Which Weiren brother has the test questions of the National Special Equipment Safety Inspector Examination in the past years?

(September 2003 National Safety Inspector Training Pilot Class)

Scores:

Type of questions

Marks

Deductions

Signed by the reader

Nouns and Explanations

10 points

Multiple Choice

45 points

Non-Regulation

20 points

Short answer

25 points

Total scores

100 points

AQSIQ Boiler and Pressure Vessel Safety Supervision Bureau

September 15, 2003

I. Nomenclature (***4 questions, counting 10 points, 2.5 points per question)

1, safety monitoring:

It is responsible for the safety of special equipment, government administrative organs for the purpose of achieving safety and engaged in decision-making, organization, management, control and supervision and inspection of the sum of activities.

2, "Administrative Licensing Law" in the administrative licensing:

This refers to the administrative organs in accordance with the application of citizens, legal persons or other organizations, after examination in accordance with the law, permission to engage in specific activities.

3, "Regulations on the Safety Supervision of Special Equipment" (hereinafter referred to as "Regulations") in the elevator:

refers to the power-driven, the use of a box running along the rigid guide rail or along the fixed line of the steps (steps), lift or parallel transportation of people, goods, electromechanical equipment, including manned (goods) elevators, escalators, moving walkways and so on.

4, major accidents of special equipment:

It refers to the death of 3 to 9 people, or injury to 20 to 49 people, resulting in a direct economic loss of 1 million yuan (including 1 million yuan) more than 5 million yuan of equipment accidents.

Two, multiple-choice questions (please fill in the selected answer on the horizontal line, ***40 questions, 45 points)

(a) single-choice questions (***30 questions, there is only one correct answer to each question, 1 point per question)

1, the safety monitoring information management system and inspection information management system must be .

A, the same interface style B, developed by the same company

C, dynamic data exchange D, their respective management and maintenance of the same data stored in different servers

2, boiler pressure vessel out of service for more than a year when the use of units should be boiler pressure vessel sealing, sealing to the registration authority to apply for the stop.

A, 45 days B, 2 months C, 30 days D, 3 months

3, continuous out of service for more than months (should include repair and transformation time) of the medical oxygen tanks in the re-commissioning of the inspection should be carried out in accordance with the annual inspection.

A, 3 B, 4 C, 5 D, 6

4, pressure piping unit in the out of service or scrapped within the acceptance of the use of the safety inspection agency for the record, and for the deactivation or cancellation of the use of registration procedures.

A, 60 days B, 30 days C, 3 months D, 2 months

5, "Regulations" stipulates that the state of special equipment design links in accordance with the different types of equipment, respectively, using the design file identification and design unit qualification licensing system, the following equipment design does not need to identify the design file.

A, boilers B, gas cylinders C, large amusement rides D large cranes

6, special equipment safety supervision and management of special equipment production, use of units and inspection and testing organizations to carry out safety monitoring, the following statement is incorrect: .

A, there should be two special equipment safety inspectors to participate, and show valid documents

B, should be the content of each safety inspection, found that the problem and the handling of the situation to make a record, signed by the person in charge of the archives

C, found that there is a violation of the law or in the use of special equipment in the existence of potential accidents, should be in writing or verbally issued in the form of Special equipment safety supervision instructions, ordered to correct or eliminate potential accidents

D, found that major violations or serious accidents, should take the necessary measures at the same time, and promptly report to the higher-level supervision and management of special equipment safety

7, the flash point is lower than the liquid is called explosive liquid.

A, 60 ° C B, 45 ° C C, 50 ° C D, ambient temperature

8, for speeds greater than 0.63m / s traction elevator must be equipped to prevent overspeed, fall device.

A, counterweight speed limiter and safety clamp B, car speed limiter and instantaneous safety clamp

C, car speed limiter and progressive safety clamp D, rope breakage protection device

9, the most basic mechanism of the crane is .

A. gantry B. hoisting mechanism C. slewing mechanism D. bridge

10, "Pressure Vessel Safety Technology Supervision Regulations" (hereinafter referred to as the "capacity of the regulation"), the pressure conditions for the division of pressure vessel category refers to .

A. Maximum working pressure B. Maximum allowable working pressure C. Design pressure D. Safe opening pressure

11, "capacitance regulations" stipulates that, according to the design pressure of the pressure vessel is divided into four levels, the pressure range of medium-pressure vessels is .

