First, in accordance with the State Grid Corporation, the provincial company and the branch<< on the development of production safety "anti-violation">> requirements, September to October, the branch focused on a special anti-violation activities:
1, September 20 to 25, the establishment of the anti-violation activities of the leadership group, the development of the work plan, work content and practical inspection outline, held a meeting of the branch on September 26, the head of the departments of the special activities of the anti-violation activities of the arrangements, and work arrangements in the form of a document to the team
2, September 26 to October 16, the departments to carry out anti-violation activities, combined with their own reality, listed the existence of various manifestations of violations of the department, the organization of workers to analyze and learn, strengthen the anti-violation education, the leadership team to carry out targeted inspection and guidance. A **** found 16 violations, of which
Management violations 3
1), convey and implement the superior production safety documents, instructions or the spirit of the meeting is not timely, the implementation is not enough.
2), "operating instructions" are not approved
3), the field procedures are not timely review or with the changes in equipment and not revised in a timely manner
5 device violations
1), equipment number name is not standardized
2), the lack of distribution room safety warning signs
2), the power distribution room. Safety warning signs
3), no safety cordon around deep ditches and pits, and no warning indicator red light at night
4), incomplete or imperfect measures to prevent small animals
5), no protective netting on the outside of fan blades. Equipment room ventilation fan without anti-bird net
Behavioral violations of 8 items
1), before the operation does not check the safety equipment in detail, do not use the safety equipment correctly
2), before the operation of the ground knife, ground wire six unified verification
3), not according to the provisions of the use of unlocking key or unlocking operation at will
4), reverse gate operation is not serious, do not singing tickets, not reciting, not checking the equipment signage, location and equipment status
5), reverse gate operation without recording or false recording, recording files are not preserved
6), reverse gate operation without wearing a helmet, not in accordance with the provisions of the use of insulated gloves or insulated boots
7), the use of scheduling terminology is not rigorous, not standardized
8), the driver in the line of the driver to use a cell phone or talk with the Riders talk, energy is not concentrated
3, October 17 to 25, the departments on the violations found in the analysis and rectification.
4, October 26 to 28, the departments of this anti-violation special activities to summarize. October 31, the branch held a meeting of this anti-violation special activities to summarize.
Second, to meet the winter peak and the fall inspection work, my branch *** eliminated 10KV line serious defects 5, general defects 30, low-voltage line serious defects 9, defects in the existence of the ` **** nature of the problem is: the pole base tilted, falling switch serious burns, pole body rupture, UT line card lost. Low-voltage equipment defects 5 not eliminated, mainly some of the integrated meter box power side is not installed air switch. in October, for the 110KV Xiyang station recently occurred a few 10KV out of the line arrester explosion accident, Xiyang station 11 10KV out of the line arrester all for the replacement.
Third, October 26, Heshun oil wash leakage caused by the Xiyang Yangjiapo reservoir pollution, endangering the downstream county production and living water, "danger is an order", my branch in the county notified to set up a special line of rescue, and quickly organized a 62-member construction team, just three days of time will be 3 kilometers of 10KV rescue special line. The 10KV emergency special line set up to the scene of the emergency, and will be four capacity of 315KVA transformer installation in place, this special work with a positive response, rapid action and the spirit of the spirit of no compensation, by the chief commander of the emergency, vice mayor of Jinzhong City, Yang Suiting's high praise, greatly established my branch in the people's normal production and life is a serious threat to come forward, the urgent and righteous good social image. Good social image, our branch company in the development of quality services and establish the "national grid" brand image activities, to fight another beautiful battle. In this extraordinary work, we did not neglect the safety work because of the tight time and heavy task, after receiving the rescue order, immediately set up to Zhang Jian, manager of the relevant departments as the leader of the power rescue leadership group, clear rescue personnel's tasks and safety responsibilities, members of the leadership team to the scene many times to guide the work, and the construction staff to the site of the safety precautions to stop some of the construction personnel Do not wear a helmet, do not bring a seat belt, wear a helmet without a hat belt or hat belt is not tight violations, in the discovery of a number of helmets and seat belts have broken, affecting the safety of personnel construction, emergency deployment of some qualified safety equipment to the construction site, so that construction, although tense, but safe and orderly, and successfully completed the construction task.
Fourth, the ongoing 110KV Xiyang station synthesis from the transformation and urban network renovation project, we have strengthened the management of the construction team, the construction staff for safety education and training, and according to the plan to carry out safety day activities. Strengthened the management of the construction site safety, the requirements must be safe construction, civilized construction, equipped with a certain number of qualified safety work equipment.
V. Learning from the lessons of accidents in sister units. Requirements of the team in the safety day activities on November 3, October 27, "measurement of personal injury accidents in the briefing" to learn, safety regulations need to handle a ticket and two kinds of tickets to work in the relevant provisions of the focus on learning, deepen understanding. In the future, there are questions on the work ticket, to check before going through the work permit procedures, such as substandard tickets to be resolutely refused to carry out and handle the work permit procedures.
Sixth, in the monthly inspection of the two votes, we found that some teams on the new two votes in the implementation process, can not be strictly in accordance with the << the new two votes supplemental rules >> implementation, mainly in the implementation of the work ticket, there are the following problems:
1, do not fill in the requirements of a unified black neutral pen;
2, the members of the work team do not fill in the Or fill in incomplete, the total number of members of the work team will not count the person in charge of the work
3, the number of groups of grounding wire is filled in for the grounding wire number;
4, there are a number of power supply office personnel are not clear about the work of the ticket issuer, the person in charge of the work, the work permit, the full-time guardian and the work of members of the work team of the respective responsibilities of these five kinds of people, there are still in the work of the ticket and the role of each other
p> 5, the development of risk factor control measures are not practical, generalized,
In response to the above situation my branch company specializes in the relevant personnel to carry out the "two votes training" on the two votes to implement the process of the common problems and the five kinds of people to focus on their respective responsibilities explained, while the relevant personnel were issued with a black neutral pen. The staff were also given black neutral pens. The company's main goal is to provide the best possible service to its customers," he said.
In the implementation of the new work ticket, found that 1, transformer a ticket, "should be installed grounding wire, insulation partition" than the old electrical a ticket less "***___ group", may be omitted in the printing process.
2, in the new line a ticket in the old line a ticket should be "installed grounding wire number" a change to "grounding wire group group number", and many people do not notice this change, or fill in the "grounding wire number". "grounding line number", at the same time, whether it can increase "***___ group" words, please superior study.
The next stage of my branch safety work focus:
1, continue to strengthen the 110KV Xiyang station synthesis from the transformation and the city network transformation site safety management, deepen the operating site risk factors and the analysis of danger, to ensure that the projects are completed on time, quality and quantity.
2, continue to carry out in-depth fall safety inspection, do a good job of eliminating defects, to ensure that the branch transmission and distribution equipment successfully through the winter peak.
3, before December 15 to complete the six 35KV substation removal work, fundamentally eliminate due to the duty personnel themselves caused by the substation personnel injury.
4, continue to carry out in-depth anti-violation activities and the implementation of two-ticket training, and strive to anti-violation activities and the implementation of two-ticket with the ongoing transformation of the city network, substation renovation work combined to ensure on-site safety at the same time, and to further promote the branch safety management to a new level.
5, do a good job in the second half of the safety inspection preparations.
6, do a good job in advance of next year's spring inspection preparations.
7, do a good job summarizing the year's security
.