With the progress of science and technology and the times, society has higher and higher requirements for safety and environmental protection emissions, sewage treatment plants must also recognize the importance of safety work on the development of enterprises. The following is a "sewage treatment plant safety production monthly summary", for reference only, welcome to read.
Sewage treatment plant safety production monthly summary (a)A person only really realize the importance of a healthy body to him, he will take the initiative to insist on exercise, the same, our enterprises only really realize the importance of safety work on the enterprise itself, the enterprise will be completely in the past, "I want to be safe" of the work idea into "I want to be safe". Work thought into "I want to safety" attitude, will consciously do the most practical safety work. Therefore, we have to love our own body as much as to care for our business, and really take the safety work as a top priority to grasp, do a good job. The company's top management recognizes that in order to make the enterprise have a healthy "body", it is necessary to establish a standardized management system, to maintain a continuous improvement of the management mode, and constantly improve the enterprise "body" of immunity. Our sewage treatment plant is so important to safety production:
First, prevention, continuous improvement and dynamic management
Standardized management to the company has brought good economic benefits, the company decided to quality management system on the basis of the establishment of ohsas 18001 Occupational Health and Safety Management System, the advanced management model penetrated into the traditional management of the work. management mode penetrate into the traditional management work. The safety management is transformed from the passive management of after investigation and handling to the active management of beforehand prevention. Through the establishment of occupational health and safety management system and the application of the scientific method of "hazard identification, risk evaluation and risk control" and dynamic management, the company identifies all the hazards in the operation activities, evaluates the degree of danger of each hazard, and formulates the safety objectives and management programs for the major hazards. It strengthens the management of occupational risks from the source, utilizes dynamic management to reduce the probability of occurrence of incidents story.com, strengthens the management and rectification of major hidden accidents and major sources of danger through continuous improvement, reduces the occupational safety risks, and continuously improves the operating environment at the production site. Under the protection of the occupational health and safety management system, through the *** with the efforts of all employees, the company has not occurred in several years a serious workplace accidents, fire accidents, as well as events affecting safety and stability.
Second, the management system to guide the safety work
The management system is the "muscle" of the foundation of health, management system of procedural documents and operating procedures for the identification of sources of danger, operational control, performance improvement to provide methods and means of source: and means to guide the effective operation of safety work. Guiding the effective operation of safety work. The daily management of production safety and management system organic combination of management system operation process as an important part of the departmental management work, up and down to form a management chain, interlocked to form an organic whole. At the same time, improve the production safety responsibility system and employee commitment to production safety, a clear allocation of responsibilities, departments, employees can assume the responsibility for achieving safety goals, and adhere to the "said to write, written to do, to do to be effective. Do a good job in three combinations: the management system must be combined with the characteristics of the industry; the management system must be combined with the characteristics of the company; the management system must be combined with the positions. The company always maintains the awareness of continuous improvement in the implementation of management system, and constantly amends and improves the system's objectives to ultimately achieve the goal of preventing and controlling work-related accidents, occupational diseases and their losses, and through the pdca cycle of "plan, run, check and improve" activities, the "body" can be made to be "effective". The function of the "body" is constantly strengthened.
Three, make full use of audit resources to improve the management level of safety work
The audit work in the management system is a very important part of the measurement of the enterprise's "muscle" immunity is a necessary means. The company employs a group of experienced safety production management personnel as the company's internal auditor, the organization of internal auditor to each unit of internal audit, in accordance with the audit requirements, from the internal data to the production site in-depth inspection, and unit leadership and staff communication, communication, through the audit, to find out all kinds of security risks and weaknesses, and to develop appropriate corrective measures and preventive measures. The internal audit work is organically combined with daily safety management to promote safe production. Secondly, we make full use of external audits to help the company improve its management level. My company occupational health and safety management system supervision and audit is entrusted to Singapore psb international certification company. Because of the expatriates to see a wide range of knowledge, they put foreign advanced safety management work, especially in their "people-oriented" knowledge has a certain depth, in the audit of the company's safety work put forward many rationalization proposals, such as my company's training and assessment of personnel on the job, as long as the paper score of 60 points on the qualifications of the job, but the audit staff in the review of our training materials. Auditors found in the audit of our training materials, trainees in the prevention of hydrogen sulfide poisoning knowledge has not been clarified, and hydrogen sulfide is the company's most important source of danger, the auditor suggested that we in the future education and training, we must be the company's main source of danger and protective measures to answer the answer to the whole, or be re-trained. In addition, during the process of installing and dismantling pumps, equipment repair and maintenance, and going down the well, we only test hydrogen sulfide gas and combustible gas, and the external auditor suggested that safety accidents would also occur if the operators operate down the well with insufficient oxygen supply. Therefore, we promptly revised the work ticket for downhole pooling to increase the requirements for the detection of oxygen and carbon monoxide, and the company also purchased a composite gas tester in a timely manner, which was issued to the operation site and implemented as a regulation. The supervision and audit of Singapore psb international certification company helps the company to improve the level of production safety management, so that our production safety management work to a higher level.
