Generic anti typhoon emergency plan program (Selected 4)

The typhoon is a meteorological disaster, we have to do a good job of the emergency plan to prevent typhoons, at any time to do a good job of emergency rescue work, how to write a plan to prevent typhoons? The following is a "generic anti-typhoon emergency plan program (selected 4)", for reference only, welcome to read this article.

Part I: generic anti-typhoon emergency plan program

In order to be able to timely, efficient and orderly prevention of typhoons, to protect the lives of teachers and students in our school and the school public **** property suffered no loss, specially formulated our school's "school anti-typhoon accident emergency program". Follow the instructions of the documents of the relevant departments at the higher level, people-oriented, concerned about life, prevent accidents, ensure the safety of teachers and students, reduce property losses.

I. School typhoon prevention accident command structure:

1, the leadership group

Leader:

Group leader:

Group member:

2, stay in the prevention of work group

Leader:

Deputy Leader:

Group member:

4, monitoring

5, anti-typhoon rescue members: all teachers

6, duty phone:

Second, specific measures

(a) before the passage of the typhoon

1, received the notice of the relevant departments of the higher authorities on the arrival of the typhoon, typhoon leading group members focused back to the school to arrange for the passage of the typhoon leaders Duty, the arrangement of typhoon prevention of the preparatory work. (Responsible person: xxx)

2, the organization of typhoon emergency response team members to comprehensively check the school building, field and room safety. (Responsible person: xxx)

3, do a good job of cleaning up the campus drainage system, to ensure that the school drainage system is smooth.

4, organize teachers and students to close the doors and windows of classrooms, offices, various teaching rooms, teachers' rooms, etc.. Clean up all the clutter that may be a potential safety hazard when the typhoon passes through. (Responsible person: xxx)

5, the organization of typhoon emergency response team members to inspect the campus, strengthen the inspection of the school wires, gas, and the above facilities to do a good job of typhoon prevention of all preventive work. (Responsible person: xxx)

(ii) When the typhoon passes through

1. Throughout the time of the typhoon, the school staff on duty should constantly patrol the campus, and if they find any danger, they will immediately report it to the supervisor on duty and the leader of the unit to activate the emergency procedures.

2. Organize teachers to stay at the school and stabilize their emotions to prevent accidents.

3, in the premise of their own safety, the organization of typhoon emergency response team members to strengthen the campus inspection, especially to strengthen the school's water and electricity facilities, drainage system inspection. The emergence of emergencies active safety hazards, immediately reported to the leading group of typhoon prevention. The leading group to study whether to report to the higher authorities live organization of risk management.

4, do a good job of school safety and defense, do a good job of anti-theft, waterproof work.

5, if the building in the typhoon waterproof tilt, cracking:

(1) the site command should immediately organize emergency personnel to guide teachers and students to evacuate the scene, evacuate to a safe area, while cutting off the school power supply.

(2) If someone is injured, we should rescue them in time, and the emergency situation should be reported to 120 to send to the hospital.

(3) set up a cordon around the dangerous buildings, row specialists to closely observe the building situation.

6, the school will be injured, property damage and serious accidents and hidden dangers of the situation reported to the superiors in a timely manner.

(C) after the typhoon

Timely organization of school workers on the campus in front of the inspection, found that the problem of timely maintenance live report to the higher authorities, as soon as possible to restore normal teaching order.

Part II: generic typhoon emergency plan program

To do a good job of typhoon prevention, now the "Grand Hotel Typhoon Emergency Plan" re-revised issued, please follow the implementation of the hotel.

First, the organization and responsibilities

The hotel set up a flood and typhoon emergency command, the typhoon came when the command of the various organizations members must immediately do a good job in the hotel flood and typhoon response and duty. The organization is as follows:

Commander-in-chief: hotel executive general manager

Deputy commander-in-chief: the hotel in charge of security work of the chief assistant

Member units: guest rooms, catering, front office, engineering, security, finance

Second, typhoon procedures

(a) the typhoon before the self-examination Preparation

1, the front office: the collection of the main entrance banner and the main entrance of the lanterns and other decorations and POP notice boards; lobby or elevator entrance placed typhoon information notice boards, and ready to typhoon reminder card to the Department of Rooms with the room; ready to prepare umbrellas and rain gear, the front office of the staff should be aware of the typhoon information, and timely answers to guest inquiries, ready to the front desk emergency lighting, the lobby assistant should be scheduled in the lobby The company's main goal is to ensure the normal business order of the front office by focusing on the customer's inquiries and reporting the situation at the door and lobby.

