Typhoon work summary 2022 1
In order to conscientiously implement the requirements of the relevant documents of the higher levels, minimize the hazards associated with the protection of workers' personal and property safety, and promote the normal production of various construction, is now my project in the year of 20xx Flood and typhoon prevention work report as follows:
First, strengthen the leadership, the implementation of responsibility
1, the establishment of flood and typhoon leading group.
Leader: xx
Deputy Leader: xx
Members: xx
2, the leading group set up an office, the office is located in the Department of Safety and Quality, is responsible for flood and typhoon specific work arrangements, daily inspections, combing, reporting and identification of sources of danger and other specific work, contact: Contact: Contact phone number:
3, the Ministry of my project to prevent floods and typhoons Leading group in March 1, 20xx re-amended the flood and typhoon contingency plan, and the establishment of the duty unusual system to ensure that there are people on duty 24 hours a day; the leading group of flood and typhoon prevention and control of the active implementation of flood and typhoon prevention and control of the responsibility and funds, every day in time to watch the city's meteorological stations, television stations, radio stations, and other media issued by the typhoon, torrential rains, high winds, lightning and other meteorological disasters warning information, according to weather Changes in time to do a good job of site flood control and typhoon prevention work.
Second, specific measures
1, raise awareness, do a good job of publicity. My project department flood and typhoon leading group in the flood season and bad weather before the arrival of small flyers, hanging signs slogans and other means of construction site workers to publicize the knowledge of flood and typhoon prevention and emergency rescue knowledge.
2, flood and typhoon leading group on April 2, 20xx organization of all the project team held a flood and typhoon safety meeting, which emphasized the significance of flood and typhoon prevention and my project department flood and typhoon work arrangements, and read the issuance of the "Flood and Typhoon Emergency Response Plan," at the meeting of the leading group of deputy leader of the flood and typhoon Wang Li emphasized that the construction team to do a good job! Flood and typhoon prevention work, focusing on the unusual beforehand, in the event of control, after the treatment, requiring each team in accordance with the "Flood and Typhoon Emergency Response Plan" emergency drills to improve the knowledge of all workers of flood and typhoon prevention.
3, the flood and typhoon leading group prepared a duty inspection system, every day and night by a deputy team leader and a team member is specifically responsible for flood and typhoon hidden trouble investigation, and the establishment of a sound information feedback system, once there is a flood the first time to notify the Director of the Flood and Typhoon Office, Wang Li, Wang Li cell phone to keep 24 hours open, Wang Li to the leading group of flood and typhoon leading group leader to report directly to the flood details. Details, the leader of the group, depending on the situation, announced the start of the "Flood and Typhoon Emergency Plan".
4, in the flood and typhoon leading group organization and coordination of the project department purchased a number of flood and typhoon emergency supplies, and the quality of the emergency supplies were tested to ensure that the emergency supplies are adequate and effective use.
5, in the flood and typhoon leading group coordination of my project department and Jinxian County People's Hospital and Jinxian County Fire Brigade made contact and reached an agreement, the two units for my project department of the flood prevention and control of the work of the collaborative unit, which Jinxian County Fire Brigade from my project 16. 4km, Jinxian County People's Hospital from my project 18. 1km.
6, in the flood and typhoon prevention Under the organization of the leading group, the project personnel and the site rescue group, the site rescue group on May 2, 20xx carried out a flood and typhoon emergency rescue drills, participate in the drill personnel *** count 76 people. Through the drill so that my project personnel to increase the knowledge of flood and typhoon prevention, improve the flood, typhoon rescue and self-help ability in the dangerous situation, improve my project department full staff of flood and typhoon emergency response capabilities.
Third, the summary
20xx year is coming to an end, in this year my project carefully organized, advance planning, strict implementation of safety first, prevention first, prevention and control of the combination of the policy, in a few typhoons and floods before the advent of timely preparations, and actively respond to the project for my project to reduce the economic losses of nearly 100,000 yuan, did not occur due to floods or typhoons and other inclement weather caused by any of the The company's business is to provide the best possible service to its customers.
