Today's exercise subjects are:
Project management, regulations, engineering economics,
Mechanical and electrical, municipal, construction management and practice, water conservancy
(Answers are at the end of the questions in each subject)
"Construction project management" daily practice
Multiple choice questions
1. Preparation of the implementation rules of construction supervision of the construction of the project The basis includes ( ).
A. Project-related standards, design documents and technical information ?
B. Supervision outline C. Supervision contract D. Supervision planning E. Construction organization design
2. process control methods to control construction costs, control points are ( ).
A. Labor and material costs are controlled according to the principle of quantity-price separation
B. Material prices are controlled by the project manager's department
C. Sporadic materials are controlled by measurement control methods
D. Construction machinery usage fees are mainly determined by the number of benches and the price of the unit of benches
E. The scope of the subcontracting is determined by the project manager's department. Factors are mainly the specialization of the construction project and the project scale
3. On the construction cost management, the correct statement is ( ).
A. Construction cost forecasting is to estimate the cost of the project before construction
B. Construction cost plan prepared after the start of the project
C. Construction cost control should be carried out throughout the entire process of the project from the bidding stage to the return of the bond
D. Construction costing needs to be consistent with the image of the progress of the three, the value of the statistics of the actual cost of the three ranges of values
E.
E. Construction cost deviation control, analysis is the core, corrective action is the key
1. DE
Analyze which A, B, C belongs to the preparation of the basis of supervision planning; D and E is the supervision of the implementation of the rules of the preparation of the basis of the answer is DE.
2. ADE
Analyze the option B material prices by the purchasing department is responsible for controlling
The construction cost plan should be prepared before the start of the project, and the control of construction cost deviation, analysis is the key, corrective action is the core, so we should analyze the reasons for the deviation and take practical measures to correct it. The answer is ACD.
Construction Engineering Regulations and Related Knowledge Daily Practice
Single Choice Questions
1.According to the "Regulations on the Management of the Quality of Construction Works", the starting date of the warranty period for construction works is ( ).
A. Completion and acceptance ?B. Delivery for use ?C. Payment of the full price by the contractor ?D. Completion and acceptance for the record
2. If the construction unit finds out that there are indeed errors in the design documents and drawings during the construction process, it should promptly submit them to the ( ) to avoid unnecessary losses and quality problems.
A. Construction unit B. Supervision unit C. Design unit D. With the appropriate qualifications of the testing structure
3. The following options, without the implementation of forensic sampling and delivery of test blocks, test pieces and materials are ( ).
A. Insulation materials for rooms ?B. Admixtures used in concrete for load-bearing structures
C. Reinforcement bars and connector specimens used in load-bearing mechanisms ?D. Cement materials used in mixing concrete
1.A
Analyze The starting date of the warranty period of a construction project is the date of the acceptance of the completion of the project. For the re-organization of the completion and acceptance of the construction work, the warranty period is the date of re-organization of the completion and acceptance of the construction work which is accepted by all parties.
2.C
AnalysisIf the construction unit in the process of construction found that the design documents and drawings of the real error, should be timely to the design unit, so as to avoid unnecessary losses and quality problems.
3.A
Analysis of the following test blocks, test pieces and materials must be implemented to witness the sampling and delivery of inspection:
(1) for load-bearing structure of the concrete test block.
(2) masonry mortar test blocks for load-bearing walls.
(3) Reinforcing steel and connection joint specimens for load-bearing structures.
(4) Brick and concrete mini-block for load-bearing walls.
(5) Cement used for mixing concrete and masonry mortar.
(6) Admixtures used in concrete for load-bearing structures.
(7) Waterproofing materials used in underground, roofing, and toilet and bath rooms.
(8) state regulations must be implemented to witness the sampling and delivery of other test blocks, test pieces and materials.
Construction Engineering Economics Daily Practice
Multiple Choice Questions
1. On the cash flow drawing rules, the correct statement ( ).
A. The horizontal axis is the time axis, which extends to the right to indicate the continuation of time
B. The intersection of the arrow line with the time axis indicates the point at which the cash flow occurs
C. The length of the arrow line must reflect the difference in the numerical magnitude of the cash flow at each point in time in a positive proportion ?
D. The nature of cash flows is not the same for different people ?
E. The point on the time axis usually indicates the starting point of the time unit
2. The following indicators of economic effect evaluation, belonging to the dynamic analysis of profitability indicators ( ).
A. Total investment return B. Financial net present value C. Net profit margin of capital D. Financial internal rate of return E. Current ratio
3. According to China's current financial and tax system, can be used to repay the loan of the source of funds are ( ).
A.Depreciation of fixed assets ?B.Amortization of intangible assets ?C.Amortization of other assets ?D.Surplus reserve fund ?E.Reduced business tax payments
1.ABD
Analysis C. The length of the arrow line is not required to reflect the differences in the size of the numerical value of the cash flow at various points in time in a positive proportion
E. The points on the time axis usually indicate that the time unit of the BD
2.BD
Analyze the total investment return and the net profit margin of capital belong to the static analysis of profitability indicators; the current ratio belongs to the analysis of solvency indicators
3.ABCE
Analyze the question is the repayment of the source of funds. According to the provisions of the current financial and tax system, the sources of funds for loan repayment mainly include profits that can be used to return the loan, depreciation of fixed assets, intangible assets and other assets amortization costs and other sources of repayment funds.
Electromechanical Engineering Management and Practice Daily