2, Rooms Department, Food and Beverage Department, Finance Department: check the closure of each room, box, aisle and hallway doors and windows; do a good job on the guest of the typhoon notification Rooms Department should be the typhoon reminder card with the room; prepare emergency lighting;

3, switchboard: responsible for understanding the typhoon situation in a timely manner to report to the leadership of the hotel and the relevant departments responsible for the preparations for the emergency lighting, walkie-talkie, and to check the switchboard Backup power supply is normal operation, and under the guidance of the department manager to do a good job in the power outage emergency services, and do a good job of the guest's inquiry service.

4, each department should be prepared 1 day in advance to report the loss of fabrics, in order to emergency use.

5, by the Engineering Department of the hotel perimeter, platforms, neon lights, billboards, satellite receivers, business departments and tenants of the doors and windows of a comprehensive inspection with wire, rope, stakes and other reinforcement of the unsound suspension should be temporarily removed. Check the underground electric room engine room and other important parts, do a good job of reinforcing the hotel door, and cut off the possibility of short-circuit triggered a fire in the circuit, the pool should be filled with water to ensure that the hotel's normal supply of water, electricity, gas, ready to prepare enough sandbags.

6, the general office is responsible for the typhoon information conveyed to all employees in all departments, the arrangement of all department heads to stay on duty.

7, the security department notified the dormitory security guards to prepare for duty, and with the engineering department to check the hotel periphery, roof and other key parts of the sewers, guttering is smooth, prepare lighting appliances and rain shoes and raincoats, safety helmets, flashlights, emergency lights, and so on.

(ii) review: by the General Office, Engineering Department, the head of the Security Department in accordance with the above terms of the preparation of each department to review.

(C) the wind is strong when the emergency procedures should be initiated:

1, the security department, the head of the engineering department should stay in the hotel at any time to deal with unexpected danger, to ensure that enough manpower and material resources to do a good job of repair and remedial work.

2, guest rooms, private rooms, cloth, liquor, food warehouse if there is water seepage, the department should immediately transfer the contents of the room to a safe place, the Ministry of Engineering to do a good job of plugging the leakage and drainage work.

3, the front door of the rain may backflow into the lobby, the security department, the engineering department will sandbags piled up at the door to prevent the inflow of PA class is responsible for additional manpower to remove the water.

4, the back door of the rain may backflow into the staff elevator, the security department, the engineering department will sandbags piled up in the back door to prevent inflow, the back door post security guards are responsible for the removal of water, such as rain has been to the elevator backflow, the engineering department should immediately control the elevator in the elevator above the floor of the 1F, prohibited to allow the elevator to run to the -1F - 2F.

5, the wind When the wind is very strong, the front door and the back door should be reinforced with wooden plugs and boards to prevent the glass door from being blown by the wind, and the reinforcement should be appropriate to keep part of the glass door open to reduce the resistance of the wind to the glass door, and the glass of the front door should be watched by the baggage handlers and the foreman of the security department*** with the same watchman. The back door glass is guarded by the security guard at the back door.

6, when the wind is very strong, the gate post security guards baggage handlers should pay attention to falling objects and guide the guest vehicles parked in the underground garage, if necessary, wear a helmet, the front office should be placed on the front desk desk lamps, flower pots, etc. put away, so as not to be blown over.

7, if there is water in the elevator, the engineering department should immediately start the drainage system to remove the water, in order to avoid if the wind is strong, resulting in the passenger elevator can not run, the restaurant screen should be pushed to the elevator entrance to cover.

8, when encountering a power outage, the Engineering Department immediately contacted the property office to generate power to restore lighting. The Security Department maintains the hotel security order during a power outage. When the power outage restaurant cashier by the restaurant management personnel responsible for in place to guard, the main desk cashier by the Security Department front door post and 02 or 01 guard. Lobby assistant, 01, 02 should do a good job of passenger elevator service, check whether the guests were off the ladder, do a good job of being off the passenger elevator guests to appease the work of the floor workers and managers of various departments should be dispersed to the various floors, restaurants to guests to do a good job of explaining and appeasing the work.