Typhoon Summary 2022
This year, in the province, xx City Flood Control and Drought Relief Command under the correct leadership, the city effectively flood control, drought mitigation, to ensure that the people's lives and properties as a matter of concern to the overall situation of the top priority to grasp, up and down the linkage, the careful deployment of the grass-roots level of flood control to improve and improve the system as the Grasp, has taken a series of solid and effective measures to protect the city and important towns and cities, important infrastructure flood safety, the realization of reservoirs, important dykes and other water conservancy projects within the design standards of flood safety, drought irrigation has not occurred in a large water disputes, flood control, drought and Taiwan has achieved a comprehensive victory. Now the work is summarized as follows:
First, the basic situation
(a) water and rain situation. January-March this year, the city's average total precipitation of 590 millimeters, 50.1% more than the normal average of 393.1 millimeters; April-July the city's average total precipitation of 1,532 millimeters, 54% less than the normal average of 994.7 millimeters,; January-October the city's average total precipitation of 2,365.4 millimeters, 40.6% more than the average of 1,682 millimeters. Before entering the plum, the city's average precipitation of 1412.2 mm, accounting for 77.9% of the average precipitation over the years; into the plum flood season, the city suffered five heavy rainfall attack, the city has five times the average daily precipitation of more than 50 millimeters, the entire plum flood season the city's average precipitation of 558.6 millimeters; rainfall of 95.9 millimeters in August, than the average of the year-round 129.7 millimeters in August, a 26% shortfall.
Affected by heavy rainfall, Baishuikeng and Bowls Kiln two large reservoirs were opened 5 times and 4 times respectively, the total amount of flood discharge reached 198.08 million cubic meters and 51.39 million cubic meters respectively. Among them: Baishuikeng Reservoir highest water level appeared in June 21, 19: 45, the water level of 347.75 meters, exceeding the provincial flood limit approved level of 3.95 meters, the corresponding capacity of 211.23 million cubic meters; bowl kiln reservoir highest water level appeared in the early hours of June 22, 2:00 a.m., the water level of 194.72m, exceeding the provincial flood limit approved level of 0.48 meters, the corresponding capacity of 213.2 million cubic meters. In addition, Mei flood season, the city's 75 small (a) the average storage capacity of reservoirs reached more than 90%, most of the small reservoirs are overflowing; Jiangshan Hydrological new station flood peak water level reached 5.23 meters at 19:30 on June 20, the corresponding flow rate of 1230 cubic meters per second.
(ii) Disaster. Entering the flood season, persistent rainstorms had caused Jiangshan Harbor water level soaring, coupled with Baishuikeng and bowl kiln two large reservoirs opened flood gates many times, resulting in most of the townships (streets) have occurred to varying degrees of danger and disaster, especially along the townships of Jiangshan Harbor (streets) local levees, weir dams and other water conservancy facilities were flooding caused by landslides, collapses, etc., resulting in a certain degree of danger. After entering the main flood season, the city suffered seven heavy rainfall attack, by its impact, resulting in most of the townships of electricity, communications, transportation, water conservancy, farmland and other infrastructure damage, especially along the townships of Jiangshan Port of the dangers and frequent occurrence of disasters. the afternoon of June 21, Jiangshan Harbor Xiakou Township, Shuangtan Village, section of the upper ridge of the natural village of more than 200 meters of a levee was washed away by the water, received the report of the disaster, the mayor of the mayor Chen Jinbiao, Vice Mayor Xu Daqing quickly rushed to the scene to guide the municipal government office, Water Resources Bureau, Civil Affairs Bureau, traffic police and other departments, as well as Xiakou Township Party Committee and the local village leaders in the first time to start the Jiangshan Harbor flood defense plan, organizing more than 200 cadres and masses into the flood rescue. According to statistics, according to statistics, this year's flood washed away Jiangshan Harbor weir dam and other 4 about 450 meters, temporary weir dam 1 160 meters, Jiangshan Harbor embankment 6 and other about 930 meters, washed away the city's townships (streets) small watershed embankment, channels, weirs and dams, respectively, 8,293 meters, 17,215 meters, 38 places. As the city up and down the heart, tightly deployed, took strong measures to flood control and disaster prevention, timely control of the danger and disaster, there were no casualties and major security incidents.
