Performance Site Safety Emergency Plan (General 5)
In the weekday study, work and life, there may be some unexpected accidents, in order to improve the awareness of risk prevention, minimize the loss, often need to prepare an emergency plan in advance. Write an emergency plan need to pay attention to what format? The following is my collection of performance site safety emergency plan, only for reference, welcome to read.
Performance site safety emergency plan Part 1
This activity is carried out in the Hangu Theatre, in order to ensure the safety of the school activities, effective handling of emergencies, the establishment of unified command, effective operation, reflecting the rapid, clear responsibilities, disposal of a strong emergency response system, to minimize the hazards of emergencies, to maintain and ensure that the normal conduct of this activity, according to the relevant national laws and regulations, combined with the actual work of the school. The main purpose of this plan is to ensure that the event is conducted in a normal manner, according to the relevant national laws and regulations, combined with the actual work of the school, and specially formulated.
First, the organization
The activity of the security work leading group.
Leader: Liu Kehong, Li Zhaohua
Deputy leader: Zhang Lixin, Long Jing
Members: Li Lianyu, Cheng Tieliang, Liu Chenxiang, Cui Taimin, Jia Pengwei grade head of each classroom teacher
Second, the requirements
1, Zhang Lixin, Li Lianyu, Jia Pengwei to do a good job of the activity of the safety guide Patrol work, exclude factors affecting safety, Liu Xiaobo do a good job of students injured rescue, bandaging, nursing and other pre-arrangements, dealing with student injuries should be sent to the hospital in a timely manner and get in touch with parents.
2, the performance, the class teacher shall not leave the students, the students should listen to the teacher's command to carry out activities, without the consent of the teacher, shall not be free to enter and exit the venue.
3, in the performance to watch the students to maintain the venue hygiene, not mess still peel, confetti, not spitting, not on the ground scurrying, up and down the stairs to pay attention to the safety of not pushing and shoving.
4, encountered an emergency by the Moral Education Department is responsible for the timely handling of the classroom teachers to listen to the command of the unified deployment, do not panic, according to the school's requirements for the operation of the evacuation of students from the nearest security door, the major events should be timely alarm 110, 119, 120 request for assistance in the shortest possible time will be sent to the hospital to the injured teachers and students to save the scene of the accident to protect the good.
5, dealing with the accident leadership to quickly report the situation to the Education Bureau.
6, the teacher responsible for each security door to ensure that the road is open in case of emergency, evacuate students.
Third, the activity of the personnel arrangements
1, Liu Kehong group leader is the performance of the total responsibility and the main security responsible.
2, Zhang Lixin is responsible for the performance of vehicles and logistics.
3, Zhang Lixin, Li Lianyu is responsible for the security of the performance.
4, Li Lianyu, Jia Pengwei, Cui Taimin and ten teachers are responsible for the discipline of the event venue.
5, Liu Xiaoliang is responsible for the performance of the camera and photography.
6, Tao Yue, Bai Hua is responsible for the performance of the students on and off the stage.
7, the theater is responsible for the sound of the show.
8, Li Rongguo, Tian Bo, Tang Jianguo, Yang Yong, Liu Guosheng, Zhao Zefang is responsible for the first floor security door switch, Wang Shuaishuai, Fu Xinghui, Zhu Wenyong, Wang Chenglin is responsible for the second floor security door switch.
9, the class teacher is responsible for the performance of the class safety.
10, the head of grade level is responsible for the safety of students in all grades.
11. Teachers who are not scheduled for the task must follow the class.
Vigilance Disposal Group
Head: Zhang Lixin
Members: Li Lianyu, Jia Pengwei, Cui Taimin, two security guards
Basic responsibilities: after the occurrence of emergencies, the rapid maintenance of order at the scene, the evacuation of the scene personnel, the incident of the first disposal.
Evacuation team leader: Li Lianyu
Members: Jia Pengwei, Cui Taimin and ten teachers
Basic responsibilities: under the command of the site command team, according to the measures and evacuation plan evacuation routes, order, orderly evacuation of teachers and students, evacuation of the evacuation of order after the completion of the evacuation.
Casualty rescue group: Liu Xiaobo
Site equipment handling group: Cui Taimin
Members: some teachers
Basic duties: responsible for the injured transported to the designated safe area, and after simple treatment, sent to the nearest hospital for treatment.