9, gutter blockage, by the Ministry of Engineering, the Ministry of Security *** with the people to be sent to unblocking, unblocking personnel should pay attention to their own safety, must wear a helmet, if necessary, should be tied to the safety rope, by two people a front and a back *** with the operation. Attention should be paid to the roof equipment layer of electrical equipment whether there is a leakage phenomenon.

10, the wind is very large, the office should be responsible for notifying the dormitory employees are prohibited from going out, in the store outside of the staff should be arranged to stay in the hotel, the office and the departments responsible for the office should be dissuaded from leaving work employees are not allowed to leave the hotel, the office should be a good arrangement for food and accommodation for the employees who are stranded.

11, the switchboard is responsible for understanding through the TV, timely report to the head of each department of the typhoon situation, such as airports, highways, bridges closed information should be reported to the front office in a timely manner, the front office should be timely to the guests of the hotel notice.

12, the typhoon larger hotel executive general manager, engineering manager, security manager, should stay in the hotel to make emergency preparations, other department managers whether to stay in the hotel should be based on the hotel arrangements, such as leaving the hotel should be reported to the hotel executive for approval.

(d) after the typhoon has caused losses in the hotel, the departments should be summarized within two days to report losses.

In order to do a good job of the hotel's typhoon prevention work, to ensure that the occurrence of typhoons during the hotel's various departments have a plan, orderly arrangements for typhoon prevention work, so that the hotel losses to a minimum, the development of the hotel's typhoon prevention work plan.

First, the organization and command

The hotel set up a typhoon headquarters, responsible for the typhoon during the command and scheduling work.

1, the General Command Organization:

Commander-in-chief: General Manager

Deputy Commander-in-chief: Deputy General Manager, Assistant General Manager

Members: Administration Office Manager, Finance Manager, Sales Manager, Housing Manager, Food and Beverage Manager, Engineering Manager, Lobby Assistant

2, the command center workstation: located in the Lobby Assistant reception, the departments in the command center workstation to receive work. Departments in the command center workstation to receive work orders and report work progress status.

3, communication requirements: the command center members must ensure that communication at all times, at least carry a cell phone or walkie-talkie 1 (in advance enough spare batteries).

Second, typhoon purposes and tasks

All employees do their best to protect guests, employees and hotel property safety.

Third, the division of labor

Typhoon prevention work by the typhoon headquarters unified command, the implementation of sub-departmental responsibility approach. The specific responsibilities of the relevant departments are divided as follows:

(a) the departments **** the requirements of the work

1, received by the hotel to start the typhoon plan instructions, held an emergency meeting of the department, notification of the typhoon information, conveyed to the hotel on the typhoon prevention of the work of the deployment of the Department of the work of the arrangement of the specific requirements of the work of the Department.

2, during the typhoon prevention hotel employees must unconditionally return to standby, the obligation to participate in the typhoon prevention, and listen to the unified command to implement the work of the task, the unexplained absence, disobedience to the typhoon prevention work arrangements or negligence of personnel, depending on its unilateral termination of the labor contract on the treatment. The situation is serious, according to 1 relevant laws and regulations to pursue responsibility.

3, the staff dormitory accommodation staff must be concentrated to the hotel and return to standby, the dormitory only stay administrator on duty, not to stay staff, otherwise, the consequences of accidents.

4, require employees to pay attention to personal safety during the typhoon, take personal precautions to avoid other accidents.

5, after the typhoon to restore self-help aftermath of the work, all departments must listen to the hotel unified transfer arrangements, proactive interdepartmental work with the fastest time to restore business operations.

(B) Administration Office

1, the typhoon before the preparatory work:

(1) spare sandbags more than 600, and enough rope.

(2) Arrangements for the relevant departments to participate in the uniform loading sandbags, and ready to put the use of the area.

(3) Arrange the driver to check the water, oil, vehicle performance in advance, and find timely solutions to problems.

