Enterprise environmental protection self-examination report (General 5)
Time flies, a period of time has come to an end, looking back on this period of time since the details of the work, there are gains and shortcomings, it is time to properly recorded in the self-examination report. Come to refer to their own need for self-inspection report, the following is my organization's corporate environmental self-inspection report (General 5), I hope to help you.
Enterprise environmental protection self-inspection report 1
First, the enterprise profile
xxx Ltd. is a state-controlled large one-type enterprise with advanced technology and equipment, under the South Branch, North Branch, with an annual cement production capacity of 1.3 million tons. The enterprise has obtained product quality certification, quality management system certification, laboratory qualified certificate and other honors. In order to conscientiously carry out the implementation of energy conservation laws and regulations, implement the relevant requirements of the National Development and Reform Commission, the government and the municipal government, strengthen the energy conservation management of enterprises, promote the progress of energy-saving technology and improve the efficiency of energy utilization. The company as one of the thousands of enterprises key energy-consuming units and the provincial control of key energy-using enterprises, well aware of the enterprise is the main body of energy saving and consumption, and actively respond to the state and the government, the municipal government call, and vigorously promote the company's energy saving and emission reduction, the successful completion of the government, the municipal government issued energy saving goals, and energy saving and emission reduction work carried out in a colorful manner.
Second, the operation of 20xx and the completion of energy-saving goals and responsibilities
20xx, the annual plan to produce 1.1 million tons of cement, 20xx January to December, the company's actual production of 1,082,000 tons of cement, 98.36% of the completion of the yearly plan to achieve sales revenue of 190,426,000 yuan. Taxes paid 23.43 million yuan. The consumption of standard coal per unit product was 83.49kg/t, while the consumption of standard coal per unit product was 86.54kg/t in XX, which decreased by 3.05 kg/t year-on-year. from January to December of 20xx, the accumulated saving of standard coal was 0.33 million tons. Compared with the energy saving target of 0.29 million tons of standard coal issued to the company by the government in 20xx, the target value was exceeded by 0.04 million tons. As a result, the company has successfully and exceeded the energy saving target issued by the government.
Third, energy saving organizations and energy management work
To further implement and enforce the national energy conservation and emission reduction policies, and strengthen the main responsibility for energy saving, the beginning of 20xx, the company in the last year, on the basis of energy management organizations, institutions, to further improve the enterprise energy management work, adjusted the energy measurement, Energy-saving leading group and energy-saving working group, and actively adopt new energy-saving technologies to strengthen corporate energy management.
(a) Further improve the sound energy-saving management, organization, standard system.
The company tasked a vice president specifically responsible for energy conservation management and leadership, the heads of relevant departments as members of the energy conservation management and leadership group, set up the company's Energy Conservation Office, each functional department, unit clear energy conservation special, part-time responsible person, the formation of a three-tier energy conservation management network, by the production of integrated office of the relevant personnel specifically responsible for energy conservation work, at the same time, the establishment of energy conservation work organization and Management system, set up an energy-saving work management and leadership group, the company's general manager is the leader of the leading group of energy management; in perfecting the organizational system on the basis of further implementation of national energy policies, regulations and standards, organization, implementation, development of energy management standards, preparation of energy-saving planning and planning, implementation of energy management in the implementation of technical standards, is responsible for the organization of energy-saving inspections, energy measurement, statistics to monitor. Organize energy-saving technology training and publicity, issue energy-saving initiatives to further improve the company's energy management system.
(b) Decomposition of energy-saving goals, the implementation of energy-saving responsibilities for the development of product consumption quotas, and assessment of various departments.
The production of various processes, product energy consumption quota management, signed the energy-saving goal statement of responsibility, the energy-saving tasks and objectives of the cascade decomposition of energy consumption and wages and salaries, efficiency, and strive to tons of clinker, tons of cement energy consumption to reach the advanced level of the industry; energy-saving technology management department to establish a cost-control management system, the development of cost assessment and evaluation system, the assessment of the indicators detailed decomposition of relevant workshops, departments, responsible persons, and the assessment of the cost control system, and the assessment of the cost control system. Workshops, departments, responsible persons, regular evaluation and assessment; the development of workshop consumption indicators, assessment of the implementation of indicators; the establishment of energy statistics positions, a person responsible for the establishment of energy consumption and cost accounts. Optimization of the existing production process system for the balance of transformation, kiln temperature and thermal efficiency utilization, stand-alone unit hours than the previous year has improved significantly; in the vertical kiln to install inverters, mill powder system transformation, the development of effective measures to eliminate the run, risk, drip, leakage, and put into effect, the relevant departments to monitor and regularly check.
