Gannan for the environmental assessment what formalities are required

General EIA process is divided into the following steps:

One, project

1. Preparation of project book

2. Carry the project book to the district Economic Development Bureau to apply for the project file (go to the first to ask for the file need to provide materials)

Two, EIA

1. After the completion of the case, take the case information to the local environmental protection bureau for environmental assessment matters. The local environmental protection bureau for environmental assessment matters, such as only the need for environmental assessment report form, the enterprise can fill out the independent, basically does not incur costs; if you need to make the EIA report EPA will recommend several qualified assessment organizations to help complete the preparation of the report and the EIA in the work of the selection of the EIA organization that will incur costs.

2. Select an EIA organization to sign the contract, the cost generally depends on the amount of investment.

3. The EIA organization came to view the site, the enterprise to provide all the information required in the EIA and all the details (production process, the use of a variety of raw materials and the annual amount of details, storage methods, waste disposal methods, raw material composition, etc.). In addition, there is no noise, how to solve; there is no industrial wastewater, how to deal with; there is no exhaust gas harmful gas, how to deal with; there is no slag, how to deal with; how to deal with a variety of industrial waste, etc.;).

4. EIA agencies according to the project used in a variety of equipment, raw materials and auxiliary materials, the preparation of the construction of the project site before the start of the specific content of the surrounding air environment testing (such as noise, odor concentration, non-methane hydrocarbons, VOC, etc.), the frequency of testing (test a few days, several times a day testing, etc.), testing sites (plant set up a few test points around), enterprises with the EIA agency issued the test content, to the environmental monitoring station or third-party testing organizations to apply for testing.

5. Get the test report to the EIA organization

6. Retrieve the questionnaire from the EIA organization, go to the nearby residents' homes, neighboring enterprises and institutions to conduct household surveys, the EIA organization will have a certain number of copies of the survey requirements, the results of the survey can be returned to the EIA organization

7. Such as the production process will produce hazardous waste should be with the corresponding environmental protection treatment enterprises to sign a contract

8.

8. Commissioned by the EIA agency to prepare the EIA report; project information publicity (newspapers, networks); the organization of expert review meetings; according to the expert's comments to modify the EIA report; modified EIA report submitted to the City Evaluation Center, the Evaluation Center issued a technical assessment report; the district environmental protection bureau for approval, and finally the Environmental Protection Bureau will be issued a permit, the project can be developed and constructed.

9. Commencement of construction and project commissioning.

10. After the normal production of the project, the project to the district environmental monitoring station to apply for environmental acceptance

11. Acceptance of the entire EIA process after the end of the qualified, such as the acceptance of the unqualified, will again rectify until qualified.