(4) Staff restaurant in advance to check the operation of natural gas pipeline equipment and prepare a variety of meal supplies (rice, oil, vegetables, etc.).

(5) to the staff dormitory balcony floor drain dredging, and prepare flashlights. In addition, dial off the various electrical plugs to lift the existence of hidden dangers.

(6) According to the procurement needs of various departments, do a good job in the purchase of supplies to prevent Taiwan.

(7) is responsible for the administrative fleet of vehicles scheduling, arranging for emergency ambulance vehicles, contacting medical ambulance organizations, and preparing emergency medical drugs.

(8) General warehouse carefully check the warehouse facilities and housing whether there is anti-Taiwan generated hidden danger, and timely report in order to deal with timely.

(9) the general warehouse to do a good job of the existing anti-Taiwan supplies ready (such as flashlights, raincoats, rain shoes, etc.), and the necessary inventory of inventory report, depending on the circumstances of the plan to do a good job of purchasing, to ensure that the timely supply of supplies.

(10) the hotel fire facilities and equipment comprehensive inspection, to ensure the safe operation of the fire system.

(11) security guards ready to patrol flashlights, raincoats and emergency lights (in case of secondary power supply or special circumstances). Also, pick up 5 flashlights at the main warehouse.

(12) Command vehicles parked to a safe place (next to the fire center or in front of the lobby door), to prevent falling objects damage to vehicles.

(13) Responsible for security and safety in the area, and do a good job of fixed post and patrol post emergency adjustment.

(14) is responsible for the implementation of the necessary materials for the preparation of the rescue.

2, the necessary work during the typhoon:

(1) during the typhoon strict implementation of the car system, must be received after the dispatch order or superior instructions to go out of the car, in case of special circumstances must be consulted with the decision of the higher leadership.

(2) Dormitory administrators should carefully inspect the dormitory rooms, close the doors and windows, and deal with water ingress rooms in a timely manner and take safety precautions.

(3) Personnel to do a good job during the typhoon in the departments on duty attendance statistics, at the same time, keep abreast of the staff's security situation, and timely reporting.

(4) Arranging for specialists to take pictures of the actual situation during the typhoon and keep historical image records.

(5) Network administrators to deal with the hotel's computer system failures in a timely manner to ensure the normal use of the network.

(6) departmental work outside the hotel designated windproof work area: the main building 1-5 floor west channel water seepage prevention and treatment work.

(7) is responsible for timely collection of the latest typhoon warning information, announced the start and termination of the plan.

(8) Fire Center closely monitor the store fire and security safety, if any abnormalities immediately report.

(9) The security guards of the peripheral post shall unceasingly patrol the hotel courtyard and the peripheral areas to ensure the safety during the typhoon.

(10) is responsible for assisting the rescue work of personnel safety rescue work.

(11) is responsible for the jurisdiction of the typhoon storm reinforcement work.

3, the aftermath of the typhoon:

(1) unified organization of personnel to withdraw sandbags.

(2) Count the departmental losses, and report to the hotel leadership in a timely manner.

(3) check the department facilities and equipment, the need for maintenance projects timely reported to the Engineering Department maintenance.

(4) on the typhoon during the personnel overtime statistics summary, reported to the hotel leadership for approval, and then transferred to the Ministry of Finance to produce overtime wages, copy the Ministry of Engineering unified insurance claims, and for the record.

(5) collection of anti-typhoon advanced deeds, organization selection of anti-typhoon advanced, and advanced deeds and remembering examples, information out of the store newspaper, blackboard newspaper. Responsible for solving the evacuees and staff food, 3 accommodation arrangements.

(6) Check the safety of fire equipment in the store by meteorites, and do a good job of statistical reporting.

(7) The security team is responsible for the acceptance and inspection of the jurisdiction of the typhoon evacuation work, to assist the departments of the wind sandbags back, and properly placed.

(8) Coordinate with the relevant departments to deal with the work of the inspected security risks.

(C) Housing Department

1, pre-typhoon preparations:

(1) Prepare sufficient sandbags, placed in the spare area (lobby folding door, villa door, the second floor of the main building balcony guest room glass door, etc.), and enough to report the loss of fabrics and grass, in order to prepare for the waterproofing of various positions

(2) will be in the courtyard garbage cans, beach chairs, terrace coffee table, balcony chairs, sun umbrella All centralized placement or stored in a safe location.