Enterprise environmental self-examination report 2
For the implementation of the "Gansu Provincial People's Government Office on the issuance of Gansu Province Environmental Protection Inspection Program notice" requirements, Jiuquan Rongda Auto Filling Co. p> (a) Business Overview
Established in January 20xx, with a registered capital of 2.5 million yuan, the legal representative is Yu Yiyang. The company covers an area of 7800 square meters, fixed assets of 15 million yuan, the existing 480 square meters of office building, a perfect l-cng filling station, mainly sales of automotive compressed natural gas, the annual retail volume of about 1500 tons, the company's existing staff of 16 people.
(2) Project Overview
(1) Our company's filling station is located in the south and facing the north, there is an entrance on the north side of the station area, and an exit on the east side of the station area, which is mainly divided into the process area, auxiliary area, filling area and other parts.
The process area is located in the south side of the station area, from east to west once arranged with a booster, lng liquid storage area, lng high-pressure piston pumps, water bath type reheating skid (air temperature type low pressure discharge heater, low pressure air temperature type gasifier, low pressure water bath type gasifier), regulator, lng high-pressure gasification skid (air temperature type high pressure gasifier, hot water circulating high-pressure ng heater, the order of the control panel, air temperature type high pressure), cng high-pressure discharge heater, cng high-pressure gasifier skid (air temperature type high pressure gasifier, hot water circulating high-pressure ng heater, the order of the control panel, the air temperature type high pressure) Discharge heater), cng gas storage well area.
The lng liquid storage area is equipped with a liquid pool and a fire breakwater, and all the equipment is arranged in the fire breakwater, which adopts a 1m-high non-combustible concrete solid enclosure, and the area inside the fire breakwater is 110 m. The equipment in the liquid storage area mainly consists of a 60 mlng vertical storage tank and a storage tank valve skid.
(2) Auxiliary area is located in the north side of the process area, 2-story station building, covers an area of 240.99m, 1 layer set up power distribution room, instrumentation room, office, business room, rest room, 2 layer set up rest room and office.
(3) The refueling area is located on the north side of the station area, with refueling canopy, 4 sets of double-gun refueling machine and 4 refueling islands.
(4) The transformer room is located on the southeast side of the process area, a single-story structure.
(5) The discharge pipe is located in the northeast corner of the process area.
(3) Production process and sewage nodes
l-cng refueling process is to transform the low temperature (-162 ℃ ~ -137 ℃), low-pressure (0.4 ~ 0.8mpa) lng into room temperature, high-pressure (25mpa) natural gas, and then compressed natural gas (cng) through the sequence of control panels to the storage facility or directly through the refueling machine refueling to the car.
Drainage in the station area adopts rain (sewage) diversion drainage system, sewage is collected through the pipeline network, and then discharged to the municipal sewage inspection wells after preliminary treatment in the septic tank in the station area. The rainwater is naturally discharged to the municipal rainwater network outside the station by using the vertical slope.
Domestic sewage mainly comes from the station sewage, domestic sewage is collected by indoor drainage pipe and discharged into the sewage pipe network of the station, and the sewage (wastewater) in the station area is preliminarily treated by the septic tank and then discharged to the municipal sewage pipe network.
The indoor drainage pipe (including the discharge pipe connected to the outdoor inspection well) is made of pvc-u drainage plastic pipe with bonded interface.
(D) Raw materials and products
The raw materials and products of this project, i.e., the Guanghui natural gas liquefaction plant located in the territory of Qiketai Town, Shanshan County, which is about 960 kilometers away from Jiuquan City, are transported to the station by lng tankers. Its natural gas physical parameters are as follows:
Liquefied natural gas technical indicators
The enterprise sells about 1,500 tons of natural gas per year, consumes about 60,000 degrees of electricity per year, and uses water, mainly domestic water, of about 900 tons per year, and centralized heating for office heating.
(E) the main production facilities
equipment summary table
(F) the main environmental protection facilities
project environmental protection facilities list
Second, the enterprise self-check situation
(A) the implementation of industrial policy this project by the Jiu Development and Reform Economy and Trade 20xx523 No. Jiuquan City Development and Reform Commission on June 21, 20xx approved the construction of the project, the enterprise process, technology, production facilities and products in line with the industrial structure adjustment catalog (20xx, 20xx version).
