Corporate Flood Safety Notification (General 6)
In life, we may use the notification, the notification can be divided into different categories according to the different scope of application. So the question is, how to write a proper notice? The following is my collection of notices of corporate flood safety (General 6), welcome to read, I hope you will like it.
Enterprise flood safety notice 1
The units, the entire field of cadres and workers and their families:
The rainy season is approaching, in order to effectively do a good job of flood prevention and control and geological disaster prevention and control, to maintain and safeguard the whole field of the people's lives and properties, combined with the actual situation of the field, the experimental field to develop the "China Agricultural University Teaching Experimental Field 20xx Flood Control Work Plan," which will be issued now. The plan is issued, please follow the implementation.
After receiving this notice, all units must seriously grasp the flood safety hazards of mapping and rectification; improve all types of flood control plans and work programs; do a good job in key areas of geologic hazards defense; do a good job in the family area, especially in the cottage population living areas, such as the key parts of the precautionary measures; do a good job in the reserve of emergency supplies and emergency team construction work, to further enhance the flood control emergency response capabilities; once found The first step is to make sure that you have a good understanding of the situation, so that you can make sure that you have a good understanding of the situation, so that you can make sure that you have a good understanding of the situation, so that you can make sure that you have a good understanding of the situation, so that you can make sure that you have a good understanding of the situation.
All cadres, workers and their families in the rainy season, it is recommended to minimize the outing, and actively take protective measures to ensure that daily production, life and personal travel safety; pay attention to slippery roads, to ensure traffic safety; living in the bungalows of the workers and their families to do a good job of housing safety precautions; travel in the event of thunderstorms pay attention to the lightning lightning protection against electricity; go out and pay attention to the feet, found that the rain hit the swirl of places, please take a detour; try to walk around; the rain hit the swirl, please take a detour. When you go out, please pay attention to your feet, find the rain swirling place, please take a detour; try not to get close to the street lamp poles, to prevent leakage of electricity, electrocution accidents.
Notice of enterprise flood safety 2
The subsidiaries, project managers, company departments and offices:
Recent sustained widespread rainfall weather triggered flooding in many places, mudslides and other natural disasters, a serious threat to the construction site of the project, the safety of personnel and equipment. July 4, due to the strong rainfall caused by landslides caused by the Xiluodu Hydropower Station Leibo reservoir area road reconstruction project construction of the third section of the project. Bidding Section Project one person died. In order to put an end to such safety accidents, to protect the safety of people and property, now on the strengthening of the construction site flood prevention and flood control safety work notice as follows:
First, strengthen the leadership, strengthen the awareness of preventive measures.
The sub-branches, project managers construction head (project manager), chief engineer and security department must attach great importance to flood prevention, flood control, safety work. To firmly establish the idea of preparedness, timely study and solve the project, the region's flood prevention and flood control work in the problem, targeted to improve the flood prevention and flood control system, the establishment of an inspection mechanism, the tunnel mouth, high roadbed slope, high and deep road moat, half-filled half-dug embankment, deep foundation pit, bridge waterfront area equipment, materials, storage, construction sites and other key departments, key parts of the key inspection, the drainage is not smooth, Hidden dangers such as changes in the mountain, protrusions, loose rocks, etc. should be arranged immediately to detect and remove hidden dangers in time. To carry out flood control and flood emergency rescue drills and publicity and education work, strengthen the staff awareness of production safety, to ensure that the flood control and flood prevention measures to the implementation of the solid work of flood control, flood control and safety.
Second, sound institutions, the implementation of flood control responsibilities.
The company set up a "Road Tunnel Group Engineering Co., Ltd. flood control, flood safety leading group", by the executive vice president of Jiang Wan Gang as team leader, administrative manager Zeng Minying, manager of the Department of Operations and Development Li Xiaobin, Manager of the Department of Finance and Assets, Zhu Ling, Ministry of Engineering, Chen Xi-han as a member of the team, set up an office at the project management (engineering) Department. Project Management (Engineering) Department. Chen Xihan is responsible for the daily work.
The subsidiaries, project managers must establish a leading group for flood control and flood prevention work, with the main person in charge of the project as the leader, the chief engineer, the person in charge of production as the deputy leader, the heads of departments and team leaders as members. The main responsibilities are: to understand the weather forecast, to take effective measures to deal with floods, geological disasters; to develop a flood control and flood management system and emergency rescue plan, in the event of a disaster, the organization and implementation of rescue and relief, and quickly report to the head office and the local government.
Third, eliminate hidden dangers and establish an emergency mechanism:
All construction departments should strictly follow the requirements of the "Construction Law", "Construction Safety Inspection Standards" and other laws and regulations and standards, according to the weather and climate change, and reasonably arrange the construction schedule and work processes to ensure construction safety. Supervision and inspection of major, major, and general sources of danger within the jurisdiction, especially explosive depots, oil depots, high-altitude operations, high slopes, deep foundation pits and other major sources of danger to strengthen the monitoring and observation, strict implementation of the special program and operating procedures, if necessary, assigning a person on duty, the establishment of a comprehensive `dangerous sources of observation records, to prevent injuries from explosions, fires, falling from heights, burials, and strikes against objects. Conduct hidden danger investigation on temporary power lines, mixing stations, prefabrication yards, steel processing yards, lifting operations and other large sources of danger to prevent lightning, electric shock and other injuries, and urge thorough rectification of hidden dangers without leaving any dead ends. Operators and mechanical equipment, transportation equipment and other general sources of risk to strengthen management, improve personnel and equipment management system, is strictly prohibited to go down to the river to bathe, laundry, play and engage in other operations to prevent drowning, property damage and other injuries.
