1, construction to ensure that the site, materials and equipment clean, hidden works in the closure before the need to dust and clean processing, and then handed over to the professional acceptance. Concealed surface layer must be maintained for a long time without dust, skinning and cracking, the ground and other decorative materials to do anti-static treatment.
2, dust indoor all pipelines through the wall at the cutout must be dust treatment, the gap must be filled with sealing materials.
3, in laminating, bonding veneer and other coating construction, the environmental conditions should be in line with the provisions of the material specification.
4, decoration should choose non-toxic, non-irritant, flame retardant, flame retardant materials, if you can not meet the flame retardant, flame retardant, can be coated with fire retardant paint. I hope to give a great praise