Performance site safety emergency plan Part 2
I. Purpose and basis
For the effective prevention and timely control of public **** place in the activities of the emergency, quickly take correct and effective measures to properly deal with emergencies, minimize the harm and impact of the relevant laws and regulations of the State, has been formulated. The plan is based on the relevant laws and regulations of the country.
Second, the place where the accident occurred and its possible consequences
Applicable to cultural and sports centers, theaters. Easy to crowd crowd pressure and vehicle collision accidents, indoor focus on preventing fire, electricity and major accidents. Participants get on and off the car on the way to and from the traffic accidents, activities in the sudden death of disease and so on.
Three, accident reporting procedures
By the specific personnel to the competition organizing committee report, after the security team by communication and written form to the county security department report.
Fourth, emergency measures
1, by the leading group of unified command, the organization of rescue;
2, by the rescue team to evacuate the flow of people;
3, rescue and treatment of the injured;
4, in time to contact the relevant departments to urgently put into the rescue and aftercare.
Fifth, the implementation of measures
1, the plan will be included in a variety of large-scale activities to implement the program.
2, held before the event will be developed for the specific circumstances of the event security program, the main will be the safety of all personnel involved in the implementation of the duties in place.
3, the activities of the security officer, security inspectors, security inspectors and specific implementation
Coordinator, the formation of a full range of security measures mechanism, for the implementation of key parts of the implementation of key care, fixed-post fixed staff.
4, the establishment of transportation, public security, electricity, community and other security joint mechanism, and in the first three days of the event with the relevant departments to coordinate the implementation of the specific tasks of the security responsibility area.
5, held before the event held a preparatory meeting of the safety work, publicity and education to establish a sense of security and the requirement to convey the implementation of each head.
Six, the organization (slightly)
performance site safety emergency plan Part 31, purpose
In order to ensure that the xx field xx work area condolence performance evening collective activities of the orderly, safe, stable and successful, effective prevention and timely control of the activities of the emergency incident, quickly take correct and effective measures to prevent the occurrence of the emergency. Emergencies, quickly take correct and effective measures to properly deal with emergencies, minimize the harm and impact, specially formulated this plan.
2. Scope of application
This plan applies to the prevention, warning, emergency preparedness and response to emergencies during large-scale activities of cultural performances organized by the Production Management Center of the xx gas field.
3, the work of the principle
3.1 prevention-oriented: to increase the publicity and popularization of safety knowledge, to improve public self-protection awareness. Detailed investigation of public **** place and large-scale activities in all types of emergencies hidden danger, take effective preventive and control measures to reduce the chances of emergencies.
3.2 Management in accordance with the law: public **** places and large-scale activities in the prevention and control of emergencies in the management and emergency handling work, to strictly implement the relevant state laws and regulations.
3.3 Rapid Response: the organizers of large-scale activities should be established accordingly, early warning and handling of rapid response mechanism, in the event of emergencies, immediately enter the emergency state, start all kinds of plans, in the emergency command center under the leadership of the unity of the measures taken decisively, in the shortest possible time to control the situation, to minimize the hazards and losses.
4, start conditions
When the evening performance in the process of fire, explosion, building collapse, due to overcrowding caused by the squeeze stampede and other events, the start of this emergency plan.
5, the emergency organizational system and responsibilities
5.1 Emergency Command Center
Commander-in-chief: Plant Director
Deputy Commander-in-chief: Deputy Plant Director, General Worker
Members: Section Chief
Responsibilities:
a) organization, command, coordination of all units involved in emergency response action, and give the task of emergency handling.
b) Finalize or approve the on-site emergency response plan;
c) According to the needs of the scene, organize the mobilization and coordination of emergency rescue forces to the scene;
d) Approve the release of information and emergency reporting materials;
e) In the process of emergency response, responsible for the local government authorities to ask for help or to cooperate with the government's emergency response;
f) Approve the public ******, the public emergency response plan, the public emergency response plan, and the public emergency response plan;
Responsibilities. p> f) approval of public **** gathering place event emergency rescue costs;
g) analyze the scene of the handling situation, timely decision-making, orders;
h) study and solve major problems in emergencies;
i) to strengthen the contact with the government and related departments, timely reporting, notification of the situation and information.
