

Buildings in the construction, remodeling or use of the process, you need to submit the relevant fire application materials to the URA, after the review and approval of the URA, before the subsequent construction or use of the project.

A, submit fire application materials

In the application of the URA approval of fire procedures, the applicant needs to prepare all the relevant fire application materials. These materials usually include the design drawings of the building, the layout of fire facilities, fire equipment list, fire safety management system. These materials should reflect in detail the structure of the building, its use and the availability of fire fighting facilities to ensure compliance with fire safety requirements.

Second, the URA to review the application materials

The URA, after receiving the applicant's fire application materials, will organize professional staff to conduct an audit. In the audit process, the URA will focus on the building's fire safety design, the configuration and integrity of fire safety facilities, fire safety management system integrity and other aspects. If there are non-compliant application materials, the URA will require the applicant to make corrections and resubmit the materials.

Three: Approval and issuance of fire safety procedures

After the review by the URA, if the fire safety of the building complies with the relevant regulations, the URA will approve and issue fire safety procedures. This means that the building is ready for subsequent construction or use and needs to be constructed or used in accordance with the approved fire safety requirements. At the same time, the URA will also conduct regular supervision and inspection of the fire safety of the building to ensure that fire safety measures are effectively implemented.

In summary:

The approval of fire safety procedures by the URA is an important part of ensuring the fire safety of a building. The applicant needs to prepare all the relevant fire application materials, and after the review and approval of the URA, the subsequent construction or use of the project can be carried out. In this process, the URA plays an important regulatory role to ensure that the fire safety of the building complies with the relevant regulations, to protect people's lives and property safety.

Legal basis:

"Chinese People's **** and the State Fire Law"

Article 13 provides:

The State Council department in charge of housing and urban-rural construction shall apply for fire acceptance of the completion of the construction project, the construction unit shall apply to the department in charge of housing and urban-rural construction for fire acceptance.

Other than the provisions of the preceding paragraph of the construction project, the construction unit after acceptance shall be reported to the competent department of housing and urban and rural construction for the record, the competent department of housing and urban and rural construction shall carry out random checks.

"Interim Provisions for the Administration of Fire Protection Design Review and Acceptance of Construction Projects"

Article 25 provides:

After the completion and acceptance of special construction projects, the construction unit shall apply to the competent department for fire protection design review and acceptance for fire protection acceptance; without fire protection acceptance or fire protection acceptance is unqualified, is prohibited from being put into use.