What are the required completion documents for strong electricity?

1. Materials and equipment certificates and on-site inspection records

2. Pre-inspection records

3. Concealed project acceptance records

4. Insulated wire test records

5. Equipment installation, debugging, testing and trial operation records

6. Construction organization design

7. Technical disclosure

p>

8. Project quality inspection and assessment

9. Self- and mutual inspection records

10. Design changes and negotiation records

11. As-built drawings