Maintenance Specialist 2022 Year-End Summary Report Template (Selected 6)

? It is time to write a summary of the end of the year, many people do not even know the template of the work summary report, in the following is my carefully collated "maintenance commissioner 2022 year-end work summary report template (selected 6)", for your reference, I hope to be able to help you.

Maintenance Commissioner 2022 year-end work summary report template (selected 6) a

? Time passes, snap your fingers, 20__ year is nearing the end, looking back at the upcoming past year, yesterday's work is still vivid in my mind.

? In this year, I continue to strengthen the study and practice, in the work I do not miss every opportunity to learn, learn from the technicians with a humble heart, mastered the network transmission map of __ base stations in the maintenance area of my county.

? In the base station maintenance, monthly base station inspection and routine maintenance work are carried out in accordance with the plan, base station inspection are over target completion, important base station to do at least two times a month inspection, capacity station inspection once a month.

? The base station of the incomplete supporting facilities and base station problems in a timely manner statistical reporting, part of the base station for standardization of remediation, the county ___ base station (including repeater) for the asset inventory; in the base station troubleshooting, usually to do more to learn about the base station related knowledge, summarize the fault experience, in the receipt of fault notification, you can make a more accurate fault pre-determination, in the face of the failure to accurately locate the timely processing In the establishment and improvement of the basic information of the base station, do the equipment has to be replaced, the information should be updated.

? Rich practical experience is inseparable from the deep theoretical knowledge as a foundation, due to professional reasons, I used to undergraduate courses in computer science and technology have some differences, in the case of a deep sense of theoretical knowledge is insufficient, I not only in the work of learning, and actively participate in the company's organization of a variety of training.

? In my spare time, I am trying to study the theoretical knowledge of communication.

? I use my usual spare time to study the theoretical knowledge of communications on the Internet, combined with practical experience in the work, so that I have a clearer idea of fault analysis and treatment, I believe that after the next few years of learning, will play a great role in promoting my work, so that I work in a clearer way of thinking

? In my usual work I always pay attention to the serious implementation of the rules and regulations, obey the command and scheduling of the maintenance station and the project department, complete the personal operation plan on time, fill in the work record carefully, implement the operating procedures according to the requirements, and do not do beyond the scope of duties without approval.

? And can conscientiously implement the preventive maintenance program, truthfully record the test data, timely detection of hidden equipment failures and make the appropriate treatment, and at the same time, the major failures to inform the relevant departments at higher levels.

? Ensure that network equipment is maintained on time, faults are handled in a timely manner, and network equipment operates normally.

? At the same time, I pay special attention to the care and proper use of tools, instruments and technical information in the work.

? To do "work for a good job, must first sharpen their tools".

? Although I have made some progress in the past year with the help of all of you, I y realize that my experience in dealing with failures is not rich enough, and my ability needs to be further improved.

? A year is over, I need to summarize the experience, appreciate the lessons learned, and the process of summarizing is also the process of envisioning future work, self-improvement.

? A new year means a new starting point and new challenges, I am determined to redouble my efforts in the future work, seriously practicing the "____" concept of the culture of the B side, and constantly improve their technical skills and work efficiency, and gradually solve the problems in the work, for the development of the enterprise to contribute to all of their strength.

Maintenance Commissioner 2022 year-end work summary report template (selected 6) Part II

? Looking back on this year's work, I am in the company's leadership and the support and help of colleagues, strict requirements for themselves, in accordance with the company's requirements, to complete their own work.

? Through a year of study and work, there is a new breakthrough in the mode of work, the way of work has been a big change, is now summarized in the work of the year as follows:

? First, responsible for urban 23 base station inspection and troubleshooting work, since the maintenance of base station fixed assets inventory, the verification of integrated asset management.

? (Adjusted in June 20__, before the adjustment was more than 60 self-maintained macro base stations, more than 40 self-maintained micro base stations).

? Second, is responsible for the urban area of the transfer of power base station and to the Electricity Bureau settlement base station of electricity, lease fee settlement and budget reporting, report statistics reporting, electricity settlement of new base station location suppliers to increase the work, and the Ministry of Planning and Construction to verify the location of the new out of the electricity base station work, to solve the expiry of the contract of the electricity lease fee negotiations and disputes to solve the problem, and so on.