August rainfall is low, due to abundant precipitation in the early stages, reservoirs, ponds, the current storage capacity is still up to about 55%, the vast majority of paddy irrigation water supply is more than adequate, only the dryland crops appeared drought water shortage phenomenon. This year's typhoon did not bring the city what impact, but before the typhoon landfall in the city at all levels still attaches great importance to close monitoring. Overall, the situation of drought prevention and protection against typhoons is better.
Second, the main practice
(a) leadership attention, a sound system, the full implementation of the responsibility system
First, up and down linkage, early preparation. Spring Festival a work, the city defense finger began to deploy flood control safety inspection work. Water Resources Bureau specifically set up to the Bureau of leadership in charge of sub-package, technical staff to participate in the six flood control inspection inspection team to assist, supervise the flood control safety inspections around the world, and one by one to develop corrective measures. The city and townships (streets), member units of the Flood Control Command signed an annual flood control and drought prevention work objectives, and issued a document announcing the list of various types of flood control and safety responsibilities.
Second, the system is perfect, publicity in place. Developed to improve the inspector assessment, small watershed flash flood warning staff, telemetry system maintenance and management responsibilities and flood control duty and other systems, and timely reporting of water flood rain and disaster statistics. At the same time, actively carry out various forms of flood control knowledge training and publicity activities. started in mid-April, the city specifically in the "Today's Jiangshan" opened a series of flood safety knowledge column, do a good job on mudslides, flash floods and typhoons and other types of catastrophic weather knowledge and emergency response capabilities of publicity to strengthen the public's awareness of disaster prevention and mitigation, and the ability to rescue and self-help. Municipal defense index in the "415" Flood and Taiwan Prevention Day, "512" Disaster Prevention and Mitigation Day, carried out a variety of forms of disaster prevention and avoidance of knowledge publicity, especially to strengthen the publicity of the people living along the rivers, flash floods and geologic hazards, downstream of the reservoirs and ponds at risk, and in low-lying areas. Strength. According to statistics, the city's cumulative organization of flood control responsibility, water conservancy, ponds and reservoirs embankment inspectors and meteorological coordinators, ***575 people to participate in centralized training. The unified production of flood control knowledge publicity drawings 500 copies, issued by the popularization of flood control knowledge, improve the ability of the whole population to resist disasters and self-help, such as the defense of common sense publicity manuals 2586, the transfer of people to understand the card 46,000 copies.
The third is to enrich the strength and strengthen the ability. The establishment of flood control rescue expert group, under the engineering, hydrology, electromechanical and fisheries four subgroups; the establishment of water conservancy engineering rescue detachment, under the driving group, engineering technology group, engineering machinery group, seven subgroups, 45 people. Commissioned by the City People's Armed Forces Department of the formation of municipal flood control and rescue water emergency response detachment, annual training and drills, including water business skills operations, life-saving business skills and other content. Townships and villages also effectively integrate the young and strong militia, forest firefighters and other forces, respectively, the formation of no less than 25 and 20 of the flood control and rescue team. On the morning of June 29th this year, a city-wide practical exercise on the emergency plan for riverine levee rescue and sudden geologic disasters was successfully held in the village of Bungyao, Bungyao Township. The townships (streets) have also carried out a variety of plans for practical exercises.