A, 0.1MPa ≤ p <1.6MPa B, 1.6MPa ≤ p <10MPa

C, 10MPa ≤ p <100MPa D, p ≥ 100MPa

12, the conclusions of the internal inspection of the boiler is divided into four, the following is not the conclusion of the internal inspection.

A, allowed to run B, supervision and operation C, rectification and operation D, restrictions on operation E, stop running

13, the following can not be engaged in the inspection of medical oxygen tanks.

A, medical oxygen chamber inspector B, pressure vessel inspector

C, pressure vessel inspector D, boiler pressure vessel pressure piping senior inspector

14, the following methods belong to the non-destructive testing methods.

A, type test B, mechanical properties test C, chemical analysis and testing D, ray detection

15, "General Requirements for Testing and Calibration Laboratory Competence" standard number is .

A, ISO/IEC17020 B, ISO9000 C, ISO/IEC17025 D, GB/T18346

16, the "Regulations" refers to the special equipment involved in the safety of life, the danger of boilers, pressure vessels (including cylinders), pressure piping, elevators, , passenger ropeways, large-scale amusement facilities.

A, plant motor vehicles B, lifting machinery C, explosion-proof electrical D, sports facilities

17, the production, use, inspection and testing of special equipment and its , shall comply with the "Regulations", but the "Regulations" provided otherwise.

A, supervision and inspection B, factory inspection C, coal mine special equipment D, railroad locomotives

18, special equipment safety supervision and management departments in handling the "Regulations" for the relevant administrative approval matters, should be accepted from the date of application within days, to make a permit, approval, or non-permission, approval of the decision.

A, 30 B, 45 C, 50 D, 60

19, the "Regulations" provides that the elevator should be cleaned, lubricated, adjusted and inspected at least once a day.

A、30 B、25 C、20 D、15

20、According to the Administrative Penalty Law, the conditions applicable to on-site penalties in administrative penalties are .

A, the facts of the violation of the law and have a legal basis, the citizen to impose a fine of less than 50 yuan, a legal person or other organization to impose a fine of less than 1,000 yuan or a warning

B, a legal person to impose a fine of less than 5,000 yuan

C, a citizen to impose a fine of less than 1,000 yuan

D, a legal person to impose a fine of less than 10,000 yuan

21, the implementation of special equipment safety supervision and administrative punishment of the main body for .

A, special equipment safety supervision and management department B, inspection and testing agencies

C, commissioned institutions D, authorized organizations with the function of managing public **** affairs

22, the "Regulations" provides for inspection and testing work is the type test, periodic inspection and .

A, commissioned inspection B, supervision and inspection C, factory inspection D, inspection of goods

23, the "Regulations" stipulates that the maintenance of the maintenance must be carried out by the law to obtain the qualification of its installation, alteration, repair, or manufacture of licensed units.

A, large amusement rides B, passenger ropeways C, elevators D, cranes

24, has been licensed, approved, registered special equipment production, use of units and inspection and testing institutions, when they no longer meet the "Regulations" conditions and safety specifications, should be revoked by the license, approval, registration.

A, the higher authorities B, AQSIQ

C, provincial special equipment safety monitoring agencies D, the original license, approval, registration agency

25, overseas units applying for special equipment licensing, approval of the acceptance and review by .

A, AQSIQ safety inspection agency directly responsible for

B, the next level of safety inspection agency to sign the opinion

C, the provincial safety inspection agency is responsible for

D, provincial acceptance, the national licensing, approval

26, the use of units using the special equipment without regular inspection or failed inspection, by the special equipment safety Supervision and Administration Department .

A, immediately ordered to stop using

B, seizure

C, more than 2,000 yuan, less than 20,000 yuan fine

D, ordered to make corrections; overdue corrections, more than 2,000 yuan fine of 20,000 yuan

27, cylinder filling unit should be licensed by the Special Equipment Safety Supervision and Administration Department can engage in filling activities.

A, the state B, provinces, autonomous regions, municipalities directly under the Central C, prefectural cities D, cities with districts

28, the State Administration of Quality Supervision and Inspection of the "supervision and management of boiler and pressure vessel manufacturing" belongs to .

A, administrative regulations B, laws C, technical regulations D, departmental regulations

29, the local special equipment safety supervision and management department refers to .