Fourth, the establishment of emergency rescue mechanism, to deal with emergencies:
The sub-branches, project managers flood control work leading group should be set up to prevent flooding emergency rescue mechanism, to develop and improve the flood control emergency rescue plan. To regularly carry out the plan ` seminars, revisions, drills and professional training for rescue personnel; the implementation of rescue teams and materials, such as sacks, shovels, life jackets, lifebuoys, safety ropes, safety belts, etc.; should be guaranteed at all times to ensure the smooth flow of information to improve the ability to combat, once the danger of the shortest possible time quickly to the scene, the scientific organization of the rescue to prevent the effective rescue in a timely manner, infallible.
V. Coordination and communication to ensure safe production:
Before the flood season, each branch, the project manager should strengthen the coordination and communication with the government, the owner, the supervision department, obedience to the management, unified command; keep in touch with the local firefighting, public security, medical, meteorological and other departments and the implementation of people responsible for contact and communication, ensure that The rescue and relief work is accurate, timely and smooth, strengthen the site safety management, to prevent the occurrence of nuisance disasters.
Notice of enterprise flood safety 3Companies, departments and offices:
20xx flood season has arrived, in order to ensure that the group mining enterprises, ground enterprises and other units of the safety of flood, by the group leadership research, is now on the group's 20xx flood safety work arrangements and deployment are as follows:
First, set up a leading group of flood prevention and flood control. Each unit hand for the first responsible person, must attach great importance to the flood control work, the formation of flood rescue commando, must be a sound organization, responsibilities, tasks clear, command and order. The key positions of the duty officer's phone to stay open 24 hours, pay attention to watch the weather forecast, found problems reported in a timely manner, and properly dealt with, especially in the presence of gusty winds, heavy rain, high temperatures and other unusual weather, can do a good job of preventing and combating disasters, to ensure that the Group's safe flooding.
Second, the development of emergency plans for flood control. Each unit should be based on the previous year's water conditions and flood control experience, combined with the actual production this year, the development of 20xx flood emergency plan, the careful deployment of the work of the flood season, to do early planning, early arrangements, early preparation, to ensure that nothing goes wrong.
Third, the implementation of flood control materials. Each unit should be prepared to wire, woven bags, shovels, pouting, raincoats, rain shoes, flashlights and other materials, so as to be prepared.
Enterprise flood safety notice 4The construction project department:
According to the latest weather forecast issued by the Inner Mongolia Meteorological Bureau, the city area of heavy rain, heavy rainstorms will soon come, very easy to cause natural disasters, anti-Taiwan flood prevention notice. In order to ensure the absolute safety of the personnel and property of my project manager department, to ensure the safety and smooth progress of the project, so that the project smoothly through the flood season, to minimize the impact of the rainy season on the construction. According to the higher authorities' . Requirements, the project manager is required to do a good job during the rainy season flood control, flood control work to make specific arrangements for the layout:
a. Requirements for the project department to set up a flood control and flood control leading group, responsible for organizing the overall work of the flood control and flood control
Flood control and flood control command leading group office is located in the Ministry of Project Department of Safety, the Department of Safety safety officer is responsible for the collection of daily Weather forecast information and notify the flood control team members of the weather forecast. When the higher authorities concerned issued flood warning information, coordinate the relevant departments and units to do a good job of flood warning response, the implementation of the higher leadership departments related to flood control emergency measures.
Second, highlight the focus, increase the efforts to remove the danger
Requirements of the construction project must attach great importance to the strict strengthening of the preventive work, we must quickly on the easy to disaster point by point inspection, the site construction site to map out the situation clearly, with a focus on risk removal, risk removal work. To focus on:
1, large machinery and equipment parking location to be reinforced;
2, the site of the drainage system dredging;
3, the site of the material, temporary electricity to be covered and so on.
three, strengthen the responsibility, adhere to the duty inspection system. The project department flood control leadership
The group should strictly implement the day and night duty system, in the rainy season flood period to adhere to the 24-hour site inspection duty system, the team members should stick to their posts, shall not leave the post without authorization, at any time to maintain a vigilant state of mind, observation to be careful, especially on the dangerous sections to pay close attention to the discovery of the possible danger to immediately report to the project management department. For extreme weather changes, do a good job "before the rain, rain, rain," check the work, once a dangerous situation, quickly start the emergency plan, immediately organize rescue rescue, to prevent the expansion of the accident, to minimize the loss, to ensure the personal safety of the personnel and the safety of property.
