The installation of pharmaceutical equipment should follow the following principles:?
1) When the installation of newer equipment such as linkage line and Shuang Ye sterilizer may pass through two areas with different cleanliness levels, appropriate sealing methods should be adopted while the installation is fixed to ensure that the area with higher cleanliness level is not affected. ?
2) For the installation of transmission machinery, shockproof and silencing devices should be added to improve the operating environment. During dynamic test, the noise of clean room should not exceed 70dB. ?
3) When transporting materials between rooms with different cleanliness levels, in order to prevent cross-contamination, the conveyor belt should not pass through the partition wall, but should be transported in sections on both sides of the partition wall. Conveyors sent to sterile areas must be transported in sections. ?
4) Production equipment for producing, processing and packaging highly allergic drugs such as penicillin, some steroid drugs and highly active and toxic drugs must be used separately. ?
5) Design or select light and dexterous conveying tools, such as conveyor belts, trolleys, launders, flexible nozzles, closed hoppers, etc. To facilitate the connection between devices.