Technician work summary 5
As a technician, the work will be positioned to assist in the work of the person in charge of technology and continuous learning to enrich, the following is what I have organized for you to summarize the work of the technicians, I hope to be able to help you!
Technician job summary 1
In the past year, I have been working in the project department, responsible for electrical construction site management and technical guidance work, with their own efforts and leadership, from an ordinary electrical supervision, and then promoted to the part-time electric instrument workshop technician position. Although the workload is much heavier than before, it gives me an opportunity to understand the whole electrical system of the plant, strengthens my cognition and mastery of the electrical system of the plant, and improves my ability to independently analyze and deal with the problems in case of various kinds of accidents occurred in the system, and lays a good foundation for me to further engage in the work of electrical technology. The following I assume the workshop technician work this year to summarize.
First, the understanding of the work of electrical instrumentation technician and attitude
I was appointed as a technician of the electrical instrumentation workshop, began to gradually enter this role. Although I previously assumed the post of electrical equipment in zz limited plant, high and low voltage electrical technology and equipment have a deep understanding and mastery. But since coming to the new site, in the process of electrical supervision work, feel the pressure to be a good qualified electrical instrumentation technician is increasing.
A huge number of electrical equipment; electrical equipment, involving a wide range of high and low voltage transmission, distribution, power supply and electrical maintenance and other aspects; new and old equipment mixing increased the chances of failure of electrical equipment and troubleshooting difficulties. In the face of this pressure, I feel the great responsibility. For the normal and stable operation of the plant's electrical equipment, to provide technical support, to deal with unexpected failures, has become the focus of my work. I believe that I have the ability to do this work well, the greater the pressure, the greater the motivation. In addition, I communicate with the workshop maintenance group, operation group and instrumentation group to understand the knowledge level of the existing staff and the current work in the existence of those technical problems need to be solved.
Second, this year's work
Workshop centrifuge, in the case of full material, can not start. I went to check and found that the centrifuge before starting, the load is too heavy. Frequency converter send power can not overcome this torque, resulting in the centrifuge can not start. After understanding the cause of the work, I reset the starting torque of the inverter and put DC braking resistor to prolong the starting time and ensure the normal use of the centrifuge. zz workshop main hot water solenoid valve, the circuit board is often broken, I analyzed that the work of the power supply is contaminated by the frequency converter and other DC electrical equipment, which leads to the superposition of the voltage, the formation of high voltage, resulting in the breakdown of the work of the circuit board. So I suggest the workshop to install a voltage regulator, separate power supply for instrumentation equipment, to ensure the safety of instrumentation equipment and operational stability. These are just a small part of my daily work, such unexpected accidents often occur, when I need to deal with, I will always be the first to come to the scene, as soon as possible, as far as possible for the workshop troubleshooting, to restore the normal operation of the equipment.
Third, there are shortcomings in the work and the next step of the work goal
In this year's work, I have made their own efforts, although they have achieved certain results. But I feel that there is still a big gap from a good technician standard. This is mainly manifested in: in unexpected accidents, some of the new equipment I'm not particularly familiar with their performance, but also need to find information, affecting the timeliness of equipment troubleshooting; the establishment of the equipment file has not yet been carried out, mainly the completion of the information has not been perfected, and responsible for the project took up a great deal of my energy in the work, a little out of my depth; training has not yet been included in the standardization of the system, and now training Although the work is carried out, but because of the lack of coordination, easy to normalize the effect of training is reduced; not the standardization of equipment management team to grasp up, resulting in the efficiency of the team did not further enhance.
In view of these shortcomings, I plan to continue to strengthen their own learning efforts, as soon as possible to eat through the new equipment to eat through, and these new knowledge as soon as possible to teach the staff to improve the plant's overall precision and efficiency of the troubleshooting of electro-mechanical equipment.
Technician work summary article 2I have participated in the work after graduation, has been in the construction unit engaged in technical construction, there is a certain amount of construction experience, and have the confidence to # building project successfully handed over to the owner to use.
Engineering construction is in accordance with the design drawings of the designer's ideas to complete the process of transformation from ideology to physical form, in order to do a good job of engineering construction, it is necessary to first familiarize themselves with the construction drawings, grasp the designer's intention to complete the process of revising the drawings from the drawings to understand the design intent and then turn back to revise the drawings, and secondly, we must strengthen the degree of knowledge of the drawings, familiarize themselves with the basic outline of the project to consider the specific construction program, the initial Clearly the focus of the construction of engineering technology, difficult points, for the future construction operation behavior to prepare.
