As we all know, after a project or project is completed, people from relevant departments will generally go to its construction site to check the quality of its completion, and some who fail to pass the inspection and acceptance may even ask for rework. However, we are still at a loss about the specific content of project acceptance, and we don't know what aspects it is to check. Here, the project completion acceptance report template will tell you the basic content of project acceptance.
the general project completion acceptance template mainly includes the following aspects. First of all, on the front page of its acceptance report, you need to have these information, the name of the project and its completion time, as well as the name or fresh seal of the acceptance unit.
the second is the arrangement of the acceptance department and personnel. It is necessary to write down the leaders of the acceptance and the professionals who carry out the acceptance operation in various fields in this report. The specific acceptance specialty of each acceptance member should be clearly written. Of course, during the acceptance period, there are also construction workers who talk about the construction process, and there are project supervisors who introduce their related work, and the contract awarding party of the project is also accompanied by the whole process.
Thirdly, the detailed information of the project and the detailed contents of the project review. The detailed information of the project includes the name and address of the project, various units (or individuals) involved in the project, the structural form, scale, number of floors and architectural style of the project, the start and end period of the project and the total cost of the project.
the main contents of the project review include: whether the project has been completed and reached the expected design; Whether the project is completed according to the contract agreed by both parties; Whether the drawings of the design review and other aspects of the project are preserved before the project starts, and the relevant data and documents during the project construction; Whether the materials, accessories, equipment, etc. of the project are in place; Whether the qualified documents for the quality inspection of the project are in place and complete, including the survey, design, construction and supervision units of the project; And the relevant warranty of the engineering construction unit about the engineering quality.
the last item in the template of the project completion acceptance report is the conclusion of its examination and acceptance, the signature of the person in charge of the relevant unit and the specific time and date.
model essay:
model essay on acceptance report [Part I: model essay on acceptance application report ]
1. Project completion:
The construction of No.1 and No.2 buildings in Xinlong Jiayuan, Shiquan County was started by the 11th Project Department of Shiquan County Housing Construction Company on November 15th, 29, and was fully completed at the end of March, 211, lasting for 16 months, according to the approved design scheme. Water supply and drainage works; Electrical equipment installation project.
II. Inspection results of acceptance conditions:
According to the relevant national regulations, the project has completed the main construction tasks according to the design requirements. The investment in the project is reasonable, the completion data has been fully prepared, the construction quality of the project has passed the quality inspection of the quality supervision station, and the < Engineering quality inspection evaluation report > , the project quality is qualified, and the formal acceptance conditions have been met.
III. Suggested acceptance time, place and participating units:
According to the completion of the project and the relevant requirements of provincial and municipal authorities, it is proposed that the completion acceptance of the 1 # and 2# buildings of Xinlong Jiayuan in Shiquan County be carried out on, and the acceptance place is in, and the participating units include the project legal person, design, supervision, construction and quality supervision. Sample acceptance report.
to sum up, the 1 # and 2# buildings of Xinlong Jiayuan in Shiquan County have met the conditions for completion acceptance, so please ask the higher authorities to arrange formal acceptance.
the 11th Project Department of Shiquan Housing Construction Company
[ Part II: Model Text of Completion Acceptance Report ]
I. Completion Report
(1) Overview
Project name, project location, construction basis, construction scale, standards and main contents, contractors, major projects and the construction process of important temporary facilities, etc.
(II) Project construction management
1. Organization and work of the project unit. Sample acceptance report. The project management system of the project unit, the organization setup and work of the higher authorities, quality supervision institutions and local governments serving the project construction.
2. Bidding management: the bidding situation of survey, design, supervision, construction, materials and equipment, the qualification of the winning bidder, the main tasks undertaken, etc.
3. Management of design change: handling of major technical problems in implementation and relevant information of design change.
4. Safety and quality management: safety and quality management system, safety and quality control measures, accident treatment results, civilized construction, etc.
5. Investment management: investment sources, investment control measures, approved budgetary estimate and actual implementation, release and completion of annual plan, and adjustment of budgetary estimate.
6. schedule management: planned control objectives and actual implementation of major project nodes, schedule control measures, etc.
7. contract management: the performance of the contracting unit, the settlement method of the contract price and the handling of special problems, and whether there is any project payment default at the time of completion.
8. Compensation for land acquisition and resettlement for construction: whether the land acquisition and resettlement can meet the requirements of construction progress, whether there is any violation of policies, the approved land acquisition and actual land acquisition, the handling of relevant land acquisition procedures, the use of land acquisition and resettlement fees, etc.
9. innovation achievements: technological innovations (new structures, new materials, new processes, new equipment, etc.) and management innovations obtained during the project construction.
1. Construction of clean government: clean government measures and implementation of clean government contracts, etc.
11. Others: information management and other situations that need to be explained.
(III) Previous acceptance
Previous completion acceptance, stage acceptance, special acceptance and other conclusions and the handling of problems left over from acceptance, etc.
(IV) Audit of final accounts of completion
Development of audit of final accounts of completion and audit conclusions.
(V) Trial operation of the project
The observation and analysis results of the project, the trial operation of the project and the exertion of benefits, etc.
(VI) Experiences and suggestions on project construction management
Combining with the characteristics and management process of the project, summarize the experience and lessons of project management, realize the enlightenment, and put forward suggestions on future construction, maintenance and operation management.
II. Design Work Report
(1) Overview
Briefly describe the design scope, main contents and characteristics, and the performance of the contract.
(II) Design quality management
mainly reflects the project design management organization and the allocation of main technical personnel; Quality management system; Design management measures (including mandatory provisions of engineering construction standards, design quality, time limit for a project guarantee measures, etc.).
(III) Design changes
Reflect the items, reasons and contents of major design changes, and their impact on engineering quantity, investment and construction period, etc.
(IV) Design service
Briefly describe the design disclosure and on-site service.
(5) design evaluation, experience and suggestions
engineering design effect evaluation, innovation effect, experience and suggestions.
III. Construction Work Report
(1) Overview
Briefly describe the construction scope, contents and contract performance, etc.
(II) Project management
The establishment of the project management organization, the main technical personnel and equipment, the safety and quality management system, and the construction management measures (including the guarantee measures for navigation, environmental protection and fire control during the construction period).
(III) Project Construction
Construction organization (including construction preparation, equipment and personnel input, overall progress and phased construction schedule arrangement, etc.), construction measures of major units, major quantities completed, project schedule control, reasons for early or delayed completion of the project, and handling of major technical problems, etc.
(IV) Construction technology
The above aspects are the basic contents of the template of the project completion acceptance report, from which it can be seen that the project completion acceptance report not only includes the construction process of the project, but also includes the preliminary design stage of the project and the related contents of the later project quality management. Although the template of the project completion acceptance report is only a few thin sheets of paper, it bears the painstaking efforts of all the people involved in the project, so take a closer look at the template of the project completion acceptance report!