Engineer is responsible for the development of the company's functional business sections of the scope of work, job responsibilities, business results review and confirmation of work. The following is a summary of my work as an engineer, I hope it will help you!
Engineer's work summary 1Time in a hurry, between the eyes has graduated three years. In the company has been working for more than two years, due to the demand for work and improve their technical level, I entered the technical department of the power distribution equipment limited company to study and work. In the company's work so far more than two years, has grown into a qualified electrical engineer.
Just into the company, must go to the electrical workshop internship. During the period is mainly to familiarize with the product, for the future design to lay the foundation. After the end of the internship, I officially entered the technical department work.
At the beginning, I was mainly responsible for the design of small box, pgl, ggd, some more standard xgn36(15)-12 and some other small orders, usually the number of units in a few units, or the output value is not more than 100,000 orders. During this period of time, I followed the chief engineer and old engineers to learn, and trained professional skills and basic knowledge at night, and then tested the learning results on the orders. This period of learning and work has left me a deep impression and impact.
Some of the more standard engineering orders, such as star-delta buck start, full-voltage start, autotransfer buck start, motor forward and reverse, etc., these are studied in school, but at that time, the impression was not deep, after doing these motor control projects, the previous theory and practice together, to be able to cite a few examples, to design their own style of control products. For example, temperature control box, gas control box, street light control box and so on. The main problem encountered in these products is the arrangement of components placement, which directly affects the box or cabinet of the external dimensions, as well as the cable direction. Once not careful, the user will encounter a large number of problems in the process of installation and use. To do this kind of product, must be careful, more to the scene and customer communication, understand the customer's intention, it is best to design a rough layout and appearance of the map to the customer to confirm.
With the growth of experience, began to do a relatively large set of gck, usually the number of dozens of units or hundreds of units, the output value is usually more than half a million dollars, or even a million dollars. The main functional units are: metering cabinet, feeder cabinet, capacitor compensation cabinet, feeder cabinet, city power conversion cabinet, contact cabinet. Metering cabinet basically every two years Guangdong Power Grid Power Supply Bureau will put forward new requirements, usually put forward new requirements within a month, the problem is the most cases. For example, the previous requirements of 315kva and above, the transformer requires the installation of two sets of current transformers, an active meter, an electronic meter, using low-voltage billing. And now for a group of current transformers, an active meter, must be installed 10kv high-voltage metering cabinet, using high-voltage billing. Once you do not pay attention to this issue, shipments to the site can not pass the electricity, can not pass the acceptance, the site remodeling project is very large, and will bring negative impact to the company.
gck commonly used feeder unit for the drawer cabinet, is a more advanced cabinet type. Usually need to pay attention to the load is whether there is "non-fire protection load", such a load in the fire must be shut down to prevent the expansion of the accident. Usually in the molded case circuit breaker is installed with a dc24v fire shunt coil to realize the trip. Many people understand as "not - fire class must protect the load", resulting in the tripping coil added the wrong location, the fire class to jump off some of the load, such as fire fans, fire pumps, etc., in fact, fire class loads can not be blackout. In fact, fire loads cannot be de-energized, which will lead to a more serious fire in case of fire. It should be understood as "non-fire loads that must be protected".
Then later, began to do high-voltage cable transfer box dfw-12 and high / low-voltage pre-assembled power station ybp (m), and then to the xgn15 ring network cabinet, kyn28a-12 in the middle of the cabinet, as well as the more complex plc and inverter control cabinets, DC screen (gzdw), signaling panels; from the simple to the complex; From small projects, small quantities to large projects, multiple large orders; with the increase in the number of design projects, the growth of experience, for each cabinet type of system schematic design, the design of the secondary control wiring diagrams, including a variety of non-standard motors, fans, fire control boxes, as well as a variety of dual-power supply, multiple power supply three-into-two, five-into-three system to be able to skillfully master, and reasonably use. At the same time, is very familiar with the structural characteristics of various cabinets. Has been responsible for the design of engineering projects; through the cooperation with the Party A, weak power designers, a more comprehensive understanding of the design and operation of the power system. During these years followed the chief engineer to participate in the analysis of the brewery vertical busbar terminal arc pulling accident, Fenggang Power Supply Company 10kv outdoor cable tap box short circuit fault analysis, the plant is affected by the harmonic treatment program, as well as the shoe factory noise treatment of high-current cabinets and other events, deepen the understanding of the theoretical knowledge, can be better combined with the theory of practice, deepen the impression of the products have a newer understanding of the broadening of the field of vision.
