Chief Engineer Competitive Speech Sample

Chief Engineer Competitive Speech 5

Speech is a social activity, is used in public places in the form of publicity. It is in order to ideas, feelings, examples and theories to understand the audience, impress the audience, "conquering" the masses, must have realistic target. Below I bring you the chief engineer bidding speech sample, I hope you like it!

Chief Engineer Competitive Speech Model 1

Dear business leaders, professional seniors:

Hello!

Leaders: good afternoon!

My name is ##, graduated from Fushun Petroleum Institute, studying electrical automation, I learned about our company in the job fair, and through the interview into the company as an electrical design, through the six-month probationary period to the formal staff.

I entered the company in July ___, under the leadership of the master ___, I gradually understand each step of the electrical design, and accumulated a relatively rich working experience and related knowledge, the reason why I bid for this position, because I have the following advantages:

First, familiar with the company's scope of responsibility for the electrical design and design of the tasks of each stage; electrical specialties and the division of other specialties; electrical specialties design each stage of the task Electrical professional design of the various stages of work procedures, etc.; able to collaborate with the subject specialties to participate in the site survey. Selection of station, site selection, line selection and collection of various basic information about the profession (including power supply, voltage level, power factor requirements, external line direction and local meteorological conditions, etc.); able to demonstrate the power supply program, according to the project's electrical load, load rating and electrical load estimation, to determine the principles of electrical design of the project, select the configuration of the substation; able to completely complete the project Preliminary design and construction drawing design; familiar with the interface division of labor issues of various professions to ensure a clear division of labor. In the design review, there are my master and other engineers are responsible for, to ensure that the design is error-free.

Second, familiar with the operation of the unit's electrical equipment and overhaul process is one of my obvious advantages, I went to the unit from __ years, from the beginning of the installation, commissioning and operation of the equipment, so far have been working in the first line, can skillfully engage in the routine maintenance of electrical equipment and preventive testing, etc., especially since the company from the second phase of the project, the use of a number of new types of electrical equipment and automatic microcomputer control

Third, in the company's two years or so, I participated in many engineering projects. These include: when I first came, Fushun project department of the first, second, third plant and washing plant sludge dewatering project, Gao Sheng light hydrocarbon project design are designed by my master, I am responsible for pre-construction design submission and as-built drawings. This year's major projects are: Daqing Poly South eight discharge station sedimentation tank air flotation renovation project and Daqing South Ⅱ sedimentation tank plus air flotation technology to deal with oily wastewater field test project, although the electrical aspects of the content of the workload is not very large, on the skid block within the distribution of electrical equipment, but I was still able to carefully complete; Huajin Group wastewater treatment and reuse project, four 500 square meters of air flotation and dosing system distribution, the system of lightning protection grounding and so on;; the KBM oilfield extracted water reuse steam generator source water treatment pilot test project, electrical equipment distribution in the container, lighting, grounding, etc.; Xinjiang oilfield Fengcheng oilfield heavy 32 wells in the area of the No. 1 special thick oil combined station sewage treatment system, including skid block power distribution and filter pipe pipeline electric accompanied by heat; LuLiang operation area water treatment plant water treatment equipment optimization and renovation project, skid block power distribution.

Love and dedication, I will work as a kind of enjoyment, work as a mission, so that our business is thriving, I will, as always, study hard, work hard, and constantly increase knowledge, improve their ability to do their part for the development of the enterprise.

Based on these, so, I hope to participate in the bidding, told the above. Wrong place, please correct me. Thank you!

Chief Engineer Competitive Speech Sample 2

Dear leaders, judges:

Hello!

I am bidding for the job today is the chief engineer of the Ministry of Operations.

I'll start with a self-introduction: I was born in _, this year _ years old, engineer, member of the Chinese **** production party. I joined the work in January, _ in five machine construction section, has served as a technician, assistant engineer, engineer position, served as a machine construction section of the technical director, construction room director; in March, _ transferred to the company's construction technology section, as a professional engineer; __ in April, _ transferred to the Dajiu project management department as the chief engineer of the project; __ in June, _ transferred to the Danzhuang project management department as the chief engineer of the project, in the beginning of the year _ transfer into the The operation department as the chief engineer. Has participated in the Nanxun Railway renovation, Qili Lake special line, Zhuzhou Railway Hub renovation, stone long new railroad, Zhu six re-route renovation, Nanjiu Expressway, Dajiu Highway, Danzhuang Expressway and other railroads, highways and other projects construction construction.