? (As of December 28, 20__ lease fee settlement 16; transfer power supply electricity bill settlement 139 locations; to Longsha, Tiefeng, Jianhua, suburban, railroad and other power supply bureau monthly settlement of about 230 invoices).

? Which to Longsha, Tiefeng, Jianhua, suburban, railroad and other power supply bureau monthly settlement in October 20__ after the apprentice Mi Xinxing responsible.

? Third, with Wang Shun*** with the responsibility for base stations (macro cellular, micro cellular, WLAN) contract signing and negotiation work.

? Fourth, participate in the initial inspection of the base station of the micro base station.

? Require the constructor to solve the problems found in the acceptance work in a timely manner.

? Fifth, to complete the base station maintenance center of the internal and external training work, the development of training plans, requirements

? The return of external training personnel to carry out the internal training work of the base station center to achieve the center of knowledge and on behalf of the maintenance staff *** with the popularity.

? Implement a rotational internship training system for generation and maintenance personnel.

? On behalf of the maintenance company's maintenance staff, to the mobile branch network base station maintenance center for rotational internship training, training period in accordance with the mobile branch network base station maintenance center staff management, faults in the field for troubleshooting, no faults when learning the technical theory, the development of a detailed, comprehensive assessment and evaluation of the rules and regulations, and effectively enhance the technical ability of the maintenance staff and the overall quality of the technical skills.

? Sixth, participate in the city's emergency communications security work, in September 20__ with Wang Lixia and other center staff **** with the participation of flood control emergency inspection work.

?20__ year participated in five emergency communications security work, including emergency communications vehicles 4 times.

? Strengthen their own emergency communications security work content and process. Learning, understand their own responsibilities in emergency communications security work.

? Seven, regularly reported to the provincial company's classic base station failure cases 2 per quarter, in addition to reporting Qi Tiefeng Shuguang police station dispute handling cases won praise, and part of the content can be used as a reference in the residential area to build the station in the early preparatory work.

? Eight, responsible for 2G, TD base station failure and engineering relocation work and other technical support support work.

? Completed the technical support work for the failure of 2G and TD base stations in the whole region, and completed the support work for the relocation of base stations in Gannan, Keshan, and downtown areas, among which the relocation of Gannan base station is the first case of the overall relocation of boarding house base station, which is of great significance for the work of relocation of boarding house base station.

? Nine, responsible for base station maintenance work innovation, personal report base station innovation 15, in the first quarter of 20__ company-wide innovation activities held in the honor.

? He wrote his own "base station related data management methods", "base station warehouse access management system", "base station fusion account management innovation" and other innovations, including The "Base Station Integration Ledger Management Innovation" was declared as the management innovation achievement of China Mobile Heilongjiang Company.

? Tenth, complete the equipment leasing to Unicom's *** enjoyment room and *** enjoyment room power meter reading, electricity billing work.

? XI, responsible for the coordination of TD spare parts dispatch work.

? Ensure that the whole district can handle TD faults in time.

? XII, 20__ years **** with apprenticeship 3 people which has been out of the master can independently complete the work related to base station maintenance.

? Thirteen, as a base station maintenance in the staff of the B corner, in the vacation period to complete its repeater room management and base station failure analysis and weekly report on the work.

? XIV, complete the 20__ year base station, WLAN weekly report summary and reporting work.

? (After October 20__ to the apprentice responsible for summarizing and reporting)

? Fifteen, responsible for the region's base station four generations of replacement of statistics and coordination work, engineering information release.

? Cooperate with Jianhua Construction Department to complete the replacement of base station macro station and micro station, and complete the statistics of replacement cabinets and boards into the database.

? Coordinate with the warehouse management department to store the replacement cabinets and boards.

? Apply for sheeting to cover the replacement cabinets and boards.

? (After August, 20__, the apprentice is in charge of counting the replacement cabinets and boards into the warehouse)

? Sixteen, complete the foreign language schools, airports, railroad engineering schools, Baihua Garden, Baihua Red House, Baihua Technology Electronic City, Nenjiang Hotel and other base station dispute issues.

? As well as the Ministry of Planning and Construction requires the medical school South, Qi Da North and other base station inbound construction work issues, etc..