Four, management system as a carrier, to strengthen the staff safety education
Management system activities is a complex system of engineering, involving all aspects of the company to improve the company's awareness of the occupational health and safety of all employees, to ensure that each post staff can have the corresponding post must be able to work, is to ensure that the safety of the development and stability of the prerequisites To improve the awareness of occupational health and safety of all employees and to ensure that each post holder has the necessary working ability for the corresponding post is the prerequisite for ensuring the safety development and stability, and the level of safety quality of the employees can directly determine the success or failure of the safety work. Therefore, the company in the formulation of policies and objectives, and staff safety education organically combined with the management system as a carrier, to strengthen staff safety education. The company will carry out "4.7" safety theme activities every year, through colorful forms of publicity and education, hydrogen sulfide gas targeted, professional publicity and education, in order to achieve the purpose of strengthening safety awareness, increase safety knowledge, improve the ability to identify and avoid risks and consciously abide by the safety discipline. Make the workers from "want me to safety" to "I want to safety, I know safety, I can safety" change, realize the "people-oriented safety". In addition, the staff "three-level education", "transfer education", safety production rules and regulations learning, into the management system. Through education and training, fully mobilize the staff to participate in the initiative and enthusiasm of production safety, play and rely on human creativity and wisdom, in a large number of mounting and dismounting pumps and equipment repair and maintenance process, correctly deal with the person, the machine, the environment of the relationship between the three, to protect the production activities of personal safety.
Sewage treatment plant safety production monthly summary (II)In order to further consolidate the foundation of security, according to the requirements of the documents issued by the Group, combined with the actual situation of sewage treatment plant, carefully organized, division of labor, strict control, pay close attention to the implementation of the meeting and held a meeting to launch the propaganda. Developed work measures, clear objectives, responsibilities and tasks. Activities are practical, focus on practical results, so that the first level to grasp the first level, the first level to the first level of responsibility. Grasp the point with the surface, grasp the two ends with the middle, to ensure that the xxx sewage treatment plant safety month activities carried out fruitful.
First, the leadership attaches great importance to the organization of measures in place
In order to strengthen the organization and leadership of this safety month activities, the sewage treatment plant under the leadership of the director of the plant, seriously implement the deployment of specialists to carry out a dedicated, effective division of labor, to ensure that the effective implementation of safety month activities, the company did not have a large and small injuries in the activities of the month of the safety accident occurred.
Second, to carry out a variety of activities, focusing on the actual effect
1, held a mobilization meeting, received the group company and the engineering company's safety production department documents, xxx sewage treatment plant immediately held a "safe production month" layout of the work of the meeting, to formulate the preliminary implementation of the program, organize workers to study carefully about the implementation of the program. Implementation of the program, the organization of workers to seriously study the spirit of the document on safety month.
2, a wide range of publicity, so that "everyone knows", through the office building propaganda wall, paste the production safety slogans, held a production safety exchange meeting, talk about the production safety of hidden preventive measures, etc., so that the production safety awareness y rooted in the heart of each employee.
3, grasp the safety education before and after the shift, organize and carry out half a year before the shift production safety seminar activities, and constantly improve the staff's awareness of production safety.