(B) the implementation of the environmental impact assessment system for construction projects
The EIA of the gas station project was commissioned by the Jiuquan Environmental Assessment Institute, and the Jiuquan Municipal Environmental Protection Bureau issued Jiu Environmental Protection No. 20xx8 on January 31, 20xx, the enterprise set up the environmental protection facilities to be constructed (see the list of the project's environmental protection facilities) in earnest, and I have seriously made corrective actions to implement the approval opinions. The company has seriously carried out the rectification and implementation.
(C) trial production, "three simultaneous" system and environmental acceptance of the completion of construction projects, the approval of the situation
The project in the specified period of time to put forward the end of the trial production period, according to the Provincial Development and Reform Commission, "on the province's gasoline (gas) station construction projects on the completion of the acceptance of the relevant issues of the notice" document spirit Municipal Development and Reform Commission on September 23, 20xx organized the relevant departments of my company's construction project for the completion of acceptance, through the acceptance of my company's project in line with the requirements of the construction. Construction project completion of the environmental acceptance of the temporary acceptance is not done.
(D) the main pollutants and characteristic pollutants to meet the emission standards
(E) environmental protection facilities and automatic monitoring equipment stable operation
The station's existing automated control system, including the centralized control system, emergency cut-off system, combustible gas alarm system, the station's video monitoring system; instrumentation settings, including instrumentation power supply, instrumentation selection and self-control instrumentation grounding.
1) automatic control system
① centralized control system
The function of the control system is to control the normal operation of the filling station equipment and monitoring of the operating parameters of the equipment, and in the event of equipment failure, automatic alarm or shutdown.
② emergency cut-off system
esd emergency stop button is set in the switchgear cabinet of the power distribution room. The filling station *** with four emergency shut-off valves, respectively, located in the lng tanks in and out of the liquid phase pipeline, air temperature type low-pressure lng heater, and high-pressure piston pumps, in order to prevent accidents in the filling station in a timely and effective cut off the source of the incoming gas; station natural gas pressurization, storage, refueling of various sections, respectively, set up to cut off the origin of the shut-off valves. The main cut-off valve is set on the main pipe between the gas storage well and the gasifier. Cut-off valves are provided at the outlet of each gas storage well. Gas storage wells into the gas pipeline is equipped with a safety valve.
③ Combustible gas alarm system
The project is set up in the supercharger above a combustible gas alarm probe; storage wells set up above a combustible gas alarm probe; in the refueling area of each gas dispenser configuration of a combustible gas alarm probe, *** equipped with four; lng high-pressure gasification skid ends each set up a combustible gas alarm probe, *** equipped with two. lng high-pressure piston pump skid set up a combustible gas alarm probe, *** equipped with two. lng high-pressure gasification skid set up a combustible gas alarm probe, *** equipped with two. lng high-pressure gasification skid set up a combustible gas alarm probe. 1 combustible gas alarm probe is set on the piston pump skid, 1 combustible gas alarm probe is set on the regulator, and 1 combustible gas alarm probe is set on the tank valve manifold skid. This time, 1 combustible gas detection probe is set in each of the filling area and submerged liquid pump area, and 1 set of combustible gas alarm device is installed in the control room. The combustible gas alarm probe is unified by the centralized alarm of the combustible gas alarm in the distribution room. If the leaked gas reaches a certain concentration (10% of the lower explosive limit of natural gas), the combustible gas alarm probe sends a signal to the gas alarm control device, which sends out an acoustic and visual alarm signal to remind the operator to handle the situation accordingly.
④ Video monitoring system
The gas station has 12 cameras, of which there are 4 in the refueling area, responsible for monitoring the refueling vehicles; 1 in the station entrance, responsible for monitoring the entry and exit of the vehicle; 1 unloading area, responsible for monitoring the unloading of the vehicle; 1 business office, responsible for monitoring the financial, business, etc., the station building 2, 1 on each floor, 1 set up in the process area, the South side There are two station houses, one on each floor, one in the process area, one outside the south wall, one in the gas storage well and one at the entrance of the process area.
2) Instrumentation
① automatic instrumentation power supply
Instrumentation control system power supply using external power supply.
② automatic instrumentation selection
Explosive hazardous areas of electrical equipment and lighting fixtures are selected exdiibt4 products. The protection level of all kinds of electrical equipment requires not less than ip54. local pressure measurement using stainless steel pressure gauge. Remote temperature measurement using a temperature transmitter for measurement, remote pressure measurement using a pressure transmitter for pressure measurement, the collected analog signal sent to the plc station control system for data processing and display, so as to carry out real-time control.