Engineer's work summary 2After the Spring Festival in 20xx I was transferred to the project department as a civil engineer, in the project department is mainly responsible for the technical and coordination work of civil construction professionals.
In the first half of 20xx, I mainly carried out the preliminary preparatory work for the civil construction of the second phase of the project. According to the requirements of the chief engineer of the project department, is responsible for organizing the civil construction professional foreman, quality inspector and other familiar with the construction drawings, and completed the civil construction professional drawing review work, put forward the drawing review record *** counting more than 70, for the engineering negotiation and design change notification form 2, of which 95% of the problems have been resolved through the drawing review and negotiation, change record, the remaining issues are still in communication and coordination with the design unit, the construction unit. The remaining issues are still in communication and coordination with the design unit and construction unit.
In order to ensure the smooth progress of engineering construction, in the pre-construction phase of the project first completed the "construction organization design" of the adjustment and improvement of the work, and then so far, *** preparation, including the "earthwork construction program", "measurement of the construction program", "test plan", "waterproofing construction program", "rainy season construction program", such as the program*** counted 11, the follow-up is being prepared in the construction program Including "reinforcing steel construction program", "concrete construction program", "to create the Great Wall Cup Technical Measures", etc., to do a good job of technology first, to ensure smooth construction.
In the preliminary preparation of the construction site, under the guidance of the chief engineer of the project department, I was responsible for completing the design and drawing of the construction site fences, gates, and other construction drawings, and went to the construction site for a site visit to ensure that the drawings are applicable and accurate. I also consulted with the chief engineer *** with the planning of the general layout of the construction site, the location of the tower cranes used in this project, such as positioning, and the preparation of the "tower crane foundation and group tower operation construction program" for the construction of the project to do a good job in the early technical preparations.
Due to the original technical staff of the project were arranged to the project department, in the first half of 20xx, I also served as the project of the later maintenance work.
In the second half of 20xx, I have to continue to look for shortcomings in the work, more to the experienced seniors to learn and ask for advice, in order to better enrich themselves, to make up for their shortcomings, in order to successfully complete the construction of the xx project to contribute to the power of self.
Engineer's work summary 320xx year has passed, we have grown a year. As a civil engineer last year is the second full year since I became an employee of the company, after another year of continuous learning, as well as colleagues, the leadership of the help, I have been fully integrated into the Beijing-Australia real estate this big family, the individual's ability to work has also improved significantly, although there are still such and such shortcomings in the work, but it should be said that this year paid a lot of money, but also harvested a lot of my self to feel that people are more and more mature. In xx year, I am responsible for the three phase A area 1# building successfully connected to the top, masonry is completed, the reason for 3# building main construction completed to 29 floors, 22 floors under the masonry is completed, all in all, it is not good enough. Looking back at the work of the xx year scenario is summarized as follows:
First, the drawing specification is the fundamental management.
Every time I hear the drawings of the review of the construction unit said the sarcasm, expect the A party supervisors to look at the drawings to raise the issue of the door are not, the kind of ridicule and disdain, has been y burned in my mind, I think this is both a provocation and a challenge. Construction blueprints are the basis for construction and fundamental.
Experienced a lot of projects, the start of construction are more urgent. As a participant in the construction of the three main units really time is very short, so the drawings on the head of many problems in the drawing review simply can not mention, and construction will find that the node does not light, the size does not match a series of problems. All the work of the focus of contention are inseparable from the construction blueprints, all the construction program, construction procedures, construction techniques are inseparable from the construction blueprints, all the cost control of the project are inseparable from the construction blueprints, the importance of the visible drawings will be examined, but unfortunately, many projects have not yet recognized that ah! Although the project management and teaching not much **** the same point, not to say that others a bowl of water, you have to have a bucket of water, in short, you do not have the water is not possible with the construction unit "competition". How to do in the hands of food, the heart does not panic.
Two, the enterprise should have a core culture.
Encyclopedia, corporate culture is the enterprise in order to solve the problem of survival and development and set up the composition. It is the basic beliefs and perceptions that members of the organization believe to be effective and **** enjoy and **** follow. Corporate culture focuses on the core propositions of an enterprise's business management, and the resulting organizational behavior. Corporate culture, or organizational culture, is the unique cultural form of an organization consisting of its values, beliefs, rituals, symbols, and ways of doing things. Corporate culture refers to those corporate values and business practices that are shared by all divisions of an organization, at least by its top managers***. It refers to a division of the enterprise's functional departments or departments located in different geographic environments have the same kind of **** cultural phenomenon. Enterprise culture is a new theory of modern enterprise management, enterprises to really enter the market, out of a faster development, better efficiency, the overall quality of continuous improvement, so that the coordinated development of the economy of the road, it is necessary to popularize and deepen the construction of enterprise culture. Enterprise culture has a broad and narrow understanding of the two.