A, the local Bureau of Quality and Technical Supervision B, the local special equipment (boiler) or section

C, the local special equipment (boiler and pressure vessel) Inspection D, the local Quality and Technical Supervision Inspection Brigade

30, the "Regulations" stipulates that the design unit should be licensed by the State Council special equipment safety supervision and management department before engaging in its design activities.

A, boilers B, pressure vessels C, elevators D, lifting machinery

(B) multiple choice questions (***10 questions, each question has more than one answer, 1.5 points per question)

31, pressure piping following ring safety supervision and management measures are formulated separately by the State Council.

A. Design of Pressure Piping B. Manufacture of Pressure Piping Components

C. Installation of Pressure Piping D. Use of Pressure Piping

32. The Regulations stipulate that the following shall be subject to the supervision and inspection by inspection and testing organizations.

A, pressure vessel manufacturing process B, elevator manufacturing process

C, pressure piping components manufacturing process D, the installation of passenger ropeways

33, the "Regulations" stipulates that the following sites are the focus of site safety inspection of special equipment.

A, party and government organs B, schools C, shopping malls D, parks

34, "Regulations" provides that the following special equipment for the public to provide services to the operation of the use of units, should be set up to manage the safety of special equipment or equipped with full-time safety management personnel.

A, elevators B, passenger ropeways C, large amusement rides D, gas cylinders

35, does not belong to the "amusement rides safety technical supervision regulations (for trial implementation)" of the scope of supervision.

A, observation car B, cruise ship C, water motorcycle, speedboat D, bungee jumping

36, special equipment safety supervision and management department of the safety inspectors should have what conditions? .

A, familiar with the relevant laws, regulations, rules and safety specifications

B, with appropriate professional knowledge and work experience

C, by the State Council special equipment safety supervision and management department of the assessment, to obtain the certificate of special equipment safety supervisors

D, loyal to their duties, adhere to the principle of law-enforcement

37, the administrative authorities The parties to make the revocation of business licenses, ordered to suspend production and other administrative penalties, the parties should be informed .

A, the right to request a hearing B, on-site penalties

C, the penalty decision and the production of penalty decision D, disobedience to the penalty decision to apply for reconsideration or prosecution of the way and date

38, the "Regulations" stipulates that the production of special equipment include .

A, design, manufacturing B, use C, inspection and testing D, installation, transformation, maintenance

39, according to "Boiler Pressure Vessel Registration Management", the following circumstances of the boiler pressure vessel shall not apply for registration of change.

A, the use of more than 20 years B, the existence of potential accidents

C, in the original use of the scrapped D, in the original use of the use of the unregistered

40, the "Regulations" stipulates that the following equipment should be scrapped, and canceled to the original registration authority.

A, there have been serious accidents B, more than the inspection cycle

C, the existence of serious hidden accidents, there is no value of transformation, repair D, more than the service life of the safety specifications

Three, right and wrong questions (***20 questions, counting 20 points, 1 point for each question; √ for correct, × for incorrect)

1, the production, use of Production and use of units can be exempted from or mitigated by signing a "life and death contract" with the operator, and other ways to reduce their liability. (√)

2, in accordance with the requirements of the safety specifications, should be carried out type test of special equipment products, components or trial production of new products and components of special equipment, must be carried out as a whole or components of the type test. (√)

3, according to "Gas Cylinder Safety Supervision Regulations", the gas cylinder filling unit can only be filled with its own property rights of gas cylinders (including automotive cylinders, fire-fighting cylinders, etc.), shall not be filled with technical records are not in the filling unit of the gas cylinder. (×)

4, "Regulations" clearly stipulates that the production and use of special equipment units should be the main person in charge of the unit of special equipment safety is fully responsible. (√)

5, passenger ropeways, large-scale amusement rides operation and use of units in passenger ropeways, large-scale amusement rides before the daily put into use, should carry out test runs and routine safety inspections, and check the safety devices to confirm. (√)

6, "capacity regulation" stipulates that the pressure vessel subjected to internal pressure, its working pressure is the highest pressure that may occur at the top in the course of normal use. (√)

7, the use of special equipment should be developed by the special equipment emergency response measures and rescue plan. (√)

8, special equipment inspection and testing organizations and inspection and testing personnel shall not be engaged in the production and sale of special equipment, shall not be recommended in its name or supervision, supervision and marketing of special equipment. (√)

9, China's accession to the WTO Protocol provides: the treatment given to imported boiler and pressure vessel products is not less favorable than that given to the national product, including conformity assessment of the fees charged and the validity of factory certification. (√)

10, the enterprise's quality system certification standards are mainly ISO14000, ISO18000 and so on. (×)

11, the special equipment inspector's review and assessment work by the national unified proposition, the State Administration of Quality Supervision, Inspection and Quarantine is responsible for the organization and implementation.