4, published a safety month as the theme of the blackboard newspaper, led the staff to study the safety accident cases, repeated study of recent safety accidents in Shenyang City, so that the staff to learn a lesson from it, firmly establish the idea of safety first, to do the "four do not produce," the full implementation of the two systems. Vigorously carry out mass anti-"three violations" activities, strengthen the staff safety education, improve the quality of staff safety technology, so that the safety education form and content, to be flexible and diversified, targeted to be strong, to achieve a certain scale, and really set off the climax of safety education. Combined with the actual unit, the organization of workers to participate in some of the company's cultural and sports activities, to enrich the amateur safety and cultural life of workers, to achieve the purpose of teaching and learning, subtle.
5, for the current situation of xxx sewage treatment plant carried out a special production safety inspection action, for the implementation of the production responsibility system in various areas, hidden trouble detection and management situation to focus on inspection. Inspection found that there is water in the cable trench, as well as water seepage water distribution wells, two sinking ponds scraper suction mud machine, coarse grating, building emptying gates and other issues, found that the problem, immediately in writing to the supervisor to truthfully report the situation.
6, x month xx xxx wastewater treatment plant organization of all employees to carry out an underground poisoning plan drill, the drill mainly requires the first time to do a good job of alarm, report, underground safety rescue and landing after rapid rescue procedures. The main purpose of this drill is to improve the staff's ability to deal with emergencies and master the rescue skills to ensure that the rescue mission can be successfully completed in case of emergency.
7, conscientiously implement the "prevention-oriented, safety inspection, mandatory maintenance" of the equipment management system, safety month during the planned, step-by-step 3-day safety month equipment inspection, maintenance and repair activities, the sewage treatment equipment for comprehensive maintenance, overhaul, renovation, replacement and adjustment.
Three, strengthen the safety management, the overall production work
Actively with the safety month to carry out a series of other safety activities. First of all, grasp the workshop safety production work, take targeted measures to eliminate the existence of hidden dangers on the scene. Secondly, grasp the site management. Activity team on the two construction sites to carry out dynamic safety inspections, timely detection and elimination of unsafe hidden dangers, to solve the problems in the implementation of various rules and regulations. Thirdly, the management of labor discipline was increased and assessed in accordance with the performance appraisal system for production staff of the engineering company. Fourth, strengthen the quality standardization work, formulated detailed work measures, the problems found to be timely and truthful report.
Sewage treatment plant safety production monthly summary (3)
In the company's leadership and sewage treatment of all colleagues of the *** with the efforts of the inspirational, upward and carry forward the spirit of continuous struggle so that the sewage treatment plant to a great technological improvement, so that sewage effluent water quality cod has the original 4000 or more down to 1000 below, 500 below, 300 below, or even lower.
Sewage treatment plant equipment operation, in personnel management, process operation, equipment maintenance, safety construction and workshop appearance, environment and other aspects of the congratulatory achievements, thus effectively alleviating and controlling the pollution of the water environment, and to promote the further development of the cause of the chemical wastewater treatment of Dettec, and made its due contribution. Through the recent technological reform and trial operation, so that new colleagues have learned the theoretical knowledge and actual production, deepen the mastery of professional knowledge and understanding, make full use of the favorable conditions to cultivate our practical ability to strengthen the discovery of the problem, analyze the problem, solve the problem, and so on, all the comprehensive ability. So that we get the operation and management and other aspects of the actual knowledge, to understand these processes and equipment operation and the existence of the problem, for the future work to collect the necessary information, to solve the design of the problems and defects that may exist in the new knowledge and understanding. For the treatment plant work run this month, is summarized as follows:
-, the main contents of the trial run include
1. Collect information: ① production methods and scale, process characteristics; ② understanding of the geographic environment: including the plant and the surrounding planes, the plant and the surrounding related hydrology, meteorology and geology Information; ③ understand the emission pattern of pollution sources, emission characteristics and pollution; ④ water quality in and out of the water.