Broadly speaking, corporate culture refers to the material and spiritual culture created by enterprises with their own characteristics; narrowly speaking, corporate culture is a synthesis of business purposes, values and moral codes of conduct with their own personalities. I'm not sure if you're going to be able to get the best out of me, but I'm sure you're going to be able to.
Three, building cohesive team, learning team.
Speaking of team building have to say cohesion, speaking of cohesion have to say positive energy. Encyclopedia, "positive energy" is a term of physics, and "positive energy" of the popularity of the British psychologist Richard Wiseman's monograph "Positive Energy", which compares the human body to an energy field, after the stimulation of the inner potential to enable people to show a new self, and thus more confident, More energetic. "Positive energy" refers to
a healthy, optimistic, aggressive power and emotion. Nowadays, Chinese people label all the aggressive, healthy, inspiring, empowering, and full of expectations as "positive energy". It has risen to become a symbol full of significance, y tied to our emotions, expressing our aspirations and expectations. Positive energy is a kind of aggressive attitude, positive energy is a kind of transferable energy, so that we are more aggressive, more sunshine. I remember reading a sentence: loaded with half a cup of water, optimistic people see is half a cup of water, pessimistic people see is half empty cup.
No matter how you look at it, that cup is half-filled with water, not by your will, it would be better to let the self-satisfaction a little bit, a little bit of joy. Unless you have enough willpower, don't make friends with negative energy people. Positive energy is especially important in team building. Team learning refers to a unit of group learning, it is a learning organization for learning the basic components of the unit, to facilitate mutual learning between the members of the unit, mutual exchanges, mutual inspiration, *** with the improvement. Team learning is the development of group members as a whole with the realization of the *** with the goal of this process. Age is our biggest enemy, only more learning to adapt to the ever-changing society. Team learning for organizations and individuals is a win-win choice, but also a win-win result. Team building is a team when it is good, and it is a gang when it is bad. Team is a kind of spirit, is a kind of power, is indispensable in modern society!
Four, rationalization proposals.
1, modern management. Site conference room equipped with a projector, engineering construction problems were put out in the form of PPT, for disobedient labor teams and managers to focus on learning until the ideological transformation.
2, the project should have its own detailed approach.
3, 20xx year, for me is to explore, learn, improve a year, coping with the work of different materials with the previous, I corrected the mindset of the self, give full play to the supervisor's initiative, aggressive and proactive thinking. In such a year, I have enriched myself through my own labor, and broadened my horizons through the opportunities given to me by the leadership. But in the work of dealing with the site matters, management is not enough; dealing with the problem is not too careful, these problems I will pay more attention to overcome in the new 20xx year. The road is long and far away, I will go up and down and seek.
Engineer's work summary 420xx x month I was recruited to the real estate development limited company work, as a water and electricity engineer position, was arranged to the garden is responsible for the owner side of the water and electricity project management, so far the work has been a year and a half, to the site has been full of work for a year. Since a year in the company's leadership support and the assistance of colleagues, the basic successful completion of the corresponding work tasks, recognized and praised by the leadership, but also learned a lot of new knowledge, made some achievements, but compared with the requirements of the leadership there must be a gap. During the work period, I work hard, conscientious, not dare to burn out, with good professional ethics and strong sense of duty to work seriously and carefully. Now on a year of work scenarios and water and electricity project management experience to do the following report:
Since 20xx, X month X from the head office to move to the site, when a piece of flat land, I cope with the whole building of water and electricity project management work, the task is large, the project type is many (high voltage electricity, low voltage electricity, fire protection, water supply and drainage, elevator, lightning protection, intelligent, gas, communications, digital television, etc.), from the drawing digestion From drawing digestion, deepening, with the budget to the contractor visit, construction program review, drawing review, on-site construction management, completion and acceptance. The work does encounter many difficulties, response to my own did not flinch, aggressive problem solving, take the initiative to ask the leadership, aggressive and design units and construction units to communicate and coordinate various relationships, so that the project smoothly carry out the work to speed up the progress of the project.