In the process of engineering construction, measurement and placement work is the most important, it runs through the entire engineering construction, is the soul of engineering construction, in order to do a good job of engineering, you must do a good job of measurement and placement work, so measurement, proofreading, review of the program can not be less; secondly, we need to combine the whole set of drawings for each construction layer, construction section, construction point proofreading to avoid the omission of the project's minor parts of the components; again, it is to check, check, check, check, check, check, check, check, check, check, check, check, check, check, check, check, check, check, check, check, check, check and check. Components; again, is to check and implement whether the actual operation of the project layer of understanding and their own thinking, found that the problem of timely communication, to nip the problem in the bud.
After the completion of construction in a project section, we should check in time, acceptance, summarize the experience and lessons learned, and correct the problems found in the next construction section in a timely manner, to reduce the continuous occurrence of errors.
Engineering construction is a very rigorous work, engineers and technicians must take it as one of their own art products to carve, and strive for excellence, to have a good work style, in line with the country (not waste resources), the community, the owners responsible attitude to work, to have "do a project, tree a monument, win a piece of reputation! "The determination, so as to do a good job, in order to become a qualified engineers and technicians.
Engineering construction is a group work, it is not a person or a few people can be completed, it is necessary to quality inspection stations, design institutes, down to the laborers to work closely with each other in order to complete a complex operational tasks, so, good contact with each other with the work is particularly important, or else, do a good job of the project will become an empty word.
As the saying goes, "if the skin does not exist, the hair will be attached" a wage earner if you do not consider the boss and the company's economic efficiency, he is in the self-break, he is not a qualified wage earner, sooner or later will be eliminated by society. Engineering construction work surface is large, the work of many people, the project to achieve a good economic efficiency, materials management is very important, however, the management of materials if only rely on the strength of a person or a few people is far from enough, it needs to be everyone's *** with the efforts to realize. As a technician, the management of materials should not only consider how to save from the technical point of view, but also cooperate with the project manager and colleagues to effectively monitor the site, so that the workers on the site to develop good habits of saving materials, to create better economic benefits for the company, and lay a good foundation for their own development.
The length of the project duration is also an important indicator of the economic benefits of a project, the shortening of the construction period can not only enable the project to be put into operation ahead of time, to create considerable revenue for the Party, but also reduce our construction unit of a number of machinery, materials, rental fees, reduce the cost of personnel management for the company for the boss to reduce construction costs and improve economic efficiency; in this regard, the Party and our construction unit of the interests of the unprecedented unity. In this regard, Party A and our construction unit's interests are unprecedentedly consistent, so the duration of the project is the focus of attention, as a member of the project management personnel to assist the project manager, we work together to shorten the duration of the project is incumbent upon us.
A person's ability and energy is limited, in order to better understand the correct drawings and specifications, diligent communication, prior instructions will be able to avoid a lot of unnecessary debates and rework, to achieve the unity of thought of unity, so that the project can be smooth, on schedule to meet the program requirements.
Although I am young, work experience is not too deep, construction experience is limited, but I will play the young people's learning, hardworking, hard-working, energetic and other advantages, to make up for the shortcomings of the above, study hard, and strive to become a good technical talent, for the development of Hongsheng company to do their best.
I like my profession, more love my position, I believe that, under the guidance of Party A and the Ministry of Engineering, # building project can be carried out smoothly, and in accordance with the requirements of the contract to successfully complete the completion of the acceptance of the task.
Technician work summary 320__ years is my third year of work in the company, in these three years with the company in the continuous development and growth of my personal also from an unaware of the prismatic head of the youth gradually become mature, from a layman with no understanding of the balancing machine to become a familiar with the principle of balancing machine familiar with the company a variety of products of the professional and technical personnel, but also in the management of the department and the communication with people I also have a deeper understanding of the work of the company, and I have a deeper understanding of the work of the company. In terms of departmental management and communication with people, I also have a deeper level of understanding, and I know that the progress I have made and the training of the company's leadership are inseparable.
Without their tireless teaching and time and time again to give the opportunity I will not make progress today, looking forward to 20 ___ is a year of opportunities and challenges co-existing, I will be grouped around the core of the company's leadership, hard work, hard work, and make their own contribution to the company to a higher level of development.
Looking back to the beginning of 20__, although in 20__ the company achieved gratifying results, but the company leadership is not complacent, but for 20__ set higher goals. I also after a short period of adjustment immediately into their roles, at that time in accordance with the instructions of the leadership, I am responsible for the management of the R & D department and the electrical workshop production management work. I first specified the details of the scope of work of the department, clear the work of the entire department's tasks.
And the members of each department in the whole department's work in charge of the scope of the provisions and has been issued in writing to their hands, I developed the composition of the department members of the composition of the map, clear subordinate relationship. I think in the completion of the company's tasks to the department at the same time to establish a disciplined, centripetal force of the team to better serve the company's leadership is more than I hope I can do.