? XVII, coordinating the provincial company cashier, Industrial and Commercial Bank of China station before the branch **** with the resolution of the issue of remittance about the railroad 15 corporate subordinate account.

? Eighteen, complete the university student internship, base station maintenance center side reception and explanation work.

? Nineteen, responsible for TD-lte, td seven involved in the work of the base station maintenance center, such as with the optimization center and the Ministry of Planning and Construction site selection.

? The above is my work this year.

? In the future work, I want to strengthen my own learning and improve the business level.

? Ensure the normal operation of the work of this post, can treat all work tasks with the right attitude, love their jobs, serious efforts to carry out the actual work.

? Actively improve their own business quality, strive for work initiative, with a strong sense of professionalism, sense of responsibility, and strive to improve work efficiency and quality of work.

Maintenance Commissioner 2022 year-end work summary report template (Selected 6) Article 3

? I Yongchang maintenance station in January 1, 20__ to establish the site, accept the mobile base station on behalf of the maintenance work, in this year January-July *** counted maintenance 39 base stations, August new delivery of 8 base stations, as of now *** maintenance 47 base stations.

? In the maintenance work we are active, careful, realistic and conscientious implementation and completion of the base station belonging to the monthly, quarterly, semi-annual and annual maintenance work related to the mobile company's recognition.

? Here I will do a summary of the work of the year 20__:

? First, 20__ annual work content and completion of the situation:

?1, the base station daily inspection work: in each month of the base station inspection work are able to understand the operation of the equipment in a timely manner, the record of the equipment of the station data, and the production of the electronic archive database, even if it is to update the existence of security risks of the equipment can be dealt with in a timely manner, the specific inspections, The scope of inspection includes: base station main equipment, base station AC and DC power distribution equipment, base station batteries, base station air conditioning, base station power environment monitoring equipment, base station transmission equipment, base station towers, base station antenna feeder system, base station equipment room safety facilities.

? Inspection items include: operating voltage, operating current, power wiring, the presence of alarms, operation, equipment connectivity, environmental health, and the various security risks that exist in the base station.

?2, the base station fault handling: after receiving the engine room (OMC) fault dispatch order, our organization has the first analysis of the cause of the failure, with all the necessary tools, equipment, and immediately rushed to the scene, did not blindly set off to deal with the work before departure to do a good job, and secondly, to deal with faults in strict accordance with the process of dealing with the faults, and therefore did not cause a long time to deal with a fault.

? In this year's troubleshooting there are main equipment failure, transmission failure, antenna feeder failure, dynamic ring failure, power failure, air conditioning failure, battery failure and a series of faults, are not a long time to deal with, dealing with faults more frequently is the main equipment, transmission, antenna feeder, power failures, these are the core faults of the base station on behalf of the fault processing, processing we have done fast, rapid and accurate.

?3, base station outage power generation repair work: this year, more power generation is March, April, May, June, July, August, other months of power outages are not too frequent.

? After receiving the power generation orders, we can quickly set off to the base station power generation, did not cause a large number of base stations due to power outages caused by the withdrawal of service, some base stations are outdoor stations, there is no backup battery, power outages that withdrawal, encountered in these stations power outage we must even if the power to go quickly to the power generation, to reduce the withdrawal of the length of time.

?

?4, the installation of base station lighting: we maintain the base station, basically no lighting, in April before we completed the installation of lighting for each base station, in August, the new delivery of the base station, in September have completed the installation of lighting.

?5, the replacement of base station batteries: we maintain the base station, there are some base stations have a short battery discharge time, causing the base station to retreat from the problem, even if we do the discharge test, contact the mobile company to do processing, in October to replace the battery pack of such base stations, so it seems that due to the poor performance of the batteries, caused by the base station to retreat from the service are reduced.

?6, the base station of the hidden trouble of the investigation and processing: in the monthly routine inspection work, we counted the station of the legacy of the problem, there are power lines exposed, the engine room door bad, engine room leakage, the yard has weeds and other related hidden problems have been done to deal with the work of the comprehensive and reported to the mobile company.

? Second, the work performance:

?1, in this year's inspection work, we are not afraid of tired, not afraid of dirty, careful, serious attitude to do the daily inspection work, after inspection of the base station so that people can look at a comfortable feeling of the stations have a detailed information card and database statistics.