Four, set up flood control facilities, ready for flood emergency supplies
The project department to ensure that the flood control work smoothly under the premise of prevention, to do prevention-oriented, ready for adequate flood control materials and equipment, to ensure that the timely supply of flood control materials in place, the flood control of the entire staff to carry out flood safety education, so as to make it aware of the importance of the work of flood control and the importance of the work of flood control, to ensure that the flood control of the project department. Flood control and flood prevention work is important and harmful.
I hope that the construction project department to receive this notice, immediately take action to do a good job of flood prevention, flood control work and put into practice.
Notice of enterprise flood safety 5
The project supervision agencies and business department:
According to the Shuozhou City Weather Station forecast, July 22 to July 26, most of the city has rainfall, locally there is heavy rainfall. In accordance with the requirements of the Municipal Construction Bureau, the project supervision agencies and the Ministry of Operations should be combined with the actual situation of the site arrangements to supervise the construction unit to do a good job in the construction site safety and flood prevention work, the relevant matters are now notified as follows:
First, urge the construction unit to strictly implement the duty system, strengthen the emergency preparedness, improve the emergency plan, the implementation of emergency supplies and equipment.
Second, for the deep foundation pit and high support touch and other dangerous sub-parts of the project should be checked one by one to ensure that the project does not have any accident.
Third, lightning grounding facilities devices are in place.
Fourth, for lifting operations, work at height, edge work, earthwork should have sufficient safety facilities to ensure that the work, such as any safety and quality hazards, immediately stop, if necessary, require the suspension of work.
V. Check the construction site drainage facilities, equipment, personnel are properly arranged.
For the above points of each project supervision organization supervisors immediately implement, and guarantee twenty-four communication, to ensure the safety of life and property.
Notice of enterprise flood safety 6
Each city (state) Agriculture (agriculture and animal husbandry, animal husbandry, animal husbandry) Bureau (Committee):
Since the flood, many places in our province have occurred varying degrees of flooding, especially in mountainous areas around the basin, earthquake-stricken areas are prone to secondary disasters. 24, Aba Prefecture, Maoshan County, folding the town of new mill village of the sudden collapse of a mountain high level, to all parts of the work of flood mitigation has sounded the Alarm bells. In this regard, the party group of the Office attaches great importance to all places to pay close attention to the rain, flood, disaster and people's situation, and do a good job in a timely manner in disaster prevention and relief and disaster reporting. Now on the relevant matters are notified as follows:
First, the full implementation of flood control and disaster mitigation responsibilities
Each city (state) agricultural departments should attach great importance to the flood control and disaster mitigation work to re-deploy and then implement the responsibility of the implementation of the layers. To check again the implementation of flood control and drought responsibilities, emergency plan development and emergency measures to prepare, to ensure that the implementation of the disaster prevention measures in place. To further mobilize the mobilization, strengthen the emergency duty, in the event of a disaster, to be the first time to carry out disaster relief work.
Two, stepped up to carry out flood guidance services
To guide the flood-prone areas to do a good job of planting structure adjustment, the implementation of disaster prevention and mitigation measures; stepped up to check the facilities of the agricultural, livestock and poultry sheds again check repair, to ensure that the rain of the farms, the sewage drainage line smooth, to guide the scale of the farms to deal with manure in a timely manner to avoid the spread of pollution; to guide the strengthening of relief work in the area of the farms to avoid the spread of pollution. The company's main goal is to provide the best possible service to its customers, and to provide the best possible service to its customers in the future.
Three, strengthen the disaster information scheduling and reporting
Strengthen the coordination with the meteorological department, forwarding meteorological warning information, do a good job of prevention. Adhere to the combination of daily scheduling and emergency scheduling, and actively do a good job of early warning and emergency response, in accordance with the requirements of the "Natural Disasters Express" and the provisions of the statute of limitations, the content of the norms, the collection and organization of the disaster information, so that before the disaster there is a pre-disaster, the first time after the disaster there is a response to the end of the production of the disaster relief has been summed up. Strengthen the communication with the local defense finger, emergency, disaster reduction and other departments, the implementation of departmental linkage and regional collaboration mechanism, adhere to the unified leadership, and grasp the joint consultation, information **** enjoy the work.
Fourth, make every effort to do a good job of agricultural production recovery
Effectively strengthen the prevention and control of animal diseases, do a good job of immunization and disinfection and harmless treatment of dead animals and poultry, and timely disposal of outbreaks of epidemics, and at the same time, to strengthen the circulation of quarantine supervision, to prevent the inflow of sick and dead animals and poultry into the market. Actively coordinate with the relevant departments to ensure the smooth transfer of agricultural materials and transportation of agricultural products. Actively coordinate with the agricultural insurance sector, as soon as possible to verify the damage, the implementation of insurance compensation. Organize and mobilize the masses to do a good job of production self-help, minimize disaster losses, and help restore and rebuild.
Please cities (states) according to the requirements of the annex, the summary of the report since June floods occurred, the disaster report must contain the process of disaster, disaster damage, production self-help measures taken and the difficulties of the problem, on June 26 (Monday) 12:00 am before the contact person email.
;