5.2 On-site Command Department
Leader: Deputy Director
Deputy Leader:
Responsibilities:
a) In accordance with the instructions of the Emergency Response Command Center, responsible for on-site emergency response command;
b) Collecting on-site information, verifying on-site situation, and formulating and adjusting on-site emergency response plan in response to the development of the situation;
(c) In the process of emergency handling, report to the Emergency Command Center in time for abnormalities and implement the instructions;
(d) Be responsible for integrating and deploying on-site emergency resources;
(e) Report to the Emergency Command Center in time for the emergency handling;
(f) Cooperate with the local government to carry out the work of emergency handling;
(g) Be responsible for releasing on-site information in accordance with the instructions of the Emergency Command Center; and
h) Verify the conditions of emergency termination and request the Emergency Command Center to indicate the termination of emergency;
i) Collect and organize the relevant information of the emergency handling process;
j) Finish the other tasks assigned by the on-site command.
5.3 Emergency Coordination Group
Leader: Production and Operation Section
Deputy Leader:
Responsibilities:
a) Comprehensively track and understand in detail the development of the incident in the public *** gathering place and the situation of the handling, and promptly report to the Emergency Command Center to report, request and implement the instructions;
b) In accordance with the on-site emergency handling program carry out rescue;
c) Organize the units to cooperate with the professional team on-site rescue and guardianship;
d) Do a good job of on-site martial law, personnel diversion, vehicle control, medical assistance, etc.;
e) Scheduling of emergency rescue materials and coordination of the surrounding units of the emergency rescue resources for the rescue;
f) Do a good job of instructing the site to do a good job of personnel diversion, emergency rescue, security cordon, traffic control and rescue;
g) Do a good job of directing the site to do a good job of emergency rescue. Rescue, security alert, traffic control work, with professional emergency teams to do emergency rescue work;
g) to assist the local government to evacuate the surrounding residents;
h) to complete the site command of other preparatory work assigned.
5.4 Logistical Support Group
Group Leader: Service Section
Deputy Group Leader:
Responsibilities:
a) track and detailed understanding of the public **** gathering place incident site handling situation, and timely report to the Emergency Command Center, instructions and implementation of the instructions;
b) in accordance with the scene of the emergency handling program for the rescue;
c) guarantee vehicle scheduling in emergency work;
d) carry out the emergency process of accommodation, medical, security and other logistical preparations;
e) do a good job in assisting the local government to develop the evacuation program and its implementation.
f) be responsible for the emergency supply of funds, materials and other supplies needed to deal with the incident, as well as the treatment of the injured;
g) be responsible for emergency transportation security in emergencies;
h) to complete the other preparatory work assigned by the on-site command.
5.4 Emergency rescue group
Leader:
Deputy leader:
Members:
Duties:
a) The emergency rescue group should organize rescue and relief on the spot, and contact with the local departments, and seek cooperation from the emergency response center and the relevant local units. On-site personnel from the purification plant section, workshop (station) of the professional engineers, and according to the need to deploy reinforcements at any time.
b) Determine the personnel assigned to the scene and standby.
5.5 Financial security group
Leader: Finance Section
Deputy Leader:
Members:
Duties:
a) Comprehensive tracking and detailed understanding of the development of the public **** gathering place event site dynamics and the situation of the disposal of the emergency command center in a timely manner to report to the emergency command center, instructions and implementation of the directive;
b) Implement emergency supplies, emergency handling and other emergency funds;
c) Responsible for the monitoring and auditing of the costs involved in the emergency handling process;
d) Analyze the financial risks and provide coping strategies;
e) Responsible for matters related to personal and property insurance and claims;
f) Responsible for other tasks assigned by the on-site command center.
5.6 Safety and security group
Group leader: Defense Section
Deputy leader:
Responsibilities:
a) comprehensive tracking and detailed understanding of the public **** gathering place event site. Development dynamics and handling situation, timely reporting to the emergency command center, request instructions and implementation of instructions;
b) responsible for the activities carried out before the confirmation of security conditions, security precautions;
c) is responsible for the evacuation of people in the event of emergencies;
d) is responsible for cooperation with the local public security organs and related departments on-site forensics work on the key key parts of the Management Center and the leadership of the security guard work.
6, emergency prediction and early warning mechanism
6.1 Assessment and prediction
The organizer of the large-scale activities should be ready to deal with the emergencies of the ideological preparedness and organizational readiness to strengthen the day-to-day management and monitoring, pay attention to the daily collection of information and dissemination of information on the possible occurrence of early warning information related to the security of public **** to conduct a Comprehensive assessment and prediction, the development of effective supervision and management of accountability and prevention of emergency control measures, as far as possible, early detection, early reporting, early disposal.
6.2 Preventive and Early Warning Actions
6.2.1 The Party and Government Offices should establish the necessary early warning and rapid response mechanism, and strengthen the supervision and inspection beforehand for all kinds of large-scale activities; organize drills and exercises for all kinds of emergency response plans, and sharpen and coordinate the operation mechanism.