I think I have the ability to serve as chief engineer of the Ministry of Operations and conditions, the advantages are as follows:

First, a wealth of experience in construction and business capacity

Since joining the work of ___ years, has been engaged in the construction of the technical aspects of the work, step by step, step by step, the work of the practical, rigorous style, hard work business, working ability and technical level have improved greatly;. Has a wealth of technical management experience and a certain degree of management ability secretarial home; participated in the construction of a number of railroads and highways, the construction of railroads and highways have a more comprehensive understanding of the construction technology, familiar with railroads, highways, the construction technology of various professional construction techniques, construction technology; can effectively master the construction of construction implementation of the preparation of the construction organization design, can be for the actual development of the project practical construction program, and engaged in the measurement of the inspection of the work, Changes in design and adjust the concept of claims, the completion of the preparation of documents and other work, have achieved good results, by the leadership at all levels of praise.

Second, a certain amount of management experience

Once served as director of the construction room, the project chief engineer, in the grass-roots business leadership position has been ten years. During this period, chaired a number of technical meetings, construction technical difficulties of the seminar, to solve the technical problems of the construction site, and better fulfill the tasks. At the same time actively do a good job of leadership staff, to assist the leadership to grasp the management, so that their ability to work, coordination and management level and other aspects of a further . Improvement.

Third, with a strong sense of enterprise and sense of responsibility

I can consciously abide by the rules and regulations and labor discipline, love their own work, responsibility and love, work conscientiously, hard work. Proactive in the work, not afraid of hard work, not afraid of tired, find ways to overcome difficulties, and strive to complete all tasks.

Fourth, do a line, love a line, specialize in a line, strive for excellence, never-ending learning, hard work is my characteristic.

I do my job well at the same time, study hard business knowledge, and constantly improve their theoretical and business level, laying a good foundation for better work in the future.

Fifth, the work, I am good at brainstorming, extensive consultation, and can physically, give full play to their subjective initiative, creative work.

In daily life and work to focus on constantly strengthening personal cultivation, down-to-earth work, honesty, but also to unite comrades, the greater good, full support for the work of the leadership.

If this time I can bid successfully, I will try to do the following:

First, diligent study, improve their own quality, on the one hand, the study of political theory knowledge, and constantly improve their theoretical training, on the other hand is to strengthen the study of business knowledge, so that they are more competent in their work.

Seriously grasp the basic work of the group, learning and summarizing the advanced experience of others and work practices, so that our bidding level to a new level. Not only in the construction technology, in business, quotation and other aspects should also strengthen learning, and constantly improve their comprehensive working ability.

Second, solid work, forge ahead and continue to enrich themselves in practice.

Accumulation of technical data, the establishment of technical files, organization of research on new technologies, new processes, new materials, new methods to improve the technical level of the group, and everyone together to improve the work of the department, so that the work of the department is becoming increasingly scientific, standardized and rationalized.

Chief Engineer Competitive Speech Sample 3

Dear leaders, colleagues:

Hello!

The second time I stand to this podium, is to run for the post of chief engineer.

I run for the advantages of the chief engineer

1, professional counterparts, comprehensive knowledge. I read the University of civil engineering, after graduating from the University, in the design institute engaged in four years of architectural engineering design, has completed more than fifty nearly one million square meters of design tasks. After working in the organization, I have been engaged in the management of project supervision, science and technology promotion and building energy saving. He also utilized his spare time to comprehensively study the relevant knowledge of the architectural engineering industry, took the national registration examination, and successively obtained the qualification certificates of five registered engineers, namely, architect, first-class constructor, supervising engineer, costing engineer, and consulting engineer. He has mastered various basic knowledge in the field of engineering construction from planning and design to project costing to construction and supervision, and obtained the title of senior engineer in 20__.