Fourth, increase investment, do a good job of grass-roots flood control system construction. This year, the city's 21 townships (streets) and within the jurisdiction of the flood control task of 294 administrative villages, 12 communities (neighborhood committees) to carry out a comprehensive grass-roots flood control system construction, and all through the examination and acceptance. In the construction process, highlight the key points, pay close attention to the implementation, focusing on the "seven systems, a delineation of a place" of the construction work to protect the lives and property of the people. In order to make the grass-roots flood control system construction does not go through the motions, but also the grass-roots flood control system construction included in the 20xx annual municipal government of the township (street) flood control work target assessment of one of the important assessment content. At the same time, has also invested funds of about 600,000 yuan, focusing on the selection of flash flood-prone security township security creek, bowl kiln township bowl kiln creek, Shimen township Shimen creek, silt head of the township Yongxingwu creek, He Village township Hengdu creek for the prevention and control of the construction of the pilot work. The completion of the grass-roots flood control system, so that the city's leading cadres at all levels, the masses of flood control concepts to further strengthen the flood control organization is more sound, job responsibilities are more clearly defined, more timely and accurate early warning, rescue more timely, powerful and efficient, flood control grass-roots capacity has been greatly enhanced.
(2) carefully organized, solid measures, comprehensive flood control and disaster prevention work
First, the command is appropriate, scheduling timely. After the occurrence of the disaster, the municipal government attaches great importance to the municipal party committee, immediately start the emergency plan. Municipal Party Secretary Fu Genyou, Mayor Chen Jinbiao, Vice Mayor, City Flood Control and Drought Relief Command Xu Daqing received a report of the danger, led the water conservancy technicians rushed to the scene at the first time to direct the arrival of torrential rains in the city before the Flood Control Command quickly start the emergency duty procedures, the commanding officer on duty, pay close attention to the water and rain information. In the unified scheduling of the city defense finger, bowl kiln reservoir, Baishukeng reservoir according to the reservoir water level, water and rain, Jiangshan Harbor water level and embankment rescue and other timely adjustments to the reservoir flood flow, to do rescue and flood organic combination, to ensure the safety of the reservoir flood.
The second is to work together, timely rescue. In the increasingly serious flood situation, cadres and masses at all levels to stand by and strengthen the daily inspection; when a dangerous situation occurs, in the first time to the threatened masses informed, and timely through the town, the village reported to the municipal defense index; grass-roots organizations, the masses to take timely measures, emergency evacuation and transfer of the masses along the embankment; rescue teams, machinery and other equipment in a timely manner into the rescue. City Defense also carried out cross-township flood control and rescue team scheduling, to assist in rescue. Continuous improvement of the city defense project, thousands of library security projects, river improvement projects and other engineering systems and non-engineering systems are also gradually improved, flood control and disaster mitigation play an important role in the obvious.
Third, strengthen management, service follow-up. The townships (streets), departments to strengthen the sense of responsibility, through the sound management of water organizations, strengthen the management of water, before the drought first dredging and strengthen the service and other measures, one level to one level to implement the drought prevention and drought measures. The city set up a drought service working group, in-depth guidance around the drought work; townships and villages have also set up drought service team hierarchically to understand the dynamics of drought; Xiakou Reservoir Management Bureau specifically set up a leading group of drought irrigation work with the drought work. The city's 76 water storage of more than 100,000 cubic meters of reservoirs, 10 irrigation more than 1,000 acres of weir dams and other water conservancy projects have established and improved the management of water institutions, part of the water damage weir dams in irrigation before the emergency repair work is also done in a timely manner. since July, according to the unified deployment of the Flood Control Command, drought this year's situation of the investigation, analysis of the drought irrigation facilities for a comprehensive inspection, and in a timely manner on the city's small ( a) type reservoirs above the trunk of the drought, and the drought irrigation facilities, and the city's small ( a) type reservoirs above the trunk of the drought. A) type reservoirs above the dry canal and electromechanical irrigation, comprehensively made siltation and repair trial run. At the same time, water conservancy, agriculture, power supply and education and other departments to grasp **** management, proactive drought prevention and drought services. The city did not appear obvious water conflicts and disputes, drought prevention and drought order is good.