6.2.2 public **** place to develop the necessary daily safety and security programs, security responsibility system. Strengthen the daily human, material and financial reserves, and enhance the ability to deal with emergencies.
6.2.3 The organizer of large-scale activities must be held before the activities to develop the appropriate safety and security work programs and emergency plans, reported to the local public security department for the record.
6.2.4 The public security organs in accordance with relevant laws and regulations are responsible for the safety and security of cultural activities to carry out safety inspections, and is responsible for the local public **** place and large-scale activities of public security management work.
6.2.5 The organizer of the large-scale activities and the relevant local units *** with the responsibility for the implementation of safety and security programs and security responsibility system; responsible for the prior safety and security work of publicity and education to enhance the staff's awareness of security; responsible for assisting the public security organs of the activities of the venue for security checks; responsible for taking the necessary measures to timely eliminate hidden security risks.
6.3 Early warning support system
Public **** place to hold large-scale activities should be strictly approved personnel capacity, strengthen the monitoring of the flow of people on the site; installation of the necessary fire, safety and technical precautionary equipment, equipped with early warning communication and broadcasting equipment, reserved public security, firefighting, rescue and evacuation of the site and channel; to ensure the number of security staff, clear task allocation and training of different signs; in the entrance and exit gates and the main access roads. Signs; in the entrance and exit door and the main channel to set up a person in charge of the work of evacuation.
6.3.1 When an emergency occurs, each unit should report to the Emergency Command Center in a timely manner after receiving the report.
6.3.2 Reporting information should be as objective and practical, true and accurate. Strive to provide information from multiple sides and angles, to prevent one-sidedness.
7, emergency response and measures
Emergency prediction, early warning, alarm, police, handling, end, aftermath of the link of the competent departments, collaborating departments, participating units, must be in the Emergency Command Center under the unified command of the leadership group, fully perform their duties, and effectively achieve the up and down linkage, left and right interaction, close cooperation.
7.1 Emergency Response
7.1.1 Basic Response
a) When it is confirmed that an emergency public **** event is about to occur or has occurred, in accordance with the requirements of the "unified command, professional handling", the establishment of the leading comrades of the units to participate in the on-site command department to determine the contact person and means of communication, command and coordination of transportation, fire, communication and public safety. Command and coordination of traffic, fire, communications and medical emergency departments such as emergency teams to carry out pre-rescue operations, organization, mobilization and help workers, the masses to carry out rescue work.
b) The on-site command shall maintain law and order in the area where the incident occurred, do a good job of transportation security, evacuation, mass settlement and other work, and do its best to prevent the further expansion of the emergency situation. Timely grasp of the progress of the incident, at any time to the emergency command center report. At the same time, combined with the actual situation on the scene, as soon as possible to study and determine the scene of the emergency incident handling program.
c) Participate in the emergency public **** event handling on-site command, the relevant sections and departments should immediately mobilize the relevant personnel and handling team rushed to the scene, under the unified command of the on-site command, in accordance with the division of labor of the special plan and the requirements of the event handling procedures, cooperate with each other, closely collaborate, **** with the emergency handling and rescue work.
d) The on-site command shall follow up the progress of the situation in time, and once the situation is found to have a tendency to further expand, and may exceed its own control ability, it shall immediately send a request to the higher authorities, and the higher emergency command center shall assist in deploying other emergency resources to participate in the work of handling.
7.2 Expanded Emergency Response
7.2.1 When it is expected that a particularly significant or significant public **** incident will occur or has occurred, the corresponding emergency plan will be activated. According to the level of the incident, the higher departments of the emergency command center, unified leadership of the sudden public **** incident handling work.
8, emergency disposal
8.1 Information reception
8.1.1 The occurrence of a public **** gathering place event, quickly reported to the emergency command center office, up to 10 minutes. In the process of emergency handling, the on-site command shall at any time to the emergency command center to report the progress of the situation, at least every 15 minutes by phone.
8.1.2 The emergency report shall include, but not limited to, the following:
a) the host and co-organizer of large-scale assemblies, celebrations, etc. in public *** gathering places, the number of participants, time and location;
b) the description of the situation of emergencies (fires, explosions, building collapses, crushing and trampling due to overcrowding, etc.);
c) the possible causes;
d) casualties and emergency measures taken so far;
e) social and political impact;
f) request for coordination and support from the Emergency Command Center;
g) unit, name, position and contact number of the reporter.