?2, troubleshooting in a timely and accurate manner, any failure did not take a long time to deal with, the difficult failure to do a failure analysis report, to achieve the trust of the mobile company.

?3, power generation repair work was done in a timely and rapid manner, did not cause ultra-long time base station withdrawal.

?4, completed the installation of lighting for all base stations,

?5, poor battery performance of the base station, discharge test, contact the mobile company, proposed the replacement of the battery to solve the problem of the program, at the end of October to complete the replacement of battery packs in only three base stations.

? There are also some batteries with corrosion of the connecting strips, which we have also dealt with.

?6, the existence of various base stations of the legacy problems, hidden problems to do a comprehensive treatment, for example: Jinchuan East base station security door is bad, even if we contacted the mobile company, get the permission to replace the door, in the shortest possible time to replace the security door.

? Juba, Tuanzhuang and other base station power lines are exposed, we even if the bandage treatment, such phenomena took photos, reported to the mobile company.

? Third, staff training:

? In this year I have made progress in staff training in an orderly manner, training content has skills training, safety knowledge training, company system training, etc., have done in-depth training, through the training has reached each employee skills to improve, safety awareness to strengthen, clear the company's system to achieve the purpose.

? In the training aspect focuses on doing the skill training, make the staff master the technology, deal with the failure to be able to handle, in the next station of the equipment can patiently explain to the staff, let the staff have a comprehensive understanding of the equipment.

? Fourth, the work highlights and shortcomings:

? Under the guidance of the leadership of the project department, Yongchang maintenance station gradually entered a stable period, every month on time to complete each base station maintenance tasks, and minimize the base station withdrawal rate and processing time, base station troubleshooting work attitude and sense of responsibility is increasingly accumulating and maturity, all employees actively look for and improve their own values and sense of responsibility, so as to make a difference in the daily work.

? But there are still our shortcomings:

?1, in dealing with base station failure staff experience is not comprehensive enough, in the new year on the staff skills training to tighten, so that each employee to become a qualified base station maintenance staff.

?2, the integration of base station rectification is not in place, and strive to do better in the new year.

?3, the staff's work attitude and sense of responsibility is lacking, in the new year to strengthen the team spirit of the staff, take the initiative to talk to each employee, in the monthly meeting to let each employee speak their minds, including the work of the proposal, the work of the problems in the work of the full discussion, to fully mobilize the enthusiasm of each employee.

? So that each employee can better complete each job.

? V. Maintenance work and other suggestions and comments

? With the refinement of the maintenance work, the training of relevant professional human resources reserves, in order to our maintenance work more focused, efficient work, we recommend that the company to carry out professional skills of each site training, increase some spare time activities to improve the enthusiasm of employees to learn and work enthusiasm.

? The year is coming to an end, in this year to start after the key time.

? In response to the leadership of our Yongchang maintenance station on behalf of the earnest criticism of the work of the guidance, we will do our part in the attitude and enthusiasm to work, to make good results, the goal of our company to create a more high-quality, efficient results.

? Please leaders believe, pay attention to our improvement.

? Thank you for all the leaders have been working on our strong support and trust! We Yongchang maintenance station is very confident in themselves, will do a good job, even better!

Maintenance Commissioner 2022 year-end work summary report template (Selected 6) Article 4

? Job Description:

?1, according to the regional store opening plan and the adjustment program of each store, the development of idle asset utilization plan and daily asset management program.

?2, establish and improve the management of energy saving and consumption reduction, in conjunction with the Department of Maintenance to confirm the energy saving measures and programs.

?3, the establishment and improvement of controllable cost of all work standardization, normalization, platform management. Data embodied.

?4, the store's daily operating costs of material consumption, repair and maintenance costs, rectification costs, water, electricity and gas data for regular analysis, and based on the results of the inspection and analysis of the key points of the control recommendations.

?5, the store's daily contract, payment process and other latitude supervision, follow-up.

?6, the annual controllable cost control data for statistics and analysis.

?7, the housing lease contract, the relevant costs incurred to rationalize the sorting and analysis.

?8, organization and guidance to stores on energy saving, cost control node training;

?9, on the contract, rectification costs, such as the implementation of random checks, supervision.

?10, the establishment of the relevant costs of detailed files, including maintenance contracts, rectification contracts, material consumption contracts, rental contracts and other records.