2. Technical reforms: ① secondary treatment of unqualified water for the intermediate pool connected to the pipeline to the regulator tank; ② dosing system improvement, so that the original three dosing pumps at the same time dosing is now reduced to one dosing pump for the company to save two dosing pumps at the same time, saving manpower, material and financial resources; ③ air compressor so that the air flotation to achieve unprecedented results. The remaining wind to change to three dosing tanks and two dosing barrels and to meet its needs, so that the drug and water mixing more evenly, no precipitation, no lumps; ④ lifting pump inlet to increase the mixer, so that the drug and raw water mix more evenly and thoroughly; ⑤ air flotation tanks at the south end of the grease trap increase the sewage discharge to the drying pool, effectively avoiding the air flotation pool again by the serious phenomenon of oil contamination, and at the same time eliminating the need to clean up the labor force; ⑥ air flotation pool at the south end of the pool Increasing the platform enables the operator to understand the water quality and treatment effect more timely and accurately, and can be controlled. At the same time for cleaning scum, oil pollution to bring operational convenience; ⑦ scraper mud scraper replacement, and in the scraper at the bottom of the board to increase the weighted steel bar, so that scraping effect is more obvious, more clean and thorough;. ⑧ air-float pump plus check valve effectively solve the high-risk phenomenon of water spraying every time you stop; ⑨ walnut shell filter, activated carbon filter in its internal up to 40 ℃ above the extreme heat and serious furfural and other harmful odors interfere with the situation into the filter inside the filter material for a thorough replacement and cleaning so that the transmission of water quality and chromaticity has been improved to a higher degree; ⑩ activated carbon filter bottom outlet butterfly valve in the extremely The butterfly valve at the bottom outlet of the activated carbon filter is extremely damaged, has not been put into use for a long time, has no mechanic to repair it, and is difficult to disassemble and install, so we have carried out a reasonable replacement and installation and improvement.
3. equipment process: ① master plant sewage treatment of the detailed process or treatment method; ② master the treatment equipment and structures of the layout and characteristics (construction form, detailed structure, process equipment performance and size, control mode), to understand the principles of the layout, ③ master the main process of the operation of the process, to understand the main control indexes and the changes; ④ master a variety of wastewater treatment Monitoring, control instrumentation and use; ⑤ treatment process in the amount of various consumption indicators.
Second, combined with the actual, improve xx chemical sewage treatment operation and management level
Operation and management is a good x chemical x industrial sewage treatment plant key link. Since the operation, we have overcome the various factors affecting the total amount of wastewater treated, overcoming the high concentration of water quality, the magnitude of change and other factors affecting the quality of the effluent, strict control of a variety of process parameters, based on the municipal bureau of detection and laboratory quality monitoring, to strengthen the position of inspection efforts and frequency of the implementation of the production process of the whole process of control in the water volume of the small, high concentration of water intake conditions, and has always been to achieve the quality and quantity! The XX chemical wastewater treatment plant to complete the sewage treatment task every month, the various effluent indicators basically all meet the design requirements, in line with the environmental assessment standards.
In order to ensure the comprehensive performance of the equipment and facilities, improve the utilization rate, according to the equipment and facilities of the operating conditions, we learn from all parties, the establishment of various types of basic equipment accounts, the development of scientific and reasonable maintenance plan to ensure normal production and operation. At the same time, relying on iso14001 system standard, implement the combination of management and utilization, increase the equipment, facilities on-site management efforts, the implementation of the job responsibility system, and strengthen the operation of the post of duty patrol. The company's goal is to provide the best possible service to its customers, and to provide the best possible service to its customers.
Three, people-oriented, comprehensive strengthening exercise xx chemical sewage treatment workers team
20xx x the end of the month I and my new colleagues from the group sewage treatment team so far, we do not have any engineering design drawings and process flow in the sewage treatment plant and any related information under the circumstances of the sincere invitation of the plant equipment and technology related personnel xx Chief Engineer, xx production director, director of the machine shop xx, as well as electricians and laboratory colleagues, etc., to the sewage treatment of theoretical and practical explanations; to understand the use of equipment, grasp the perceptual understanding of maintenance; often organizing the team to discuss each other's operating methods. In short, the use of a variety of forms of learning and exchange methods, operating positions to establish a cross-species composite technology, skills training, the formation of "both the sewage treatment and know how to operate the technology, both electrical repairs and know how to mechanical maintenance, both laboratory analysis and know how to operate the equipment.
Four, to strengthen the chemical safety management, the normal operation of the sewage treatment escort
We in accordance with the relevant requirements of the higher level, the overall production safety work, so that the safety management to achieve systematic, standardized, standardized. Organize workers to seriously study the safety regulations, to ensure safe production and personal safety, strengthen the publicity and education and training efforts to workers Dun, increase the safety inspection efforts, for the discovery of hidden dangers in a timely manner to rectify and solve.