In the actual work, I seize the time to familiarize myself with the drawings, and the relevant design information, combined with the relevant norms, the actual scene and work experience to optimize the drawings. Due to the power distribution system, high-voltage and low-voltage drawings designed by two design units, the switch and the bus cable wire diameter part does not correspond to; low-voltage distribution map in the public **** part of the design of the installation of distribution metering box, can not meet the requirements of the power supply sector, some of the cables use wire diameter is too large resulting in waste, some of the cables
wire diameter is too small can not meet the use of the norms, the lack of generator distribution screen to the generator connecting cable and link line. Generator distribution screen to the lack of connecting cables and contact lines; water Shi map in the basement drain, small municipal drain and municipal drain elevation there are contradictions, due to the district southwest of the Science and Technology Road has not been built, there is no municipal drainage pipeline, the entire district must be accessed to the West municipal pipeline drainage pipeline, and so on. After communication with the design unit, construction unit, government departments, major problems on the leadership and civil engineering professional contact to civil engineering professional colleagues, the problems have been solved. In the field construction, for important engineering parts and easy to problematic division of the project, to take a long time to stand by and supervise, for example: the installation of basement sidewall drain sets, 1-4 # first floor and small municipal drainage pipe elevation determination, installation, backfill, layered tamping; pre-buried, concealed installation and other hidden electrical wiring installation, related to the major switches, electrical box installation, etc. are required to stand by and supervise. Supervision to ensure construction quality. After a period of time, must achieve results, but the water and electricity installation project is built on the basis of civil engineering, in the future construction of the inevitable existence of changes and modifications, which is also the new year need to seriously think about solving the problem.
Since the start of construction, I have encountered a lot of problems, due to the original mode of thinking and the lack of attention to the construction of electricity, professional units and general contracting units of the construction of electricity contradictions, the sales center before the opening of the sale of the distribution of power is not parallel to the occurrence of tripping scenarios, affecting the office, was severely criticized; so that I recognize the shortcomings of my own, but also with the fact that I have been given a valuable lesson.
All along the management of water and electricity works, I got the strong support of Mr. Liu and other leaders and colleagues to assist, the leadership of the trust, support and colleagues to help me to express my heartfelt gratitude, I am confident that the project's water and electricity works management to do the best. So in next year's work is ready to strengthen from the following aspects:
1, broaden the knowledge base, in the work of the relevant knowledge to draw, so that their own from the civil engineering, decoration, engineering budgets and other aspects of the strengthening;
2, do a good job of external coordination work, forge ahead with the design unit, the construction unit and the relevant government departments to communicate;
3, adhere to the three main focuses (quality, schedule, cost and cost of the project). Focus (quality, progress, cost);
4, the development of the overall work plan, everything in the interests of the company as the main.
Engineer's work summary 5First, ideological and moral
I have always been very supportive of the party's policies and guidelines, care about and study the country's current affairs and politics, adhere to a high standard to strictly require self, able to adhere to the four basic principles, can establish and adhere to the correct outlook on life, values and socialist concept of honor and shame. In recent years, I have always insisted on watching news reports, Global Daily News and other news columns or newspapers and magazines, through the understanding of national events and people's voices, to better learn to implement the party and the country's routes, policies and guidelines, and to adhere to the self-political awareness can be "keep pace with the times".
Second, professional ethics
In the focus on improving the ideological character at the same time, but also do not forget to pay attention to personal cultivation and professional ethics training and improvement. I have always insisted on learning about the construction project construction and other aspects of the laws, regulations, rules, systems and norms, standards, to be loyal, law-abiding, honest and self-disciplined, hard work, and constantly strive to improve the quality of my work. I have always been modest and studious, study the business, dedication, serious and responsible work, strong sense of responsibility, with good professional ethics, in strict accordance with the principle of "integrity, law-abiding, fair, scientific" to carry out construction supervision and management of building projects. Dedicated to his work, law-abiding, down-to-earth, diligent and meticulous in his work; helpful in life, united and caring for others. Able to lead the team, unity, play the wisdom and strength of the group, *** with the work of the cause.
Able to forge ahead to guide and lead the comrades just work, so that they always feel someone care, love and help, as soon as possible to change the protagonist into the work, and urge them to continue to improve their own business level, as soon as possible, better able to do their jobs.