? Job requirements:

?1, master the necessary supermarket equipment, engineering decoration, cold chain, electromechanical basic knowledge.

?2, familiar with the systematic process of new product upgrading;

?3, very strong planning, control, coordination ability; excellent budget management, communication and coordination skills, comprehensive analysis ability.

?4, accept the third-party preparation of the box < / p> Maintenance Specialist 2022 year-end work summary report template (Selected 6) Article 5

? My name is ___, a technical manager in the ___ district. Time is like a shuttle, 20_ year is nearing the end, the past year can be said to be an extraordinary year, I smoothly transformed from a trainee to a formal technician, the transformation process is engraved in the bones. In this year, I have been in Hongshagang mining area, Jinggezhuang mine preparation area to internship, and finally in the ventilation area apprenticeship, after the transfer to become a formal technician. Now the work of the year from the following aspects to do a summary.

? First, to strengthen the theoretical knowledge of learning, and strive to improve the level of business and technical skills, solid in-depth site, fast into the material

?1, regardless of whether it is from the previous internship unit or the current work unit, the theoretical knowledge of the study has never ceased, coupled with the mine leadership to focus on the cultivation of technical personnel, every quarter of the "learning to mention to do promote "activities, let me learn a lot of practical knowledge. In addition, in the work of some do not understand or unclear place, actively find related books and regulations and measures to seek answers.

?2, according to the requirements of the district leadership, I am in charge of the ventilation area facilities pair and processing group two teams. The facility pair is responsible for the construction and maintenance of all ventilation facilities in the mine. So far, I have written 7 safety measures for the construction of ventilation facilities and the design of water injection for the mine's ___ synthesized mining face. Although the construction safety technical measures for ventilation facilities are not as complicated as the construction measures of production units, I still insist that I personally go to the site to investigate each measure, record the site data and roadway layout in detail, carefully consider the actual situation when preparing the measures, and draw on the measures of the production units regarding auxiliary transportation, so as to gradually strengthen this weak link in our area. The construction safety technical measures were made more perfect. The measures I prepared were unanimously recognized by the district leadership.

?3, as a young technician, the most lacking I think is the field experience. So I insisted on going deep into the well often, and from the date of transfer, the number of times I went down the well every month was more than ___ times. Which includes __ times a month staring at the post. And all of them go down the well with tasks and problems, including researching the situation of the construction site and participating in my mine's monthly one-pass, three-prevention standardization inspection. Especially in ___ month, carbon monoxide was found to be seriously over the standard in ___ area of our mine, which might cause fire if not handled in time. The leaders of the district attached great importance to it, and I also gave up the opportunity to rest on the National Day to actively participate in the treatment, went to the __ area with the leaders once a day, and decisively took measures such as drilling and detecting and tunnel slurry spraying to treat the area after the study of the district, and achieved good results. And in the aftermath of the long-term record of the region's various gas data, made into a curve graph analysis.

? Second, strengthen the political theory learning, firmly establish a correct world view, outlook on life, values

? In the busy work of the spare time, and constantly strengthen the political ideological theory and related business learning, serious study of advanced theoretical knowledge, to maintain a firm political beliefs, strengthen their organization and discipline; constantly amend their world view, outlook on life and values.

? Third, in life, to strengthen teamwork, and actively integrated into the class team

? In the work, I can consciously and team team together, strictly do not be late and leave early, follow the class, duty. The measures responsible for the timely preparation, actively implement the tasks arranged by the leadership, take the initiative to technical experts and experienced employees to ask for advice, exchange their ideas. In order to better serve the district team.

? Of course, I also found myself in the work of the following shortcomings:

?1, for the superior policy, documents and spirit of learning depth is not enough to recognize the understanding is not very to.

?2, focus on the technical aspects of the work, ignoring the organization and coordination of work.

?3, the work of the occasional hasty and impatient, the expression of some unsteady.

? For the work of 20 _ achievements I will be correctly viewed, continue to maintain, and for their own shortcomings I will actively correct. Firmly establish a correct outlook on life, world view and values. Love and dedication. Improve the comprehensive quality, strive to achieve success, and strive to be an excellent engineering and technical personnel. Contribute all your strength to the bright future of my mine.