At the beginning of 20__ my department staff has undergone great changes, first of all, the ___ departure in accordance with the instructions of the company's leadership I quickly adjusted the department's structure, will be mainly responsible for the original electrical production of the ___ to take over the ___ of the research and development work, will be only involved in the electrical production of the ___ arranged to be responsible for the production of production management and participate in the production of the position, in the organization of the ___ of the work of the back-up, I found that the ___ of the work of the backup, I found the ___ of the work of the ___. One machine microcontroller program can not work properly, I use other methods to find __ to get back to the program that can be used, and to complete the time __ responsible for the one east project, April __ to leave, affecting the first micro-motor automatic balancing machine part of the preparation, in order to ensure that the equipment exhibits, I work overtime continuously, the May Day holiday is not an exception, and finally realized the equipment exhibits before the goal of a smooth action.
At this time, the leadership of the company also continued to provide me with new technical personnel to supplement the work of the department. In the new personnel can not be fully competent stage, in order to complete the production task, I am often multi-tasking, from the design of electrical diagrams, to guide and participate in the completion of power distribution and then new plc program and touch screen program writing, equipment factory debugging are completed by me alone. Many times in order not to delay the progress of the project I use their spare time to work overtime. Overtime until very late without a car I will pay for a taxi home. Chongqing automatic line project, Shanghai automatic punching machine project, Dewei Dahua automatic machine project are completed at this stage.
I also try to cultivate new people, the ___ dropped to the R & D office, guiding him to use protel drawing software, the production of electrical schematic diagrams, in plc programming, I often tell him the idea of letting him do the hands of the preparation of the program, but due to the fact that I am too anxious to try his best to the pressure is too great, so that he can not withstand the pressure of the proposed resignation. In this matter on the person I re-recognize the method of cultivating talents and the point of view, in order to make good steel, we should find good materials, no matter in the quality of will or moral cultivation, selected talents and then try to cultivate can not cause a waste of manpower and material resources. In the next work I am also in accordance with this idea to select materials, and then the company conveyed the talent does have a more suitable candidates, but because of this and that reason some of them left the company.
In 20__ years, the company completed 7 sets of automatic machines, of which I independently completed the __, __, and __ workstation three electrical design work, program design and in-plant debugging work, a East drilling in-plant debugging work and program later checking the work, __ axle brake drum in-plant debugging work, and I organized the four sets of equipment for the electrical wiring work.
The company completed the double-sided machine 4 sets, including the University of the crankshaft balancing machine vb software changes and in-plant debugging, ___ ring and ___ of the in-plant debugging completed by me.
The company completed 18 sets of single-sided machine, after __ left the company electrical drawing design is completed by me independently. If the after-sales staff is not in the company I also carry out in-plant commissioning of equipment.
In the electrical design, production and program did not bring losses to the company because of errors.
In the company's office equipment or office network problems, I am ready to give treatment to ensure that the company's normal office. Seventy percent of the industrial control machine by my installation and commissioning. In the absence of customer service personnel, I was able to assist the customer service department to answer customer questions and maintenance of customers in the city. Among them ___ Fu Ao repair and maintenance dozens of times.
20__ is a tough year, due to the impact of the world economic environment, the company's performance did not reach the ideal state, but I will not be intimidated by these objective conditions, I firmly believe that the leadership of the company under the leadership of the company, we will be able to get through the difficult times, 20__ my work is mainly arranged in the electrical production in this regard, I am ready to develop more electrical production processes, so that each job has a Uniform standards. The goal is to realize each piece of equipment in the factory electrical wiring error rate is less than once. Establish a set of reasonable reward and punishment system for electrical production staff and a system of performance appraisal, so that the staff can have better motivation. Organize weekly training for the electrical production workshop to realize that each staff can independently debug single-sided and double-sided equipment, and can independently check the wires. I will do my best to help newcomers in talent training, and deliver electrical talents for the company.
My requirement for myself is to more strictly abide by the rules and regulations of the company. Efforts to improve their management skills, I set a goal for themselves, 20__ years I want to realize the electrical part of the equipment zero error. Please company leaders to supervise my work.
Technician work summary 4
In the blink of an eye, ___ years have passed, now from the following aspects of the work of the Ministry of Engineering in the year to do a summary report.
First, the progress control
According to the beginning of the company's engineering progress requirements, the main project should be completed at the end of ___, the actual end of the year, the main project is completed, the masonry project is completed ___%, an average delay of ___ months than the original scheduled construction period.
The main reasons for the delay are in the following three aspects:
1. We underestimated the difficulty of the project in advance, and the contract duration was too tight. The fixed duration of the project should be ___ days, but we compressed the duration to ___ days, which could be completed as planned only in an idealized situation, but the project is difficult, and any unforeseen situation may cause delays and may have a chain reaction.