(3) Place sandbags around the pool to prevent sewage from being discharged into the pool.

(4) Garden trees are reinforced against wind, and outdoor potted plants are moved to appropriate locations in the lobby to prevent wind.

(5) All guest rooms, building doors and windows need to be locked, and found that there are engineering problems reported in a timely manner.

(6) the guest room balcony coffee table, balcony chairs are moved into the room to prevent wind damage balcony glass.

(7) Lobby and guest rooms placed in the "typhoon guests notice.

(8) Do a good job of waterproofing the windows of the switchboard to protect the equipment in the room.

(9) When the switchboard receives the hotel's instruction to "activate the typhoon prevention plan", it should immediately notify the person in charge of each department. And every hour to query the weather forecast once, the latest situation will report to the command center (lobby assistant).

(10) to provide the day and recent days of guest reception status information, reported to the hotel leadership, in order to prepare for the typhoon period to grasp the reception capacity, and to ensure that the reception work in an orderly manner.

2, during the typhoon necessary work:

(1) The switchboard must accurately convey the command center issued by the command information.

(2) Lobby Assistant Manager to grasp the guest check-in and safety conditions, do a good job of guest appeasement. At the same time, maintain order in the lobby and provide guests with the latest weather conditions.

(3) The front desk retains an accurate "check-in, pre-arrival, pre-departure" manual tally sheet and guest information before the power outage for inspection.

(4) According to the "airport stranded guests plan" to make preparations for the reception. At the same time, to prepare a manual room status with the sales department to check the room status, do a good job of reception.

(5) to strengthen the inspection of the rooms whether there is water seepage or floor drain blockage, and make a record, found abnormal timely report. If there is water seepage in the room, the need to use fabric on-site treatment, water seepage is more serious must be immediately arranged to absorb water, maintenance, in order to prevent the carpet, furniture or wood flooring, such as invasion of water damage; such as the balcony floor drains are clogged, timely notification of the engineering staff to carry out repairs.

(6) Each villa to arrange designated personnel to stay, found that the problem of timely reporting processing.

(7) Do a good job of appeasement of the residents, and in the conditions allow the normal provision of room service, to ensure that guests normal check-in.

(8) Combined with the need to work properly deployed departmental positions staff work tasks.

3, after the typhoon after the work:

(1) count the loss of the department, and report to the hotel leadership in a timely manner.

(2) Statistics of water seepage rooms and other engineering maintenance problems, reported to the Engineering Department.

(3) Restore all moving items to their proper place.

(4) Do a good job after the typhoon hotel health comprehensive cleaning and disinfection work.

(5) Do a good job of garden trees and flowers pruning.

(6) Remove the windproof sandbags in the area and return them to the administrative office.

(D) Engineering

1, the preparation before the typhoon and the necessary work during the typhoon:

Personnel and materials:

(1) Requirement of the department personnel all to the post, 24 hours to stand firm, ready to deal with emergencies.

(2) After receiving the typhoon warning, according to the specific circumstances of the organization of windproof materials in place.

(3) Prepare sufficient diesel fuel, standby power generation.

Indoor equipment, facilities check

(1) Comprehensively check the power distribution system equipment, high and low voltage distribution cabinets, the switch control cabinets, to ensure normal operation.

(2) Check the equipment in the elevator machine room to ensure normal operation.

5 (3) Check the water supply system, underground water tanks stored enough water to ensure normal operation.

(4) Check whether the movable door of the lobby is intact and the whole door is solid.

(5) Check whether the plastic steel windows in the hotel, including villas, are intact, whether the glass on the windows is intact, and whether the windows and doors are closed.

(6) Prepare submersible pumps and hoses to ensure the normal use of equipment.

(7) carefully check the generator, water tank level, fuel tank level, oil level, battery voltage, battery level is in the normal position, check whether the generator is in the automatic position, low-voltage distribution cabinet generator detection signal is in the open position.