③ automatic instrumentation grounding
Lightning antistatic grounding, electrical protection grounding, instrumentation grounding using a joint grounding method, grounding resistance r ≤ 4 ohms. Instrumentation system grounding includes: protective grounding (the metal shell of the electrical instrumentation and automatic control equipment normal non-electrified metal parts), work grounding (containing the signal circuit grounding, shielding grounding and intrinsic safety grounding) and instrument lightning grounding. The above grounding are connected to the joint grounding pole, the signal circuit in the control room end of the ground.
(F) heavy metal pollution prevention and control
The nature of the industry, raw materials and auxiliary materials used in the production process and production processes, products do not involve heavy metal pollutants.
(VII) Hazardous waste and industrial solid waste treatment and disposal
The enterprise does not produce industrial solid waste and hazardous waste.
(viii) Implementation of sewage declaration and registration, sewage license and sewage payment The project has not carried out environmental protection acceptance, no sewage declaration and registration, and no sewage registration certificate.
(IX) on the drinking water source protection zones, nature reserves, national key ecological function zones and other environmentally sensitive areas of the impact of my company's location is far from the local drinking water source report protection zones, nature reserves, national key ecological function zones and other environmentally sensitive areas of the drinking water around the nature reserves, national key ecological function zones and other sensitive areas of the impact is not too great. My company's domestic sewage discharge is up to standard and most of the domestic sewage recycling irrigation plant green areas, in line with the requirements of the environmental impact assessment and approval
(X) environmental safety hazards prevention, environmental risk identification and emergency plan development After the project hazardous and harmful factors identified and analyzed, the project exists in the main hazardous and harmful factors is the fire, explosion, low-temperature frostbite, noise.
The east side of the station is Jiefang Road, the west side is Hanxin Science and Technology Co., Ltd, the south side is Dunhuang Seed Industry Group Jiuquan Regional Seed Company Processing Plant Warehouse, the northeast side is Kaisheng Investment Company, the north side is Yongxing Road and Lianhuo Expressway Viaduct, the east side of the overhead communication line, the overhead communication line is north-south direction, the station area has no overhead electric power lines, communication lines across the station site underground no cables and pipelines. The safety spacing between the facilities in the station and the buildings and structures outside the station meets the specification requirements.
If the station fire and explosion accident or pressure vessel, pressure pipeline explosion accident, emergency rescue is not started in time, the accident is not controlled in time so that out of control, it will be on the surrounding roads passing vehicles, pedestrians have a certain impact on the Dunhuang Seed Group Jiuquan Regional Seed Processing Plant Warehouse and the Kaisheng Investment Company to have a certain impact. This enterprise in the environmental safety hazards prevention, environmental risk does not exist above any risk, so did not develop environmental safety hazards prevention, environmental risk identification and emergency response plan.
(xi) Corporate environmental management and self-monitoring
The company has set up an environmental protection management organization, implemented the environmental protection responsibility system, formulated environmental protection rules and regulations and environmental protection facilities operating procedures, and established environmental protection facilities and production facilities operating accounts and file management.
(XII) the implementation of ecological environmental protection measures of the company's ecological environmental protection measures to meet the relevant national and local laws, regulations, policies, standards and requirements, in line with the relevant requirements of the environmental impact assessment of enterprise construction projects. Since the construction of the plant, trees have been planted around the plant and green plants and flowers have been planted in the open space within the plant, with a greening area of 1,400O, thus the ecological environment of the plant has been further improved.
(xiii) Nuclear and radiation
Our products and equipment are not nuclear and radiation, so there is no nuclear and radiation.
(xiv) Environmental information disclosure Our company does not disclose environmental information to the community.
Three problems
((a) Some of the enterprise's environmental protection accounts are not filled in on time, the file is incomplete.
(b) The enterprise is currently handling the completion of the environmental acceptance procedures.
(c) The company has formulated an emergency response plan for environmental emergencies, but it has not yet been filed.
(D) did not carry out sewage declaration, did not pay sewage charges on time, and did not apply for a sewage license.
(E) did not disclose environmental information to the community.
Fourth, corrective measures
(a) Before April 20xx as soon as possible to improve and perfect the environmental accounts.
(b) September 20xx as soon as possible before the completion of environmental acceptance procedures.
(C) in May 20xx before the emergency response file.
(D) actively prepare for the sewage license information, as soon as possible to apply for a sewage license.
(E) according to the provisions of the public enterprise environmental information.