Three, professional skills
I work in the process of continuous self-charging, participated in the training and assessment of the safety officer, supervisor training and assessment of the budget officer's continued re-education. I have studied the relevant laws and regulations, professional and technical knowledge, theory and
practice closely linked to the theory of practice, and in practice to summarize the work experience, in order to enrich the theoretical level of the self, and achieved twice the result with half the effort.
In recent years, I have been systematically learning professional theoretical knowledge, adhere to the work in the construction of the first line of construction, focusing on theory and practice, mastered a number of construction engineering professional skills. I can skillfully office applications such as office, proficiency in autocad architectural drawings, proficient in construction engineering, construction budgeting, with the preparation of construction organization design business level, can independently complete a full set of bidding documents preparation work, and according to the actual situation of the project skilled application of bidding skills to improve the probability of winning the bid and the benefits of winning the bid. He has mastered the skills of on-site construction and quality management of construction projects, and is capable of performing on-site construction, quality management, and on-site overall responsibility of medium and large-scale construction projects.
In the future work, I will, as always, continue to learn, and constantly supplement their knowledge, and constantly improve their professional skills, so as not to fall behind in this knowledge update society. Fourth, the work achievements and fulfillment of duties scenarios
Since joining the work, I participated in the construction of a number of construction projects, in the actual work, I always adhere to the conscientious and responsible, rigorous and pragmatic work attitude, learning to work hard, and constantly strengthen the theoretical knowledge, improve the level of professionalism, after eight years of workout, has grown up as a backbone of the engineering and technology.
20xx ~ 20xx period, I in Fujian source engineering supervision limited company mainly served as the Putian City Procuratorate attached to the project, good luck building project supervision. These projects are large in volume, with structural types such as brick, frame, shear wall and raft slab foundation. In these projects, I was able to combine theoretical knowledge with practice, and use theoretical knowledge to guide practical activities. In cooperation with the construction unit to cooperate, in order to ensure the quality and safety of the project under the premise of the successful completion of the delivery of use. In the delivery of the user's praise, in the supervision of the process responsible for the praise of the relevant units.
20xx~20xx, I in Putian Hanjiang District, Overseas Chinese New Town project as the site supervision project leader, the project construction scope is large, the quality of acceptance points, involving a wide range of knowledge, including construction, installation, landscaping, municipal and other specialties, the quality of the inspection and project budgeting work must be difficult. In order to accurately guide the construction, do a good job of quality inspection, reasonable budgeting, I consult relevant books, seriously study the relevant professional norms and quotas, so that the quality management in place, the final account has a basis to rely on. I insist on the first line of the construction site every day, regularly inspect the construction points, master the progress of each branch of the project and quality control points, to do beforehand control. At the same time to do a good job of cost management, grasp the price information of the construction materials, analyze the sub-projects of labor, machinery, materials, unit consumption, for the completion of the final account to provide reference. Participate in the delivery process after the completion of the project, understand the deficiencies on site, and make timely source of advice, which is well received by the demolition and resettlement households. Preside over the final account of the completion of the project, and negotiate with the construction unit and the audit unit. Strive to maximize the reasonable profit, and win the respect of the company site responsible for the construction staff. After the exercise of the project, my site quality, safety and management skills greatly improved, the level of final accounts on a stage.
In 20xx till now, I have been responsible for the financing and construction of the project of three passes and one leveling in the third phase of the Wat Shi Industrial Park, Damjin and Bian Dian area. After that, I was in charge of the engineering responsible for the whole area. In the project I adhere to the requirements of high standards of engineering quality, to do ahead of the pre-control, in strict accordance with the norms and standards required for the construction of each process of quality inspection, technical guidance, and seriously on the quality of the whole process of engineering and construction technology monitoring. Adhere to the safety first, prevention-oriented management policy, the site does not fit the safety of stopping all acceptance procedures to eliminate hidden safety hazards after the upper construction. To the site and planning, investigation, design, supervision and construction units to carry out comprehensive coordination to ensure the smooth progress of construction. In the project management process of the higher authorities in charge of safety supervision, quality supervision, construction management, monitoring squadron, quota station and the Construction Bureau of the relevant departments of the praise.
In order to be able to go to a new level, I enthusiastically expect to be able to promote the intermediate title engineer, in order to be able to better carry out their work, to serve the community. Although I work seriously and responsible, theoretical knowledge and business level to improve faster, but the construction industry is a deep learning, involving a wide range of knowledge of the industry, my management skills and the ability to take charge of the overall situation has to be further improved. I will, as always, adhere to the work of meticulous, diligent, hard to learn professional knowledge, business excellence, innovation, and constantly strive to enrich my theoretical knowledge, improve my work skills, and strive for greater improvement. Since the work of eight years, I have always tried to be a good technical management of construction projects, to contribute to the cause of the construction of self-power.