(8) typhoon landfall, the duty officer every half hour to check all the equipment in the room, pay close attention to the high and low voltage distribution room leakage, found faults in time to deal with, can not deal with the timely report to the manager, to ensure that the equipment is running normally.

Outdoor equipment and facilities check:

(1) Check the roof drain, clean up the garbage around the drain to keep it open.

(2) check whether the pool house drainage pump is reliable, and manually pumping test, typhoon landfall on-duty staff need to check here every half hour (whether the machine room water, whether the switchgear water phenomenon).

(3) check the sewage treatment station underground pump room cover is covered, the equipment in the engine room is normal, every half hour on duty to check the engine room whether water.

(4) Check whether the door of each tube well on the roof is closed, whether the lid of domestic water tank, hot water tank is closed.

(5) Check and fix the satellite reception antenna. The duty officer goes upstairs every 1 hour to check that the roof equipment is in good condition.

(6) Ensure the supply of hot water in guest rooms, observe the temperature of hot water, and turn on the electric heating when the water temperature is lower than 37℃.

(7) Check all outdoor rainwater wells and sewage wells and keep them open.

(8) Check whether the lightning rod of the telephone distribution frame in the main room is intact.

(9) Check the basement vent around the lobby and seal it with sandbags to prevent water ingress.

(10) Check all outdoor lights for sturdiness, including foundation screws. All outdoor cameras for sturdiness.

2. After the typhoon aftermath:

(1) Unclog all balcony floor drains with open covers.

(2) Resume installation of parking lot awnings.

(3) Check all the equipment belonging to the outdoor engineering department (neon lights, fence lights, post lights, lawn lights, etc.) and all the equipment on the roof of the loss of the situation, report to the hotel leadership. At the same time, the hotel will be all the losses summarized, presented to the hotel leadership review, and timely contact with the insurance company to implement the claims.

(E) Food and Beverage Department

1, typhoon preparations:

(1) Prepare enough sandbags, placed in the spare area (Chinese and Western restaurant folding door, kitchen entrance and exit, etc.), do a good job of protective measures.

(2) check each area and facilities and equipment (so-and-so hall, multi-purpose hall, conference room, Chinese and Western food and kitchen), the existence of problems timely reported to the Engineering Department for repair.

(3) lock all the doors and windows (check whether the fixed sandbags are solid) and move the tables and chairs away from the doors and windows farther away to prevent damage to tables and chairs. And the pool bar barbecue grill, barbecue tables and chairs moved to the proper location for storage.

(4) Prepare enough service supplies and disposable utensils (paper plates, cups, chopsticks, lunch boxes, etc.) in advance, and prepare enough bottled drinking water to ensure a temporary supply (for use in the event of water and power outages).

(5) Combined with the actual preparation of sufficient kitchen reserve food (such as: winter melon, pumpkin, potatoes, etc.), at least a week to use the rice, flour and cooking oil.

(6) Prepare semi-finished products and cooked food that can be stored in advance, frozen food to be used up or processed before the typhoon, and prepare all the raw materials predicted to be needed in advance (at least 2-4 days guarantee).

(7) Contact customers and make preparations for booking in advance.

2, the necessary work during the typhoon:

(1) uninterruptedly check each area (so-and-so hall, multi-purpose hall, Chinese and Western restaurant, etc.) whether there is water seepage, and prepare to report loss of fabrics and grasses, and timely and good on-site treatment.

(2) Timely check the supply of raw materials and the use of consumption, and a reasonable grasp of the deployment.

(3) to ensure that the resident guests and employees of the meal. In the case of conditions allow, the restaurant is 7 often external business.

(4) In addition to the work of the department other than the hotel's designated wind work area: the main building on the 1st floor (Chinese and Western food, lobby, reception, etc. a floor) wind, water seepage and the corresponding treatment.

3, the aftermath of the typhoon:

(1) do a good job in a timely manner to restore the business site and health and cleanliness.

(2) Count the departmental losses and report to the hotel leadership in a timely manner.

(3) check the department facilities and equipment, need to repair the project in time to report to the Engineering Department for repair.

(4) grasp the flow of customers, for the short term can not be used up the flexibility of raw materials, pay attention to the shelf life, regular ventilation and drying and good storage.