Third, the main problems exist at present
1. Flood control and disaster reduction engineering system is still weak. Our city is located in the southwest of Zhejiang Province, the territory of many mountains, many rivers, mountainous areas of small watersheds inhabited by a large number of people, heavy rainfall is prone to induce flash floods in small watersheds and geologic hazards; although most of the city's reservoirs have been de-risked and reinforced, but the number of ponds, dykes are in disrepair, there are large safety hazards.
2. Small watershed flash floods and geological hazards are still difficult. The city has many geologic disaster sites, *** there are 102 geologic disaster sites. From the occurrence of disasters in recent years, many places that are not geologic disaster sites often occur casualties. At the same time, the city in recent years, the construction of 205 National Highway, Beijing-Taiwan Expressway, 46 Provincial Highway and other highway cut slope scale, steep slope, construction project abandoned ballast is more, and along most of the way for the geologic disaster prone area, the road slope rock fragmentation, there are avalanches, landslides and small watersheds mudslide geologic hazards potential.
3. Inadequate flood control funds. Small watershed flood-prone areas are often also relatively economically backward areas, local financial and collective economic weakness, some townships and departments of the flood relief funds are short, disaster emergency facilities are insufficient, emergency supplies can not be guaranteed, inspection, early warning of the responsibility of the staff remuneration is low, directly affecting the security of the ponds and the small watershed flash floods and disaster prevention work.
4. Part of the river embankment flood control capacity is being artificially reduced year by year. As the city has been low precipitation in previous years, resulting in many river siltation so that the riverbed is raised, the phenomenon of weir dams increase.
5. Most of the drought irrigation facilities need to be upgraded. Many electromechanical irrigation, pumping station is old, aging; most of the branch canals, ditches built in the 1970s and 1980s, years of disrepair, difficult to put into normal operation.
6. Flood control non-engineering measures to be further strengthened.
Fourth, the next step in the work intends to
Flood control and drought relief work is related to the people's lives and property safety, in the future work, the city will further strengthen the leadership, increase investment, strengthen the publicity of water laws and regulations, and continue to improve the awareness of the whole population of flood control to ensure that all the work of flood control and drought relief chapter, according to the law; to further improve the grass-roots level of flood control capacity building; to further accelerate the flood control and drought control measures and non-engineering construction. Flood control engineering measures and non-engineering construction, improve the flood control and drought relief basic security system, and continue to carry forward the "dedication, responsible, realistic" spirit of water conservancy, conscientious, concerted efforts, and continue to promote the city's flood control and drought relief work on a new level.
Typhoon Summary 3
This year's strong typhoon No. 9 "Meihua" passed through the Shanghai area on Sunday (August 7), bringing a certain amount of wind and rain to the Shanghai area. Due to the change of direction of this typhoon, it did not cause any damage to the branch. In order to strengthen the targeted prevention work, improve the ability of the branch to prevent typhoons, and further improve the usefulness of the branch emergency response system, to ensure that the branch staff and the branch life and property safety, is now the anti-typhoon work to summarize:
1, the branch leadership attaches great importance to make the anti-typhoon work to achieve a better result
Branch emergency leadership group in the company received the notice on the prevention of strong typhoon "Meihua", and actively respond to the leadership of the branch immediately organize the work of the staff, the first time to arrange contact emergency supplies, and do a good job to prevent the deployment of the typhoon.
