1, the purpose of the preparation of the plan
In order to effectively deal with sudden flood events, flood emergencies during the flood season on the Group, and customer property safety caused by the adverse effects of the incident to a minimum, the development of this plan.
Scope of application
Applicable to the property range of flood emergencies under the emergency preparedness and response should be made.
Institutional responsibilities
3.1 Command Organization Emergency Commander: Emergency Deputy Commander: Command Members Rescue team members: by the Security Department, the Engineering Department, all for the main players, other departments staff for the assistants. 3.2 Command Functions
Supervise and check the departments according to the development of the disposition of emergencies plan in a timely and effective;
Organization To the higher authorities to report information about emergencies;
Property departments, agencies in accordance with the principle of classified responsibility, respectively, responsible for the disposal of all types of emergencies, the organization of the rehearsal plan.
Responsible for convening the scene of the departments involved in the work of the scene responsible person, clear departments in the work undertaken in the emergency
Organization of the delineation of the scope of the scene, the implementation of the necessary control;
Research on the scene of the disposal program, the development of specific measures, to decide on the personnel of the mobilization, support and rotation
Mastering of the progress of the work in the case of insufficient manpower and material resources. In case of insufficient manpower and material resources, apply for support from the Institute or outside. Other departments and divisions within the Institute will actively cooperate in the handling of emergencies according to this plan.
Supervision and inspection of all relevant departments according to the handling of emergencies plan to do a good job related to emergency preparedness;
4. Duties of the departments 4.1 Security Department Scope of Responsibilities 4.1.1 notify the service center, contact the commanding officer members; 4.1.2 contact the park property, control of the relevant facilities; 4.1.3 organization of the public area of the rescue, management of flood supplies; 4.1.4 outreach to the fire public security, to the "119" to the "119". To "119" alarm; 4.1.5 according to the level of flooding, play the evacuation broadcast; 4.1.6 confirm the key parts of the organization to rescue supplies; 4.1.7 to ensure the integrity of the facilities, flood control tools are complete. 5. Engineering Department Scope of Responsibilities 5.1 out of the risk of manned, to ensure that the equipment is in good condition; the water and electricity required for the relief of engineering to fully protect. 5.2 organization of facilities rescue, the project is fully guaranteed; 5.2 Organize facilities for rescue, management of flood control supplies; 5.3 Provide the rescue required to rescue valuable materials; 6. 6.1 Responsible for the management of rain gear, to assist the disaster relief personnel; 6.2 with the rescue work, care of rescue materials; 6.3 contact medical units, to provide relief environment. 7. 7. 7.1 Organization of the Department of Administration's scope of responsibility to transport goods, transfer of important items; 7.2 liaison with the commanding officer, do a good job of appeasement. 8.1 Organization of the Department of the responsibility to transport goods, transfer of important items; 7.2 contact commanding officer, do a good job of appeasement. 8.Key Flood Control Parts
8.1 According to the characteristics of the flood control, to determine the key flood control parts of the CSR building for the distribution room, elevator shafts, the financial room, archives, offices and so on.
9. Flood control facilities
9.1 in the key flood control parts should have the appropriate facilities: drainage pipes, pumps, sandbags, water barriers, etc.
10. Supervision and Inspection System
10.1 property security department engineering department should be done as early as possible before the rainy season to take precautionary measures, designate a person on the sandbag stock, pump equipment for regular inspection;
10.2 timely inspection of the management of the three ditches (gutter, gutter, gutter) is smooth;
10.3 check the roof doors, windows have been closed;
10.4 flood control should be prepared for the full range of equipment, maintenance of pumps so that it reaches a state of readiness;
10.5 in the imminent arrival of the gale should be unannounced inspection of items that may fall on the inspection of hidden dangers immediately rectify the problem. The hidden dangers are immediately rectified.
11. Flood control and disposal procedures
11.1 Any time the information about flooding, the security department director immediately notify the emergency commander.
11.2 When general flooding occurs, the Security Department recommends that the Department of Engineering of the large property to open manhole covers in a timely manner to speed up drainage.
11.3 serious flooding occurs, the security department should promptly notify the property minister, informed of the disaster please indicate whether to 119 alarm. Notify the large property *** with the rescue.
11.4 Organization of the Department of Security flood rescue team to assist in carrying sandbags and to prevent the flow of water into the machine room, elevator shafts, financial rooms, file rooms, offices, etc.;
11.5 If the water may flow into the elevator, notify the Department of Engineering will be likely to enter the elevator elevator to a high place;
11.6 such as power distribution room \ elevator and other key parts of the water, will be initiated by the Ministry of Engineering Mainly responsible for the implementation of the "running water accident emergency disposal process"
11.7 Distribution room:
1, in the water spread on the channel to set up water-stopping sandbags or to take all other effective measures to prevent the water from spreading distribution room.
2. Close the electric switch of the flooded area to prevent personnel from being electrocuted.
3, the organization of forces using various means, including the use of brooms, water suction machine suction, drain the water, clean up the scene as soon as possible to restore cleanliness and dehumidification of electrical equipment, when confirmed that the moisture has been removed, the insulation resistance reaches the specified value, before the power test run (power in accordance with the "power distribution room reversal of the operation process" implementation), observation of no abnormality before being put into formal operation.
4, held a meeting to analyze the cause of the accident, summarize the lessons learned, and take measures to prevent similar accidents. And detailed records of flooding inspection report on the cause of flooding, treatment, and, as well as damage, preventive measures, and archives.
11.8 Elevator:
1, in the channel where the water spreads to place water-stopping sandbags or take all other effective measures to prevent the water from spreading to the elevator.
2. When there is a small amount of water ingress or seepage in the pit, stop the elevator above the second floor, stop operation and disconnect the main power supply.
3, when flooding occurs, should quickly cut off the source of water leakage, try to make the electrical equipment does not enter the water or less water. When the floor flooding and make the shaft or pit into the water, the car should be parked in the water level station on the second floor, stop the elevator disconnect, in order to prevent the car into the water.
4, the flooded elevator should be dehumidified, such as wiping, hot air blowing, natural ventilation, replacement of pipelines and other methods, to confirm the elimination of flooding, insulation resistance in line with the requirements, and after the test run without abnormalities, before putting into operation. The microcomputer control elevator, more careful inspection is required to avoid burning the electronic board.
5, in the resumption of elevator operation, should confirm that there is no water, no short-circuit phenomenon before use. For those in a hurry to use the elevator, can be used to dry the way (such as the use of electric hair dryer), to eliminate all possible short-circuit may cause the accumulation of water.
6, held a meeting to analyze the causes of accidents, summarize the lessons learned, and take measures to prevent similar accidents. And detailed records of flooding inspection report on the cause of flooding, treatment methods, and damage, preventive measures, and archived.