We are in just three months of groping, operation, improvement, made some gratifying achievements, but the face of social requirements of the sewage industry continues to improve, the environment, ecological protection requirements are growing, we run the development of the more challenges we face, our task will be more arduous and difficult to go, but I believe that we will do a better job, so that the sewage treatment plant in the Dettol Chemical to play to the greatest extent! We will contribute to the cause of social environmental protection, give the world a sunny tomorrow, and give mankind a beautiful planet home. In the face of future development, we have the following points to envision:
1, improve the environmental protection management network, strengthen the construction of accountability.
2, strengthen the publicity and training work, and strengthen the awareness of environmental protection.
3, the word "strict" at the head, people-oriented, the establishment of a complete set of rules and regulations, comprehensively strengthen the internal management, and constantly improve the assessment system to ensure safe, effective, full-load operation.
4, actively carry out the governance and utilization of pollutants.
Next month, our main work plan is as follows:
① Strengthen the operator's comprehensive training and management work;
② Continue to maintain the post of strict operating discipline, compliance with the rules and regulations, as well as on-site sanitation and environmental cleanliness of the development of a clean and sound;
③ drying pool scum thoroughly cleaned up the slag and slag replacement, and to the original old waste activated carbon, Walnut shells for drying pool filter filler to replace the slag, I believe the filtering effect to catch up with the previous. At the same time for the waste activated carbon, walnut shells as solid waste must be designated by the municipal bureau of the relevant professional units to deal with the "conviction" to find the full use of space, that is, to reduce energy consumption and have a reasonable place to go. Finally, it can also be pulled to the gas stove as fuel to burn completely.
④ for lifting the pool submersible pumps placed to do the groundwork;
⑤ lifting the pool bottom sludge thoroughly cleaned up and do a good job of the device to the oil oil recovery, so that the company down to the minimum loss, recovery of the highest interest;
⑥ do a good job of the three-stage grease trap oil collection;
⑦ comprehensive hardening of the ground of the sewage treatment plant, but also sewage treatment plant, a high-quality environment;
⑦ sewage treatment plant ground hardening, sewage treatment plant a high-quality environment;
⑧ tertiary grease trap and regulating tanks built between the sewer ditch, so that rainwater has to drain, water has to go;
⑨ to the sewage of a specific operating indicators, process parameters, laboratory analysis data;
⑩ to solve the problem of oil pollution around the oil pumps, hardening of its surroundings to allow the accumulation of sewage has to be discharged.
Five, summary
With the development of enterprises and social progress, environmental protection to meet the standards has been a *** knowledge and requirements, our sewage treatment post also planned for the future of the environmental protection and development plans, we will summarize the past results, drawing on, learning from external success, and continue to improve the image of environmental protection of the enterprise, and actively respond to the national policy, with all levels of environmental
To solve the problem of oil pollution around the dirty oil pump, hardening its surrounding so that the accumulation of sewage have rows of data. Policies, with all levels of environmental
Protection department to increase efforts, and pragmatic grasp of the economic development of the Detai chemical enterprises at the same time, grasp the environmental protection of the Detai chemical governance, a long and unremitting, to create a more brilliant environmental protection enterprises tomorrow.
Sewage treatment plant safety production monthly summary (four)20XX is the XX city center sewage treatment plant put into production and operation of the fourth year, in July-August this year, the maintenance department of our company carried out a large-scale overhaul and replacement of equipment throughout the plant, in the normal overhaul process there were some emergencies, resulting in ammonia nitrogen exceeded the standard, after a series of later rectification, the current operation of my plant is normal, After a series of rectification, the plant is now operating normally and the water output has reached the standard agreed in the contract. From the overall situation this year, whether from process control or personnel management or equipment operation, have made some progress and growth in the process of operation, in the city, the district leaders concerned about the company's leadership with the support of the leadership of the XX city center wastewater treatment plant throughout the year the production and operation of the basic stability of the plant, no major accidents occurred in the production of safety. Now the treatment plant this year's work is summarized as follows:
First, the operation of the overview
1, process control
I plant 1-12 months of the treatment plant cumulative treatment of domestic sewage is expected to reach x million tons, the average daily capacity of about x million tons, the average daily capacity of x million tons of water, the average intake COD184mg/L, the effluent COD43, 7mg/L, the effluent COD43, 7mg/L, the effluent COD43, 7mg/L, the effluent COD43, 7mg/L. The average influent COD184mg/L, effluent COD43,7mg/L, the cumulative reduction of COD for 1852 tons; average influent ammonia nitrogen 22,5mg/L, effluent ammonia nitrogen 8,3mg/L, the cumulative reduction of ammonia nitrogen for 187 tons; January-December produced 2860 tons of residual sludge, *** consumed 1 ton of PAM flocculant, the average moisture content of sludge is less than 80%, of which 2860 tons of residual sludge has been fully transported to the XX District Life Waste Landfill for harmless treatment; 1-12 months treatment plant *** total electricity consumption of 2.28 million degrees, the average monthly power consumption of about 190,000 degrees; the average daily power consumption of 6,246 degrees, the average ton of water consumption of 0, 173kw/h/ton.