2, branch plant emergency team members responded in a timely manner, with in place
Branch plant emergency team in the company received notice, immediately arranged for people to contact with the company's Emergency Management Office flood sandbags, and the deployment of arrangements for the list of flood prevention and rescue personnel. And in the first time the information of the arrival of the typhoon to all employees of the branch plant. The plant arranged the electrician to do rainproof treatment for all electrical cabinets in the workshop, and quasi-allocated submersible pumps for drainage in the power distribution room. In addition, the plant arranged special personnel to place sandbags and prepared fire buckets in the warehouse of the plant, the entrance of the workshop and other locations. Before the arrival of the typhoon, the leadership of the plant again led by members of the plant's emergency response team to the plant's preparation for the typhoon carried out a detailed inspection, to make sure that everything is safe.
3, unity of thought, serious response
Through this anti-typhoon pre-drill, the plant staff from the ideology to further improve the understanding of the plant to improve the level of emergency preparedness for the plant in the future to carry out similar emergency drills, laying a good foundation for the experience of responding to the plant will be a serious summary of the drill, and strive to be more thorough in the future work. The future work to do a more thorough, more solid.
Typhoon prevention work summary 2022 article 4
After receiving the warning notice of the defense of Typhoon 9 "Sura" and Typhoon 10 "Dawei", the township immediately and seriously implement the instructions and the spirit of the county meeting. The typhoon prevention instructions and the county meeting, the leadership attaches great importance to timely deployment, scientific command, the masses of cadres and masses of people to collaborate, strict precautions, and struggle, invested a lot of manpower, material resources, energy, and did the most adequate emergency preparedness and response work, the typhoon caused damage to a minimum, and achieved a comprehensive victory in the work of the typhoon prevention.
First, attach great importance to the organization in place
My township is highly vigilant, and quickly entered the state of defense against typhoon response. First, the countryside at both levels were set up to prevent the typhoon work leading group, strengthen organizational leadership, implementation of specific responsibilities. The second is to immediately convene a general meeting of all township cadres, quickly start the emergency plan to prevent the typhoon, the deployment of specific measures to prevent the typhoon work. The meeting strictly put forward the work requirements: to attach great importance to, remain vigilant, put an end to paralysis, to ensure that this anti-typhoon work without casualties, property damage to a minimum. Third, the leading cadres divided into sections of the village, deep into the forefront of the command work. Division of cadres in-depth village, field work. The staff of the organization are all on duty, implement 24-hour duty system, to keep the information unobstructed. Fourth, the establishment of three inspection teams, respectively, grass dangerous house inspection team, flood control inspection team, typhoon inspection team, check the situation, strengthen the patrol, supervise the work.
Second, increase publicity, awareness
In the face of the disaster, publicity first. During the typhoon, the villages through the loudspeaker, publicize the knowledge of typhoon prevention, defense methods, emergency measures, and stabilize people's hearts, firm confidence, so that every household knows, everyone knows, and improve the ability of the masses to protect themselves.
Third, focus on the implementation of measures
The focus of my township's work to prevent Taiwan is flood control, typhoon prevention and the transfer of people in dangerous houses. I township a flood control inspection team on the dike and the entire township water system conducted a safety inspection, the dangerous section of the dangerous section of the one-by-one inspection and supervision of remediation in place. The township 4 big ditch water all drained, before and after the gate closure, watch the gate personnel all on duty in place, emergency supplies and emergency commando all raised in place. Secondly, the typhoon prevention inspection team notified all the cooperatives and farmers of steel-framed greenhouses in the township door-to-door, requesting them to open the shed cloth, fix the steel frame and make emergency preparations. All enterprises, construction sites, billboards, etc. within the territory of the hidden dangers of the investigation, urged to rectify in place. Third, the grass-dangerous house inspection team in the file of all 81 grass-dangerous house, door-to-door notification reminders, more than 300 people all evacuated to a safe place, to ensure that there are no casualties.