Engineer's work summary 6Entered the company in 20xx, along with the company's continuous development and growth, at the moment and is about to go through 20xx, ushering in a new year of 20xx. In the past year, I am mainly responsible for the SMT process. It is also this year, due to the leadership of the production process optimization of attention and support, so that I can give full play to my ability, for the company process optimization and cost savings contribute to a power. In the work, through the communication between departments, and external experts to discuss, not only increase my professional knowledge, and make my communication and coordination skills further improved. After the company's organization of executive training and other training courses and the usual culture of the enterprise, so that my sense of responsibility and work aggressiveness has also been greatly enhanced. But some big customers in the factory inspection of the problem points, but also reflects my work in the shortcomings and the need to enhance the place.
Such as empiricism is thick, the work of the systematic, lack of process; as the grass-roots managers, the site management experience is insufficient. Now on the 20xx year work to do a review, summarize. In order to do a good place to continue to carry forward, insufficient place to make improvements, and strive to do better in 20xx.
A: 20xx year summary:
1, production process optimization participation and promotion.
From the beginning of this year, the PCB in our production has long existed in the unimproved and some of the new out of the problem points: such as pad design, patchwork design and other issues to do a comprehensive summary, and put forward proposals to change the program. Each problem point through the "assessment report" form feedback to the engineering, development. And according to the specific characteristics of my factory's various equipment summarizes the "PCB specification requirements" supply to the company Layout reference. After at any time and Layout staff communication, to ensure the rationality of the board and the adaptability of our equipment.
2, SMT various operational standards and specifications.
After learning and summarizing, and combined with our own production, equipment features, the development of "stencil use and management specifications", "material baking specifications", "reflow soldering temperature setting specifications" and other operating norms. And the new equipment, such as: X-RAY, solder paste thickness gauge, AOI, etc. timely supply of operational guidance and operating specifications to ensure that the operation of the normative and safety.
3, tracking and processing of production problems to ensure product quality.
The board production of problem points in a timely manner to analyze the causes and feedback, processing. Such as 32851 once appeared small material soldering led to the phenomenon of PPM rise, analyzed for PCB burrs caused by timely request for suppliers to confirm the scene and together to explore the source of the rationale for the method. For some other internal operation problems caused by quality anomalies, we can also do timely guidance
Guidance and correction. Through the concerted efforts of everyone, the PPM value after the furnace from the average of 500PPM in xx years to about 150PPM at this moment.
4, the maintenance of equipment and maintenance.
The reflow soldering, AOI and some other self-responsible equipment, do the wear parts in a timely manner with regular maintenance work. On the production of equipment abnormalities in a timely manner to ensure the normal production and good operation of the equipment.
5, the process, AOI technician work guidance and supervision.
Guidance and assistance to AOI technicians for software upgrades and program optimization, to reduce QC work pressure. After the work of the problem point processing, training process technicians to analyze the problem and solve the problem of skills.
2: 20xx year planning
1, continue to promote the optimization of the SMT production process. 20xx year process improvement work may be more inclined to the exploration and solution of special problems. It is possible that every small improvement requires a greater effort to solve.
2, enhance the ability to serve large customers. Standardization and documentation of our process. To the technician's job responsibilities also process, standardized.
3, to further enrich the professional skills and level of self. Increase the familiarity of the new equipment, proficiency. Deeper to understand the SMT process related elements of the performance and working principle. Such as: the working principle of solder paste, PCB production process. For the future better job supply security.
4, SMT quality control. SMT production of problem points in a timely manner to track, feedback, processing. Strive for the furnace after the PPM value in the existing equipment under the condition of control within 100.
5, equipment maintenance, update. 16 sets of SMT reflow soldering, of which 8 sets of North Star are not the same degree of aging, wear and tear. Especially from the constant light to move over the four, heating wire, motor, other parts of the problem frequently. And there are two track deformation has been unable to use, temperature control accuracy has not reached the requirements of the need to do a more comprehensive inspection and a larger maintenance action.
Under the guidance of the company's strategic policy, with the strong support of the leadership, with the concerted efforts of everyone, *** with efforts, I believe that I will do a better job in 20xx; I believe that in 20xx xx can achieve more brilliant results.