I plant in 20XX at the end of x month to the end of x month on the reaction pool aeration equipment overhaul, in the end of the overhaul resumed use, the reaction pool activated sludge to varying degrees of loss and reduction, resulting in a decline in the efficiency of biochemical treatment, the effluent of ammonia and nitrogen exceeded the standard. After taking a series of restoration measures, our plant is running stably at present, and the average value of each index of the effluent water is as follows: CODcr36mg/L (standard value ≤60mg/L), BOD58,1mg/L (standard value ≤20mg/L), SS8mg/L (standard value ≤20mg/L), total phosphorus 0,3mg/L (standard value ≤1,0mg/L), ammonia nitrogen 4,5mg/L, and ammonia nitrogen 4,5mg/L (standard value ≤1,0mg/L). , ammonia nitrogen 4, 5mg / L (standard value ≤ 15mg / L), in line with the "urban sewage treatment plant pollutant discharge standards" (GB18918-2002) at the national level B standards.
2, equipment operation
Since October 20XX since the operation of the plant has been running for more than 5 years, in order to protect the treatment plant equipment safety, high efficiency, normal and sustainable operation, this year, a full range of equipment overhaul, replacement, in addition to equipment in accordance with the instructions to do a good job on the parts of the oil lubrication and maintenance to extend the service life of the equipment, the main work that has been completed for: 3 Taiwan aeration fan lubricant and belt replacement; 3 sets of lifting pump lubricant replacement and check valve maintenance; 4 sets of reasoner replacement lubricant; mud press system to replace the lubricant and high-pressure cleaning system; 8 sets of water valves and air valve maintenance; 16 sets of reflux pumps and sludge pumps overhaul; 3 # aeration fan fan fan replacement; 3 # decanter replacement of the hydraulic screw; ultraviolet disinfection equipment to replace the lamps, casing and ballasts; the biochemical tank aeration disk to carry out a comprehensive overhaul of the Biochemical pond aeration disk for comprehensive overhaul, replacement; biochemical pond online monitoring equipment (sludge concentration meter, dissolved oxygen meter, level meter) for comprehensive overhaul, replacement,; complete the sewage plant next to the various pools of protective railing painting, anticorrosion work; improve the centralized control system and so on. I plant according to the actual operation of the problem, and gradually improve the equipment and facilities operating procedures, and all employees have been trained to ensure that the sewage treatment plant facilities, equipment and normal operation.
3, laboratory analysis
Wastewater treatment plant laboratory through the incoming and outgoing water quality to carry out various testing work, guidance with the operation. According to the laboratory monitoring results show that: January to August this year, my plant is running stable, the water basically meets the standard, in September, October water ammonia nitrogen appeared in part of the period of time exceeding the standard phenomenon, laboratory in the routine testing of daily water quality on the basis of increasing the frequency of testing of ammonia nitrogen in the water out of the various pools, to provide a basis for technological adjustments. From the end of October this year, the water gradually returned to standard, the current pool is running normally, the pollutant indicators are up to standard discharge. In addition, the laboratory monthly with the XX Municipal Environmental Protection Bureau monitoring station on the water quality of sewage plants to take pieces of monitoring; with online monitoring equipment operation and maintenance of online monitoring equipment to do comparison tests to ensure the accuracy of the equipment; in addition to doing a good job in the treatment plant daily testing and analysis work at the same time, the laboratory also undertakes the reporting of relevant data.