(×)

12, all in-use special equipment regular inspection cycle for one year. (×)

13, special equipment installation, renovation, repair of the construction unit before construction must be approved by the municipality directly under the Central Government or the city of the proposed construction of special equipment safety supervision and management department before construction. (×)

14, "Regulations" provides that special equipment in use or put into use within 30 days after the use of units should be to the municipality directly under the Central Government or county-level city special equipment safety supervision and management department registration. (√)

15, "the Chinese people *** and the standardization law" stipulates: standards are divided into national standards, industry standards, local standards and enterprise standards. (√)

16, citizens, legal persons or other organizations have violated the administrative order, but the punishment does not comply with the legal procedures, the administrative punishment is invalid. (√)

17, special equipment safety supervision of administrative responsibility and criminal responsibility of the main body of the state administrative organs. (√)

18, the "Regulations" provides that the special equipment safety supervision and management department of special equipment production, use of units and inspection and testing institutions to carry out safety supervision, in case of emergency can take emergency measures, but should be followed by the issuance of additional special equipment safety supervision instructions. (√)

19, the safety condition level of 4, 5 mobile pressure vessels or safety condition level is set at 5 fixed pressure vessels, should be canceled, disassembled and scrapped. (√)

20, according to "Special Equipment Inspection and Testing Organization Management Regulations", inspection and testing organizations in accordance with its size, nature, capacity, management level, etc. Approved as A, B, C, D level. (×)

Four, short-answer questions (***4 questions, 25 points, the first 10 points, the rest of the 5 points per question)

1, issued by the State Administration of Quality Supervision, Inspection and Quarantine system of quality inspection, "eight strictly prohibited" and the work of the special equipment safety supervision and inspection of the "ten prohibited "What is it?

(Reference Answer: Omitted)

2, "Special Equipment Inspection and Testing Organization Management Regulations" referred to in the special equipment inspection and testing organization refers to which institutions? Should have the "Regulations" required by what conditions?

Reference Answer:

The first question, "inspection and management regulations" Article 3: special equipment inspection and testing organizations are engaged in special equipment inspection, supervision and inspection, type testing, non-destructive testing and other inspection and testing activities of the technical institutions, including integrated inspection agencies, type test institutions, non-destructive testing organizations, cylinder inspection agencies.

The second question, "Regulations" Article 43: special equipment inspection and testing organizations, should have the following conditions: (a) with the inspection and testing work appropriate inspection and testing personnel; (b) with the inspection and testing work appropriate inspection and testing equipment and instruments; (c) have a sound management system of inspection and testing, inspection and testing of responsibility system.

3, "Regulations" stipulates that special equipment should be accompanied by what documents? And on the elevator factory random documents.

Reference Answer:

The first question: special equipment factory, should be accompanied by safety and technical specifications required by the design documents, product quality certification, installation and use of maintenance instructions, supervision and inspection certificates and other documents.

The second question: the elevator factory, must be accompanied by the manufacturing company on the elevator products or parts of the factory certificate of conformity, the use of maintenance instructions, packing lists and other factory random documents.

4, "special equipment line license implementation measures (for trial implementation)" in the provisions of the special equipment line license includes what items?

Reference Answer:

(a) special equipment design license

(b) special equipment manufacturing license

(c) special equipment installation, alteration, maintenance license

(d) cylinder filling license

(e) special equipment registration

(f) special equipment operators test

(g) special equipment operators test

(h) special equipment design license

(i) special equipment design license

(ii) special equipment manufacturing license

(iii) special equipment installation, renovation, maintenance license

(iv) cylinder filling license

(e) special equipment registration

(vi) special equipment operators assessment

(VII) special equipment inspection and testing organizations approved

(VIII) special equipment inspection and testing personnel assessment