Jiuquan Rongda Auto Filling Co., Ltd (seal) January 13, 2015 Enterprise Self-examination Filing Form Filling Unit: Jiuquan Rongda Auto Filling Co. In line with national industrial policy" and other columns only need to fill in the "Yes" or "No", if any other situation, you can add a separate page or in the self-examination report to be explained.
2, this table needs to be stamped with the official cover of the enterprise unit before the self-inspection report can be reported together.
Enterprise environmental self-examination report 3
Since XX years, in the district government's correct leadership, the departments and townships of the close cooperation and the city information office under the guidance of the strong, the district government Web site is running normally, maintenance and updating in a timely manner to promote the public disclosure of government information to facilitate the public to do business, to promote the transformation of government functions and other aspects of the contribution, the influence of the increasingly enhanced. Now will be against the provincial and municipal assessment indicators of the `self-inspection report as follows:
First, the main work of the year
(a) actively promote the disclosure of government information. In accordance with the requirements of the "Regulations on the Disclosure of Government Information", actively promote the disclosure of government information. Should take the initiative to publicize the regulations and documents, planning and programming, government documents, personnel appointments and dismissals, statistical information and other information, adhere to the release at any time to update, the year **** release of various types of government information more than 180. In the bulletin board released more than 40 pieces of information on various types of project tenders, personnel announcements, etc., reproduced or released 15 pieces of information on extreme weather, epidemic diseases and other public **** event warning. Information related to education, social security, employment, medical care and other relevant information concerning the people's livelihood was published in a timely manner. The establishment of a government information disclosure column, providing relevant forms to download, smooth the channels for the public to request the government to disclose specified information.
(ii) Accelerate the construction of the government system website. At the beginning of the year, by the district government leaders in charge of the economic work conference on the construction of the government system website was emphasized, and then issued a special "on further strengthening the construction of the government system website notice" on the construction of the departments, townships and townships office website, the district government website content protection, website construction and maintenance of the performance appraisal and other work to do the specific requirements. Due to the impact of the reform of the district government and township institutions, the progress is not ideal, the organization of the year's new departments, townships, 15 websites, including the Civil Affairs Bureau, Personnel Bureau, Audit Bureau, Jianmin Township, Zhangtan Township, and other websites are becoming more mature and standardized, and has become an important complementary platform for the district government website to promote the public disclosure of government information.
(C) efforts to promote online services. Requirements for administrative approval authority of the department, in accordance with the unified form and column published service guide, administrative approval based on and process, provide relevant forms to download, publish the telephone number to report complaints, standardize the administrative approval matters of the department of service work. By the District Government Legislative Affairs Office in the region to carry out law enforcement basis for cleaning up, and in the government network published a classification table of administrative law enforcement responsibilities of the departments, so that the general public to understand the law enforcement basis of the departments, law enforcement procedures, to facilitate public and social supervision. Actively carry out the interaction between the government and the people, timely acceptance of netizens consulting complaints, on a certain aspect of the work of the timely collection of public opinion, do a good job in the maintenance and management of the district governor's mailbox, supervise the host department to reply in a timely manner.
(D) timely update of dynamic political news. News Center throughout the year to publish updated political news, leadership activities, important work progress, departmental work dynamics of more than 2600. Especially during the 7.18 heavy rainfall floods, in the district without newspapers, television and other media, consciously shoulder the flood relief publicity and reporting work heavy responsibility, in nearly a month's time, the daily average of writing, editing and distribution of more than 30 articles, published more than 150 photos of flooding, printing relief newsletter 60 issues, in the first time to reflect the disaster and relief progress in the region, and with the District Propaganda Department vigorously Cooperation, the launch of Yang Zongxing, Wasp and a number of flood relief advanced figures.
(E) consciously serve the region's key work. This year, according to the requirements of the region's key work, has opened in the district government website to study and practice the scientific concept of development, the economic census column, the census column, the first to create a good column, double column, military column, the Xicha Hui column, flood relief, learning Yang Zongxing and other 9 columns, open single work-related documents, dynamic information, the columns cumulative total of more than 1,500 pieces of articles, the systematic Publicize the specific work and promote the smooth implementation of the work. At the same time, but also with the cooperation of the District Cultural Federation and other units, opened a video photography contest column.