Maintenance Commissioner 2022 year-end work summary report template (selected 6) Part VI

? First, production equipment maintenance work.

?1, strengthen the daily inspection management of equipment. I workshop at the beginning of the year according to my workshop equipment is relatively decentralized, the characteristics of a wide range of points, to strengthen the daily inspection work, the development of a strict inspection system. Inspection of equipment developed inspection routes, daily inspection to the implementation of the person, by the technician, the director of the inspection, supervision, and the implementation of an effective system of rewards and penalties. This will enable the workshop personnel to know the operation of the equipment. In the equipment maintenance, the problematic equipment can be re-inspected. This not only saves maintenance time, but also can solve the problem in a targeted way to ensure the quality of maintenance. Power workshop j103c 3 # pulverizer motor is found in the inspection bearing sound abnormal, timely maintenance to eliminate the hidden danger. Water supply and drainage workshop 450-1a, 450-1c, 450-1d, 450-1e cooling tower fan in the inspection found motor blade broken, timely replacement, to avoid motor burned due to overheating.

?2, centralized technical backbone to solve technical problems. Power workshop coal belt plc control system often appear suddenly stopping fault, control loop check many times still no result. In order to solve this problem workshop organizing technical personnel to attack, the use of not on the coal time to repeat the test finally finally found the problem, the original is the crusher's startup current is too large on the plc switching power supply impact, plc sudden loss of power caused by 1 # slag rake inverter installation dcs can not speed, slag rake manufacturers debugging staff can not find the problem. Our workshop was informed of the situation, immediately arranged workshop technicians to the scene to solve the problem. Finally found that the frequency converter has a few parameters are set incorrectly, the external wiring is also missing two, these problems will be solved, the slag raking machine running normal.

? Second, the production equipment technology transformation project work.

? In order to production can reach the production efficiency, the company carried out a lot of transformation of the production system of the first phase. In these technological transformation, our workshop fully cooperate with the process of electrical technology design, equipment installation and construction. The design and installation of the electrical part of these technical modifications are all very successful. Specifically as follows:

?1, sewage treatment station grey water filter tank electrical control design and equipment installation

?2, desalination station in the neutralization of submerged pumps to increase the power of the electrical installation

?3, low-voltage distribution room capacitor cabinet modification

?4, cooling tower fan motor air blades modification

?5, supply and drainage of chlorine bottles between the gas cylinder room, the Quality Inspection Center Lighting fan system renovation

?6, oxygen pump two inverter replacement, control loop modification

?7, p1605 have station control loop modification

? Third, the annual overhaul work.

? In order to improve the sense of responsibility of each worker, to ensure the quality of overhaul, my workshop has implemented a work order responsibility system. Each work order records the content of each job, the work completed by the person, the faulty part, the completion of the situation, the person in charge of safety, etc., and also requires the use of acceptance, acceptance of the work order after the archives, in order to overhaul the quality of the problem of the number of the person responsible for the relevant punishment. This greatly enhances the responsibility of the overhaul personnel to ensure the quality of overhaul. Electrical maintenance, safety is a big problem. Due to the many types of jobs involved, in the power outage overhaul, in order to avoid misoperation of the power supply, my workshop in the overhaul before the team leader to carry out strict requirements. When stopping and sending power, we should strictly implement the operation ticket system and operate according to the regulations, which ensures the safety of the overhaul personnel. After we take the above measures, after my workshop overhaul personnel *** with the efforts, finally quality and quantity of the successful completion of this overhaul task, for the successful completion of the overhaul work has made due contribution. This overhaul *** completed:

? Since ___ July I came to ___ a park work now, has been more than a year's time. In this year, I have been working in the project department, responsible for electrical construction site management and technical guidance work, with their own efforts and leadership, from an ordinary electrical supervisor, and then was promoted to part-time electric instrument workshop technician. During this period, I am responsible for the electrical construction supervision of the workshops belonging to the north and south plants, in addition to the duties of the technician of the electro-mechanical workshop. Although the workload is much heavier than before, but gives me a comprehensive understanding of the company's entire electrical system, strengthen my knowledge and mastery of the company's electrical system, and improve my ability to independently analyze and deal with some of the various types of accidents occurring in the system, for me to further engage in the work of electrical technology to lay a good foundation.