2, persistent learning, continuous improvement. In today's era, knowledge is updated more and more quickly. After work, I love to learn. At the same time to obtain a variety of qualifications, but also to develop their own good habits of persistent learning, learning has become an important part of my life. Because I know: only insist on learning, in order to keep pace with the times, and constantly improve.

3, rigorous style, down-to-earth. Whether in the design institute engaged in design work or in the agency engaged in management, I always with a technical worker necessary rigor to require themselves, one is one, two is two, the work is never false. I can suffer, work pragmatic, leadership assigned to the work, always successful, seriously to complete. Outside the work, I do not love to socialize, do not try to make a name for themselves, only to do a good job.

My attitude towards running for the post of chief engineer:

The newly formed URA is responsible for the city's important task of housing security and urban construction, which has a large number of program selection, engineering design, construction management and other trivial matters, from the construction of housing to the various key projects and public **** cause, each project, each detail of the good or bad, are related to all aspects of the city's people's lives, are related to our housing, and we will continue to work together to improve the quality of life of the people. Every project, every detail, good or bad, is related to all aspects of the city's people's lives, are related to our Housing and Urban-Rural Development Bureau in the people's reputation. Chief Engineer is responsible for the technical matters of the Bureau, I am aware of its great responsibility, never dare to have a little lapse.

If the organization trusts me this time, I will certainly exhaust all my efforts and dedication, as much as I can learn for the city's housing security and urban and rural construction cause to contribute all their talents.

If this election fails, I am not discouraged, I absolutely obey the organization of my other arrangements, do other work, in the new position in the same way to contribute to all their abilities.

My speech is over, thank you.

Chief Engineer Competitive Speech Sample 4

Dear leaders and colleagues:

Hello!

Today, I feel very honored and excited to participate in the election of the chief engineer of the project department. Here, thanks to the company and the leadership of the project department to give me this opportunity! At the same time, I also thank all colleagues and friends who have been caring about me, supporting me and helping me grow! Today, my speech is divided into three parts. First, my work experience, second, my favorable conditions, and third, my work vision.

First of all, introduce my work experience, I graduated from Peking University, majoring in civil engineering, bachelor's degree, in the *** party members. At the beginning of graduation, I was assigned to the company's project department, engaged in on-site technical management. I contacted and dealt with a large number of on-site technical problems during the eight months, and completed a large number of programs, deliverables and negotiation preparation work. The days in is a process of accumulating experience and charging myself constantly, and these valuable experiences lay a solid foundation for my present work. After the successful completion and acceptance of the project, I was transferred to the marketing department of the company organs to do bidding work. Marketing Department and the most frequent contact with the operating department, through six months with the operating department of the concerted efforts, my business sense has improved greatly, so that I now deal with technical issues when the first thing to consider is the operation of the problem, the issue of whether the project is favorable to our department. In August, because of work needs, I came to the project department of area d to engage in on-site technical work. in September, the leadership of the project department appointed me as the head of the technical section, under the leadership of the chief engineer, the overall coordination of all the work of the technical section. In one year as the technical section chief, I led the technical section colleagues to write the construction organization design and the special program, complete all the delivery, negotiation, information and other work. At the same time, I coordinated with Party A, supervision, design and subcontracting to deal with a large number of on-site technical problems. Through one year's internal and external coordination work, I have a deeper understanding of technical management, and my own organization and coordination ability has been greatly improved. While serving as the head of the technical section, I am also responsible for the technical management of two high-rise buildings, #1 and #2, from the base trench excavation to the final decoration finish, I have accumulated a lot of on-site construction experience, problem solving and handling of problems `capability has been greatly improved.

The above is my experience, the following I say I campaign for the existence of chief engineer favorable conditions:

First, in dealing with technical issues at the same time, as the head of the technical section, I am also responsible for the internal management of the technical section, the technical section of the business capacity of each person, personality characteristics, work style is extremely familiar with the technical section of the business of the mouth of the internal circle of rich experience. For example, the quality and technology in the information on the intersection of the circle, technology and measurement in the negotiation of change on the intersection of the circle and so on.