8.2 Convene the first emergency response meeting
The first emergency response meeting is chaired by the general director or deputy general director of the emergency response command center, and the content of the meeting includes, but is not limited to:
a) Briefing on the situation of the incident of the public *** gathering place;
b) Determination of the general director of the on-site emergency response headquarters and the list of members, and the establishment of the on-site emergency response headquarters;
c) Define the tasks and requirements of the emergency handling work;
d) Judge the internal and external emergency resources to be deployed;
e) Determine the time of the first release of information, the release channel and the spokesman for the news;
f) Report to the superiors and the relevant departments of the local government in accordance with the specified time.
8.3 Emergency Reporting
When level Ⅰ, Ⅱ events occur, according to the instructions of xxxxxx Emergency Command Center, do the emergency reporting work:
a) Production and Operation Section reports to the Production and Operation Office of xx Branch;
b) Safety and Environmental Protection Section reports to the local Public Security Department, Health Department, and Safety Supervision Bureau;
c) Party and Government Office Report to XX Branch Emergency Response Office and Cangxi County Emergency Response Office;
d) the report content by the Emergency Response Command Center Office review, the general (deputy general) commanders for approval and then reported;
e) emergency response in the occurrence of new situations in a timely manner to supplement the report.
9, the scene of the emergency disposal guiding principles
9.1 public **** gathering place of fire, explosion, building collapse, etc.
public **** gathering place of fire, explosion, building collapse, etc., the emergency disposal should be guided by the following principles:
a) take isolation and evacuation measures, traffic control around the scene of the incident, to avoid unrelated people to enter the incident occurred in the dangerous area, and reasonable deployment of fire and rescue forces; in the safe area to set up a point of security, and the implementation of security alert;
b) timely rescue of the injured or sent to the hospital for treatment, and disinfection of the scene;
c) the organization of firefighting, engineering forces, the scene of the implementation of the rescue and engineering rescue
d) public **** gathering place has an omen of explosion or signs of building collapse, direct all the people on the scene to immediately evacuate to a safe area;
e) the use of sound amplification equipment to the surrounding public publicity of individual protection precautions, evacuation and escape methods and other general knowledge of emergency safety, to stabilize public Emotions.
9.2 public *** gathering place in the event of extrusion, stampede, etc.
public *** gathering place in the event of extrusion, stampede, etc., the emergency response should follow the following principles:
a) quickly set up evacuation of the safe channel, evacuation of the scene and the surrounding public to a safe area, the implementation of public security vigilance;
b) cooperate with the local public security, armed police and firefighters to quickly rescue the victims of extrusion and stampede. b) with the local public security, armed police and firefighting forces to quickly rescue the crowd was squeezed and trampled, to prevent the situation and the number of casualties to prevent the expansion of;
c) timely rescue of the injured or sent to the hospital for treatment;
d) the use of amplification equipment to the public around the public publicity of the individual protection precautions, evacuation and escape methods and other common sense of emergency safety, to stabilize the public mood;
e) cooperate with the local government's emergency response.
f) the local government's emergency response.
10, emergency termination
After the emergency treatment, the scene of the Emergency Command Department to confirm that meet the emergency termination conditions of the comprehensive emergency response plan, reported to the Emergency Response Center Office, the Emergency Response Center can be issued emergency termination instructions.
11, Appendix
11.1 Annex I: Emergency Contacts
Performance Site Safety Emergency Response Plan Part 41, Purpose
In order to cope with the *** sudden power outage, rapid and orderly organization and restoration of power supply, to ensure personal safety and Reduce equipment and property losses, promote the institutionalization and standardization of emergency response, combined with the actual situation of our units, the development of this plan.
2, the scope of application
This regulation applies to **** jurisdiction within the power outage emergency work.
3, responsibilities
Do daily safety power supply work, the implementation of the production safety responsibility system, to prevent the occurrence of accidental power outages, the occurrence of power outages, power outages in a timely manner to do a good job of emergency response to power outages, as soon as possible to restore power supply.
4, emergency procedures
4.1 Planned power outage emergency procedures
4.1.1 The duty officer in the notification of power outage phone or other forms of power outage notification, you must ask the time of the power outage, stop for how long and the reason for the power outage, make a record and report to the property office.
4.1.2 After confirming the information about the power outage, the property office will notify the lobby staff by phone, and the staff will send notices to the various departments in the power outage area of the office building.