4, other
This year, the plant received external visits and leaders at all levels of departmental inspection of more than 10 times, each time we strive to meet the state of the inspection and visit the task of the leaders at all levels of the issues raised by us to actively rectify the problem, good advice to actively adopt. December 2 this year, the municipal government white mayor, the district government Lu District Governor, the park director Zhang, the city environmental protection bureau Zheng director, the district environmental protection bureau high director and other leading expert group to visit our plant, in the sewage treatment plant to listen to the work of the report on the basis of the actual operation of the plant on-site inspection of the rectification of the situation of the plant and the operation of the plant have given full affirmation of the situation, the expert group has also been put forward for the operation of the plant's valuable comments.
Two, personnel management
1, personnel training
Currently, the sewage treatment plant in the 18 personnel, including 3 managers, 8 operating duty personnel, 2 laboratory tests, 1 financial, electrical maintenance of 2, 1 purchasing, 1 chef. This year, combined with the actual operation of the treatment plant, through the form of coaching + examination, the organization of the whole plant personnel training 6 times, 1 assessment. Through a series of training and assessment, on the one hand, so that the whole plant staff a more detailed understanding of the process of my plant operation and the process will have a greater change in the factors affecting the process, so that in the daily operation of the operation in a timely manner to control the process parameters; on the other hand, also improves the professional and technical knowledge of the staff and the level of operation, for the construction of a professional wastewater treatment plant staff team to lay a better foundation.
2, control system
Institutionalization, standardized management is the main direction of the development of sewage treatment plants, this year, I plant to develop and improve a series of rules and regulations, including the position of job responsibility system, production safety management system, handover * system, the system of accountability for dereliction of duty, health management system, the system of morning meeting, laboratory management system, canteen management system, duty record filling system and operation report management system. In addition, according to the actual operation situation, we have improved the equipment operation procedures, various reports and production materials. Through the implementation of the above series of rules and regulations and standardized procedures, the management of the plant is a step forward, laying a solid foundation for the normal operation of the future.
Third, the second phase of construction
1, the second phase of the progress of the project
Due to the needs of XX city development, the plant has been launched in the second phase of the project is expected to invest x million yuan, the main construction of the two CASS pools, a grille room and ancillary equipment, piping and electrical installation works. The second phase of the project in 20XX x month x officially started construction, so far has accumulated investment of x million yuan, at present the second phase of the two CASS biochemical reaction pool civil construction is completed, the fine grille room main project has been completed, the remaining grille room decorative decoration part is expected to be completed next year x months x days ago, the rest of the second phase of the supporting civil engineering part will be completed before x months x days ago, and equipment installation, about the end of the month of x to complete all the work, and strive to x months to start water intake, piping and electrical installation works. Work for the x month to start water, commissioning, operation.
2, the current focus of the work of the second phase of the project
At present, we have entered the winter, due to the XX city geographic and climatic factors, it is not appropriate to continue the construction of the current focus of the work is the second phase of the civil works of the overwintering protection work for the next year to lay a good foundation for the work, we are ready to implement the measures are:
1, the outer wall of the use of non-expansion materials such as gravel soil backfill 2 meters;
2, the inner pool wall paste 1, 2m high insulation board, pool water injection 3m deep; 24-hour manned inspections, broken, cut the pool ice water on the pool wall of the internal pressure.
3, * exposed beams, columns around the use of insulation board or insulation cotton cover protection.
4, pool body and pool wall around the device protection railings and warning signs, strengthen the daily management and maintenance.
5, track the weather at any time, according to the specific circumstances, to take appropriate precautions, in strict accordance with the implementation of my company's Project Department of the implementation of the winter program, the limit of safe and smooth transition through the winter.
Fourth, 20XX work ideas
20XX for the XX city center sewage treatment plant is an extraordinary year, next year, the second phase of the project will enter into formal operation, when the entire sewage treatment plant will reach 100,000 tons of daily capacity, more pressure on behalf of the power of more, after this year's plant equipment Overhaul, we believe that the new year, in the city, district leaders at all levels of concern and support of the company's leadership, our staff will, as in the past, go all out, and make every effort to complete the new year's tasks and work objectives, to ensure that the sewage treatment plant is stable, normal operation of the equipment, the discharge of water to meet the standards for the cause of sewage treatment to hand over a satisfactory answer sheet.