(F) highlight the website security management. At the beginning of the year, the provincial Department of Industry and Information Technology detected the existence of many security holes in the district government website, we timely request the telecommunications company to be resolved, and the establishment of a regular monitoring system, once the loopholes in a timely manner to repair and improve. At the same time, we have improved five systems, including "Emergency Plan for Website Security Emergencies", "Website Security Management System", "Website Management System", "Information Center Server Room Management System", etc., strengthened the internal management, and arranged for people to take turns to be on duty during sensitive periods. Over the past year, the website has not been subjected to any attacks, there has been no inaccessibility throughout the year, and there has been no security problems such as web page mounting, web page tampering, and so on.
Second, there are problems and deficiencies
First, the disclosure of information is not comprehensive and systematic. Part of the information that should be disclosed, due to the relevant units of the relevant work is not standardized, failed to timely disclosure, such as government procurement information. According to the application for disclosure, although the channel is open, but there has been no public submission of applications.
Secondly, the promotion of online business is not enough. At present, due to the function of the website and the relevant departments, the masses of the habit of doing things, etc., online business is still stuck in the provision of business services guide, form download, online approval, acceptance, etc. has not yet entered the substantive stage.
Third, the interaction between the government and the people still need to work. Due to the large number of letters and complaints in our region, the district mayor's mailbox for the District Bureau of Letters and Visits has a large workload, coupled with some of the letters reflecting the problems of the more significant and complex momentary difficult to reply, the response is not timely enough, there is a backlog of letters phenomenon. Fourth, the website design is not standardized enough. Part of the columns set up to repeat, the application of the function is not strong, there are also difficult to change the home page itself and other technical problems.
Third, the next step in the rectification measures
In view of the problems and provincial and municipal norms, we have started in July to build a new website, the purchase of firewalls, servers and other equipment, redecoration of the server room. Due to various reasons, the progress of website construction is not satisfactory enough, the new website will be online at the end of December to run, some specific problems can be solved. After the operation of the new website, we will strictly in accordance with the provincial and municipal norms and requirements, and further strengthen the contact with the functional departments, do a good job of maintaining and updating the content, so that the district government website has really become a platform for the promotion of government information disclosure, to facilitate the public to do business in the window, the external publicity carriers.
Enterprise environmental self-examination report 4In the city Environmental Protection Bureau of the leadership at all levels of strong support, our company through in-depth study, always adhere to the work of energy conservation and emission reduction does not, and effectively strengthen the environmental protection facilities to put into operation the rate of strengthening the responsibility for environmental protection. Now the 20xx enterprise environmental self-examination report is as follows:
After the restructuring, due to various reasons, our annual production and market share have decreased, in the process of production and transportation, sewage can be reused through the treatment system, the main pollutants produced are dust and noise. Concrete mixing plant has a good environmental protection function, in the process of machine operation, powder manipulation are carried out in the full closure system, powder tanks using high-efficiency dust collector/fog spraying and other methods to greatly reduce the dust pollution of the environment, while the concrete mixing plant on the exhaust of the pneumatic system and the unloading equipment are used to muffle the device to effectively reduce the noise pollution.
Our company in the main channel and the material field supporting the sprinkler system, to reduce the weather and vehicle unloading, transportation process of dust emissions. In practice, strong management measures have been formulated to strengthen the staff's job responsibilities, and the amount of water sprayed and the focus of spraying have been adjusted according to the specific local meteorological conditions in order to achieve the effect of dust suppression.
Through the disdainful efforts, has gradually built into a better environmental protection facilities of the enterprise. In the future, our company will continue to implement environmental protection and energy saving production and emissions, for energy saving and emission reduction, green environmental protection to make greater contributions.
xxx Co., Ltd.
April 28, 20xx
Enterprise environmental self-inspection report 5The enterprise strictly enforces the "Printing Industry Management Regulations" and "Printed Materials Undertake Printing Management Provisions", and strictly enforces the relevant laws, regulations and rules and consciously maintains a good image of the enterprise. The enterprise was founded in 2XXX, plant construction area of XXX square meters, registered capital of XXX million yuan, XX employees, the introduction of imported machines XX, domestic machines XX, with more than XX sets of the last ten years of production and is not included in the "elimination of backward production capacity, processes and products of the directory" of the automatic quadruple offset printing printing equipment.
The enterprise operates well, the total industrial output value of XXX million yuan in 20xx, the tax payment reaches XXX million yuan, and the total profit is negative XXX million yuan. Enterprises in accordance with the regulations to carry out the company's business, there are sound printing verification, registration, storage, delivery, destruction and other business management, financial management system, XXXX data has been submitted on time, the enterprise in the audit of the registration period, no violations, has not been subject to any punishment by the administrative organs.
XXX Limited Company
February 10, 20xx
;