Fourth, actively respond to the restoration of production and life
Immediately after the typhoon, the township leaders and division of cadres to go into the front line, inspection of the disaster, and immediately organize the verification of the damage, timely and accurate reporting of information. Immediately repair electric power and telecommunication facilities, the township enterprises, business and the masses into the normal production and living conditions. Instruct villagers to carry out self-help in production and life, repair and rebuild collapsed and damaged houses, and correct fallen crops and greenhouse crops. Mobilize the villagers to clean up the garbage, rectify the environment and improve the hygiene.
Typhoon Summary 2022
In the defense of the 22nd super typhoon "Mangosteen" in the process of the work of the city of xx at all levels of discipline inspection and supervision organs in the first time to take action, resolutely put the supervision in the forefront, and effectively improve the political standpoint, with a high sense of political responsibility to strictly carry out the implementation of the "Mangosteen", and to ensure that the work of the city of xx is carried out in a timely manner. A high sense of political responsibility to strictly carry out the implementation of the work for the defense of the typhoon to provide strong protection.
The first line of combat command, strict disciplinary requirements. September 16, since the Municipal Standing Committee, Secretary of the Municipal Commission for Discipline Inspection, Supervisory Commission Director Liang Riduan the first time rushed to Jiangzhou District, Daxin County, etc., and personally supervise all levels of the party committees, the government, disciplinary organs of the performance of their duties; the Municipal Commission for Discipline Inspection leadership team in accordance with the requirements of the division of labor, respectively, through telephone calls, unannounced visits, etc. on the various counties (municipalities and districts) to carry out the defense of super typhoon. Strong typhoon "Mangosteen" work implementation of supervision and inspection, requiring all levels of discipline inspection and supervision organs not only to strengthen the implementation of disaster prevention and mitigation measures for the relevant departments to supervise the situation, to ensure that the responsibility to put in place, the work measures in place, but also to strengthen the safety of their own office, review and investigation of the safety of the hidden troubles, to ensure that nothing happens.
Seriously fulfill their supervisory duties, layer by layer compaction responsibility. The city's discipline inspection and supervision organs at all levels through field visits, telephone spot checks, focusing on the municipal units, counties (cities, districts), towns (streets) in the work of the typhoon prevention, personnel in place, relief supplies ready, need to transfer the transfer of people to move, hidden dangers, shelter arrangements, emergency detachment formation, uploading and dissemination of the mechanism, the opening of the special line of help and other circumstances to supervise and check, further compaction of the city's various local Units to do a good job in the super typhoon defense work responsibility for the local defense of the typhoon to win the hard battle to provide a strong disciplinary guarantee. Requirements at all levels of discipline inspection and supervision organs, stationed agencies to supervise the unit in the defense of the typhoon work because of official inaction, falsehoods, dereliction of duty, infringement of the interests of the masses and other violations of discipline to strengthen the supervision and investigation of the serious consequences or adverse social impact, not only to seriously investigate the responsibility of the directly responsible person, but also to investigate the relevant leadership responsibility, and to choose a typical case of public exposure by name and name. At present, the city's disciplinary organs at all levels to carry out a total of 260 telephone supervision, deployed personnel field supervision 184 times.
Examining all kinds of hidden dangers to ensure the safety of disciplinary review. Municipal Commission for Discipline Inspection comprehensive consideration of the typhoon may bring water cuts, power cuts and other security risks, September 15, after requesting instructions from the autonomous region Commission for Discipline Inspection, in a timely manner, there may be a security risk of the first office of the xx city of the `retained personnel transferred to the second office of the xx city. A special meeting was held, requiring the first case location to once again carry out a carpet check of potential safety hazards, conduct a comprehensive inspection of the water and electricity situation in the detention place, and make the safety responsibility clear to the post and the implementation of the person; in view of the characteristics of the second case location close to the mountain, organize professionals to check the collapse, landslide, flash floods, mudslides and other geologic hazards, and put the wind and flood prevention, mudslides, rockfalls, and power outages and other typhoons that may cause Security risks are fully considered, and take appropriate precautions to ensure that the disciplinary review of the safety of the work is foolproof.