I would like to ask the supervision points of intelligent installation of buildings, such as the quality and schedule control of intelligent weak current engineering and other equipment installation.
Equipment installation is nothing more than the following: 1, lightning protection. 2, waterproof. 3, dustproof. 4. Horizontal and vertical (beautiful and regular). 5, hidden line without fracture, disconnection, etc. 6. Laying lines should be horizontal and vertical (same as 4). 7, all kinds of boxes, bridges according to the high pressure standard. Progress control is mainly to prepare the construction organization plan (technical standard) and various progress reports. Then according to the progress difference, find out the reasons that affect the progress and solve them. My understanding of supervision now is that doing a good job in archives means that you have completed 70% of your life-long supervision project, the remaining 27 are responsible for progress and quality, and the last 3% can be the real management of the project (the standard in the book).