Second, I have coordinated with the project department management, production, materials and other departments to deal with a lot of things, in cooperation with the project department departments have a wealth of experience in the circle. First of all, with the management is to negotiate the intersection of the circle, in the process of negotiating how to deal with the text on the skills, in order to facilitate the management of the settlement with the A party. Production how to consider from the technical point of view on the arrangement of each process, in order to be more conducive to the schedule ahead of time and the protection of finished products of each process. Material, the accuracy and timeliness of our technical bill of materials have an impact on the material department and production progress.

Third, I coordinate with the A party, supervision, design and solve a lot of construction problems, for the coordination of all parties to solve the problem on the scene has accumulated valuable experience. d area and e area for the same A unit, the same supervision unit, the design unit has the same, I have contacted them a year, each other extremely familiar with communication and exchange of problems occurring on the scene is more convenient.

Fourth, the leadership of the project department in order to exercise the young people, we are required to do technical work at the same time as production work, at that time, there are some technicians on this there are still emotions and do not understand. However, the fact proves that the leadership's decision is correct and far-sighted. Take me as an example, I am concurrently responsible for 1 #, 2 # building technology at the same time, but also concurrently responsible for the production of the 2nd floor, a year of on-site construction and production management so that I have a wealth of experience on how to rationally arrange the work process, how to solve the site of the various issues that arise, and these on-site experience on the technical management of the good impact, so that I think about the depth of the problem, the breadth of the problem has been greatly improved.

Fifth, d area and e area of the structure type, decoration practices, construction methods are basically the same, d area construction process occurs in a variety of drawing problems, quality problems, I have a deep understanding and awareness, through the prior control of the approach can be avoided in the e area of the same problem.

Sixth, I have accumulated some experience in the management of subcontracting team. Now the subcontracting mode with the previous years are very different, outsourcing team workers quality and legal rights awareness have improved, so we can not use the previous management mode to manage them, we have to use a new mode of management, I think:

First, we should combine with the characteristics of the project to choose a high quality, such or similar projects construction capacity and experience of professional labor team;

Second, the Strict and detailed contractual constraints on the subcontracting team, who should be done clearly divided.

Third, the project management personnel must be familiar with the contract and based on the contract on the labor construction team construction management.

Fourth, to strengthen safety management, to start from the ideological education and site safety measures.

Fifth, the construction team should be humanized management. To care for them in life, educate them in thought, and guide them in technology.

In the process of construction in the d area, due to lack of experience I have made some mistakes, the leadership of the project department has repeatedly reminded me and strictly require me. Strict is love, loose is harmful ah! These lessons and experience let me do the work to become more rigorous, serious, I will always remember the leadership of my teachings, and definitely live up to the leadership of my expectations.

The advantages and shortcomings of my own existence are described above. Then, if I run for chief engineer success, what measures will be taken? Here I will talk about my preliminary ideas.

First, the organization and coordination of construction technical personnel of the e area of drawings, relevant norms, mandatory provisions of targeted learning, according to the characteristics of the d area drawings of more problems, a close examination of the drawings, the drawings of the problem eliminated before the start of work. At the same time on the d area of technology, quality summary, because the d area and the e area of similar engineering characteristics, we can learn from the experience of the d area, lessons learned, to take the principle of prior control in the e area to avoid the recurrence of similar problems.

Second, under the leadership of the manager, coordinating the project department of each section of the personnel to carry out e area construction organization design and the preparation of the construction program of each sub-project. Communication with the sections before preparation, not a formality, the real meaning of the construction group and the program is targeted, operable. Safety program and the preparation of the program of greater danger should be especially careful and meticulous. To be truly meaningful to achieve the site has the feasibility.

Third, often with the party, supervision, design exchanges, safety, quality, progress of the project with all parties to communicate with the same, for the smooth implementation of the project to provide a variety of favorable conditions.

Fourth, often communicate with other sections of the project department, communicate with the management on the negotiation problem, communicate with the production on the schedule, communicate with the material on the accuracy and timeliness of the material.

Fifth, in the technical section to create a good learning environment, the organization of personnel to carry out more on-site technical issues, quality issues analysis meetings, the use of work, regularly organize meetings to learn, exchange of technical difficulties in the project and quality control difficulties.