4.1.3 After sending out the notice of power outage to each department, according to the power outage plan formulated by the department, do the work of power outage reversal.
4.2 Accidental power outage emergency procedures
4.2.1 In case of sudden power outage, first of all, we should find out the cause of the power outage, whether the equipment in the distribution room is damaged, the switch is tripped, such as reporting to the supervisor, requesting instructions for reverse operation and contacting the relevant maintenance personnel as soon as possible to repair, remove the faults and then restore the power supply.
4.2.2 The utility power supply line accident caused by power outage, the first time to ask the competent leadership to reverse the operation, to be completed after the completion of the repair to restore the power supply.
4.2.3 Office staff to confirm the cause of the power outage should be promptly notified to the head of each department and the relevant duty positions.
4.3 After the power outage occurred, the security guards immediately went to the building with the fire maintenance personnel to check the operation of the elevator, found that the elevator shut down immediately in accordance with the elevator trapped emergency plan to rescue.
4.4 If a sudden power outage, is on duty at night, the Security Department should maintain good security in the building, directing the staff on duty to activate the emergency lighting, candles and other backup lighting, pay attention to prevent fires, while paying attention to anti-theft, to prevent burglars waiting for an opportunity to mix into the building to steal.
4.5 assigned to guard the office, the duty room, patiently receive the staff in the office building inquiries, do a good job explaining and guiding work.
4.6 Detailed records of the beginning and end of the incident, the cause of the blackout, response measures and the damage caused.
4.7 Preventive measures for sudden power outages:
4.7.1 Fire maintenance personnel should always check the emergency lighting and emergency broadcasting system to ensure normal.
4.7.2 Fire maintenance personnel should be skilled in operating the basement power distribution room low voltage inversion operation procedures.
Performance site safety emergency plan Part 5
In order to ensure the safety of the majority of participants, teachers, students and parents through the extraordinary period, can comfortably deal with unforeseen emergencies, the Rehabilitation Center has formulated this emergency treatment plan.
First, emergency personnel preparation
1, the establishment of emergency working group.
Group leader: Li Changyou
Group member: Lu Baolong is responsible for the rehabilitation center staff and evacuation of participants.
Li Bo is responsible for organizing the living teacher to lead the children in an orderly evacuation of the two security gates and the main entrance
Sun Guihua is responsible for the alarm, press the doorbell of the hospital, and respond to the fire truck
Liu Fengxue is responsible for the integration of the kindergarten
Bao Jianjun is responsible for the evacuation of the parents and evacuation.
2, the implementation of the first-ask responsibility system. No shirking of responsibilities, timely handling of emergencies (such as the first emergency report; call 119; stabilize participants, teachers and students, and contact with parents of young children, etc.).
3. All the well-wishers and volunteers who participated in the May 19th performance and the charity organizations are forbidden to bring flammable and explosive products into the performance venue, and smoking is prohibited after entering the venue!
Second, emergency supplies preparation
Emergency supplies reserve. The first thing you need to do is to get your hands on a fire extinguisher, a fire hydrant, a fire extinguisher, and an access road sign.
Third, emergency procedures to prepare
1, fire once occurred, must immediately call for help, and the use of the second floor of the electric bell to the internal alarm, and at the same time call the 119 fire alarm phone, send someone to meet the fire trucks, alert the fire scene, if the participants and the children have not left the park, the first to start the emergency evacuation of the participants and the children's emergency evacuation emergency plan!
2.
2, unit leaders must rush to the scene to organize and direct the fire fighting work. Organize staff to carry fire fighting equipment to the fire scene collection, according to the fire situation targeted fire fighting.
3, according to the fire must be put out before, decisively cut off the power supply, turn off the gas valve, emergency transfer of flammable, explosive, toxic and hazardous items.
4, the fire fighting command should quickly determine the direction of the fire, fire characteristics, clear direction of the main attack and siege; orientation. To examine the situation, in the fire-fighting power than the fire, decisively take the quick-fighting tactics; in the fire is greater than the fire-fighting power, to take the "first control, after the extinguishing" fire-fighting tactics, all-out control of the fire range, waiting for the back-up forces.
5, in the public security fire department arrived, the fire scene command by the public security fire department command, unit leaders to cooperate fully, and organize internal forces for rescue, evacuation, alert, etc., until the fire can be completely extinguished.
6, after the fire is extinguished, we must organize forces to protect the scene, pay special attention to prevent the resurgence.
7, closely cooperate with the public security and fire departments to carry out on-site investigation and investigation of the cause of the fire.
;