(F) Finance Department

1, typhoon preparations:

(1) Get in touch with the food suppliers, grasp the delivery situation, inform the relevant departments in order to prepare for the work.

(2) Arrange for the front desk cashier to work on the preparation of funds and emergency security measures.

(3) The network administrator of the hotel computer system check to ensure normal use.

2, the typhoon during the necessary work:

(1) Finance Department staff to do a good job of accounting information, archives, computers and related data storage, to do all the information storage clear to the person, to ensure that the accounting information and data integrity, and protection of equipment from typhoon infringement.

(2) front desk cashier must be in the power outage before the manual operation of the preparation, the data in a timely manner to backup. At the same time, the production of manual accounts to achieve no leakage, wrong accounts, to ensure the accuracy of the accounts settlement.

(3) In addition to the work of the department outside the hotel designated windproof work area: the main building 1-5 floor east channel water seepage prevention and treatment work.

3, the aftermath of the typhoon:

(1) with the departments to provide reference data on the cost of related losses.

(2) According to the hotel summary of the loss, check the bad loss of materials and make relevant records.

(3) Responsible for the hotel property loss records accounting and insurance companies for claims.

(VII) Sales Department

1, before the typhoon preparations:

Actively with the booking of the room customers to determine the arrival of the situation, in order to do a good job of booking arrangements.

2, the typhoon during the necessary work:

(1) the office to arrange personnel to stay, do a good job of sales contact and booking work, as well as the reception of the front desk needs to be coordinated, to ensure that the hotel sales work is carried out normally.

(2) In addition to the staff to stay, other personnel at any time at the disposal of the command center to participate in the work of typhoon prevention.

(3) Actively keep in touch with the airport, and do a good job in the reception of stranded guests and related arrangements.

3, the aftermath of the typhoon:

Statistics of the hotel's sales and reception during the typhoon, as well as after the typhoon sales conditions and trends, reported to the hotel leadership.

Part IV: General typhoon emergency plan program

First, the guiding ideology:

Typhoon, rainstorm prevention work is related to the lives of teachers and students and national property safety is an important work, in order to effectively protect the safety of teachers and students and property safety, to enhance the kindergarten flood control and typhoon disposal capacity, in line with the "prevention-oriented, safety first". Prevention first, safety first" principle, the development of this plan.

Second, preventive steps:

1, the leading group list and contact phone number

Leader:

Group leader:

Group member:

Kindergarten started the flood control plan, the implementation of the 24-hour leadership, 24 duty system.

Three, emergency measures:

1, to strengthen information communication, to do the top of the situation, the bottom of the report.

In the event of a major flood, all the leaders into place, flood control and Taiwan work leading group began to operate; the leaders in charge of the flood control and Taiwan work leading group to report on the flood; the full deployment of anti-Taiwan flood control work.

2, prevention-oriented:

Clear corridor. Before the typhoon landed, the balcony, corridor debris, flower pots, etc. should be cleaned up to prevent the typhoon landed, was blown down by the wind to hurt people.

Close the doors and windows. When a typhoon or rainstorm comes, the wind and rainfall are large, so you should close the doors and windows to prevent the wind and rain from damaging the doors, windows, furniture and causing casualties.

The janitor of the whole school sewer and the main catchment well to carry out a comprehensive dredging.

Unclogging of gutters and downpipes on school buildings and houses, and pruning and strengthening of large trees throughout the school.

A comprehensive safety check of lightning protection facilities and outdoor wiring on all school buildings.

Comprehensive safety inspection of outdoor antennas, air conditioning outdoor units, and external hangings.

Indoor power supply, sockets, doors and windows of all departments to do a comprehensive inspection.

When circuits and wires are interrupted due to a typhoon, power switches should be turned off and emergency lights, torches or candles should be activated.

Fourth, safeguard measures:

After the plan is activated, the kindergarten to do a good job of early warning and information records. Convene an emergency meeting, in the shortest possible time, by telephone and other forms of kindergarten flood control and Taiwan work deployment, inform the Taiwan flood dynamics, the arrangement of flood control and Taiwan, rescue and relief requirements and tasks.

At any time with the higher departments and units to maintain close contact, strengthen information communication, to do the upper situation, the lower situation reported.