Sixth, the technical work to achieve the responsibility of people, a clear division of labor. Reinforcing steel, template, concrete during the structure. Decoration period of the interior, eaves, roofing and other major items by a person responsible for the preparation of the program and delivery.

Seventh, as a general worker, can not be confined to the general technical management, but also from a higher level on the full implementation of the project to review, from a technical point of view to consider how to save costs, from a technical point of view to consider how to advance the schedule, from a technical point of view to consider how to avoid risk. Good at finding problems, and come up with solutions for the leadership to implement decision-making as a staff, out of attention, think of ways.

The above is my idea of a few points, may not be very comprehensive, but it is really my experience from the engineering practice. I think the chief engineer's position is more than a position and honor, and more importantly, a responsibility, if the election is successful, I will take this as a new starting point, with the help of the accumulation of past work experience, with the help of the original laid a good foundation for the project department to be full of energy, solid work, devote themselves to the project department's technical management, for the project department to make their own due contribution. If the campaign is successful, I confidently say, will not let the leadership and colleagues disappointed.

Finally, I am very grateful to the company and the leadership of the project department to give me such a self-presentation of the opportunity, I think this campaign is a democratic embodiment of the management company and the leadership of the project department to pay attention to the embodiment of talent. Regardless of the final result, I will play an active role of a *** Party member, as always, study hard and work hard. My statement is finished, thank you all.

Chief Engineer Competitive Speech Sample 5

Dear leaders, comrades:

Hello! Competition out of talent, competition out of vitality. Thank you for the organization for us to create a good opportunity to show themselves, exercise themselves, improve themselves. Participate in today's competition, my mood is very excited. Because this is not only a test of the courage to openly participate in the competition, but also a comprehensive test of my academic level, work experience and comprehensive ability. I am the provincial land resources survey and planning bureau, thank you very much for the leadership and comrades to give me the opportunity to bid for the survey and planning bureau chief engineer position. My speech includes the following three aspects:

First, my resume

I was born in September 20__ in Fuxin City, Liaoning Province, 20__ graduated from the Department of Geography, Liaoning Normal University, Bachelor's Degree; 20__ to the present, in the Liaoning Provincial Bureau of Land and Resource Survey and Planning work. 20__ promoted to the professor of researcher senior engineer qualification in 20__ obtained the provincial land development and consolidation license, the provincial land development and consolidation of the work of the Bureau of Land and Resources Survey and Planning in the year 20__. Land development and finishing qualification, 20__ in 20__ to obtain the first batch of land registration agent professional qualification. 20__ to serve as section chief position, the **** preparatory party member.

Second, the main work performance

I work in the Bureau of Investigation and Planning, has engaged in a number of land management technology business work:

1, 20__-20__ years engaged in urban cadastral survey work (during the period of 20__-20__ years in the Wolu Niu Shi Township of Fakou County, poverty alleviation). Worked for one year in "Sanliao" in Faku County during the period 20__-20__.) In yingkou old border area pilot work for half a year, complete the province's first full resolution of the town cadastral survey, won the former national land administration bureau of scientific and technological achievements of the first prize; participate in the preparation of "town cadastral survey practical technology manual" published by Liaoning people's publishing house.

2, 20__-20__ engaged in urban and rural construction land increase and decrease hook work. Directed the preparation of the province's first urban and rural construction land increase and reduction of hooks pilot project "Shenyang Shenbei New District" special planning and implementation planning, the results of the provincial department of scientific and technological achievements of the first prize; technology is responsible for the review of the hooks pilot project implementation planning 32, the preparation of the technical review of the main points of the province's technical training of more than 450 technicians; is currently presiding over the "Liaoning Province, urban and rural construction land increase and reduction of hooks pilot project". The "Liaoning Province urban and rural construction land increase and reduction of hook special planning" preparation work.

3, 20__-20__ years engaged in land development and finishing project planning and design work. Involved in project planning and design of 23, for the unit to create output value of more than 300 million yuan, planning and design results by the provincial department of science and technology achievements of the first prize, the second prize of three; organization of technical review of the province's project planning and design of more than 200, as the Ministry of Land and Resources expert review of the national investment project planning and design of more than 40, drafting the province's relevant technical regulations, specifications 30,000 words, training of the province's technical staff more than 500 times; complete the provincial department of science and technology project "Liaoning Province, the reduction of linkage between urban and rural land" preparation. Provincial Department of Science and Technology Project "Liaoning Province Land Development and Finishing Project Planning and Design Practical Technology and Application Atlas" research project, experts identified some of its results to fill the technical gaps in the field of the province, the research results to be published by the China Water Conservancy and Hydroelectric Power Publishing House, I served as the first deputy editor-in-chief; 20__ as the subject of the host, completed the Ministry of Land and Resources In 20__, as the subject of the host, completed the Ministry of Land "Liaoning Province, county-level land resources sustainable utilization evaluation index system and methodology research", won the first prize of the provincial Department of Science and Technology Achievements, Liaoning Province, the first prize of the results of academic research.

4. 20__-20__ engaged in the province's first land use status quo survey and provincial summary, land use status quo change survey work. Technically responsible for the provincial data summarization, chief editor of about 400,000 words of "Liaoning Province land use status survey data compilation"; technically responsible for the annual land change survey work, regular preparation of data analysis report to the Ministry of Land, for the province's total amount of arable land for many years in a row to maintain a dynamic balance has made a contribution to the 20__ won the "province's land use status survey" award. In 20__, he was awarded the title of "Advanced Individual of Provincial Land Use Status Survey"; he participated in the preparation of "Liaoning Land Resources" published by Liaoning People's Publishing House, and took part in the "Liaoning Land Use Status Survey and Research", which was awarded the title of "Provincial Government Science and Technology Survey and Research" by the provincial government. "in Liaoning Province, the current land use survey and research, won the third prize of the provincial government scientific and technological progress, the provincial bureau of scientific and technological progress of the first prize; participate in the "Liaoning Province, the current land use status quo changes in the survey and research", won the provincial bureau of scientific and technological achievements of the first prize.

5, 20__ years to date engaged in village cadastral survey, rural land change survey registration, statistics and daily cadastral management. Drafted the "Liaoning Province village cadastral survey implementation program", training the province's business personnel 300 times; completed the daily cadastral management of scientific and technological achievements, won the former National Land Administration of Science and Technology Achievement Third Prize 1; the former Provincial Land Administration of Scientific and Technological Progress First Prize 2, Second Prize 1; scientific and technological achievements of First Prize 2, Second Prize 1.

In short, over the years, in the leadership and comrades to help support, I have achieved a more fruitful work performance: Among them, the publication of monographs involved in the preparation of three, published 12 papers (including three core journals), research results have won the provincial and ministerial-level scientific and technological awards 21, and access to personal honorary title 14 times (of which 20__-20__ years) 5 consecutive years was named the provincial department of excellent professional and technical personnel).

Third, the reasons for the competition

I am bidding for the post of Chief Engineer of the Bureau of Investigation and Planning, the following reasons and advantages:

1, with strong organizational management and communication and coordination skills. I preside over the Ministry, the provincial science and technology project research, technology is responsible for the provincial data summary, organization and guidance of the project planning and design, business training and other operational work, can independently draft the implementation of the relevant work program, technical details, organizational leadership and coordination of relevant technical staff, section staff, group efforts, brainstorming, play personal expertise and teamwork spirit, proactive completion of the work task.

2, solid basic professional knowledge, high comprehensive business quality, with strong working ability and level. I have engaged in cadastral survey, land use status survey, land use special planning and other basic business work, the so-called "cadastre is the foundation, planning is the leader" fully explains the two in the land management of the important role and status. After more than 20 years of continuous professional theoretical learning and work practice, so that I have a wealth of professional knowledge and the ability to manage the judgment, research and solve practical problems; at the same time, as a Party member recruits, after the Party's education and training, so that I have a more profound understanding and awareness of the Party's cause, and more to add the goals and motivation of my life struggles, so that I have the confidence and ability to play a greater role in the new position, and make a greater contribution to the cause of land management. I have the confidence and ability to play a greater role in my new position and make a greater contribution to the cause of the land.