2. We underestimated the actual strength of the construction unit in advance. The two construction units belong to the contract responsibility system, the construction unit to collect the contractor's management costs, the capital investment and management personnel of the project configuration by the contractor is responsible for the construction unit does not give the contractor any financial support and personnel support, but also lack of necessary management support, the existence of the phenomenon of the package instead of management.
The main reason for the constraints on the schedule lies in the construction unit's capital and management. The lack of financial strength leads to the materials, equipment often supply, site often stopping to wait for the phenomenon of material, stopping to wait for the loss of construction personnel often caused by the serious lack of labor caused by serious delays in the progress of the project. In terms of management, on the one hand, the responsibility and quality of management personnel can not meet the due requirements, on the other hand, due to the labor layer subcontracting level is too much, the work shift grouping is too fine, can not form the flow operation, resulting in the project manager in the deployment of personnel on the difficulties, and at the same time, due to the labor layer subcontracting, management level is too much, the management intention of the upper management personnel, especially project manager can not be timely and effective implementation in the team. On the other hand, nowadays the civil workers are also very difficult to manage, often because of some small problems and management personnel against the work. This is the main reason for the delay.
3, our own management problems: the Ministry of Engineering, especially the department manager for the construction of the delay, although a series of positive measures, but not enough, for some of the problems dealt with, especially the construction of a serious lack of personnel and materials are not timely supply of the lack of adequate and effective management measures and contingency measures, which also led to the delay in the schedule of one of the factors. These need all of us, especially the department manager in the future work hard to learn engineering management knowledge, master more good management experience and management methods, to further improve their own management level, in order to live up to the leadership of the entrusted, for the development of x real estate to make greater contributions. In response to the emergence of the above problems, all of us in the Engineering Department in the General Manager's Office of the strong support and help, in terms of funding and other aspects of a series of measures, but also achieved good results, in the latter half of the construction process, not only curbed the momentum of further delay in the construction period, but also delayed in the construction period is also step by step to reduce.
Second, quality control
Since the start of construction, the Ministry of Engineering has always adhered to the principle of quality first, strict quality control, so far, the quality of construction is still relatively satisfactory, although there have been some quality slippage phenomenon have been resolved in a timely manner to maintain the overall momentum of high-quality works, to create a solid base for the X Cup has laid a solid foundation for the current after the city quality inspection station and the provincial station. Multiple inspections, although raised some questions, but the overall quality of our project is still given a positive. According to the current situation, our project through the provincial quality main structure acceptance is not a big problem.
Third, cost control in the cost control, we mainly from the following aspects
1. minimize the drawings of unnecessary cost inputs, for example, for the construction of the human defense basement, in order to save costs, we and the company leadership *** with the decision to study the architectural plane according to the construction of the x design institute's drawings, but structurally in accordance with the construction of the x design institute's drawings, this one is estimated to save costs for the company nearly. This one is estimated for the company to save costs of nearly a million dollars; we also through the technical transformation in the premise of not increasing the cost of increasing some of the parking spaces available for sale, increased sales revenue. At the same time, the installation of professional also put forward some rationalization of the program for the company to save money nearly a million dollars, and therefore by the company's notification of praise and material rewards.
2. For the construction process of some of the technical changes, we have little impact on the investment cost or reduce the cost of timely changes, for the increase in cost but not the same changes in the organization of technical analysis, choose the most economic feasibility of the change program. At the same time, the strict implementation of the drawing change approval system, all changes must be approved by the General Manager's Office before implementation.
3. Project visa, we reformulated the project visa process approval system, the implementation of supervision engineers, directors, engineers in charge, engineering managers, budget engineers, financial managers, general manager of the Office of the seven levels of approval, layer by layer checking, should not pay for the visa resolutely returned to the visa that does not really occur and should be paid for the visa to carry out a rigorous examination of the cost to put an end to the cost of the unreasonable expenditure.
Fourth, the site safety and civilization construction
As the project's goal is the provincial civilization site, so we have given enough attention to the site safety and civilization construction, due to the limitations of the conditions of the site civilization construction can not be done very well, the late civilization of the construction of the site for us to make great efforts to grasp, and has achieved good results. At present, after a number of inspections by the Sheng City Safety Inspection Station, the near future is expected to pass the acceptance of the provincial civilized site.
Fifth, the management of the supervision company
In general, our management of the supervision company is a certain problem, mainly the lack of a strong hand, not strictly in accordance with the contract requirements of the supervision company personnel to the post, resulting in the supervision of the overall quality of personnel on the low side, and finally, our Ministry of Engineering had to spend a lot of energy to help the supervision company to complete the work should be completed by the supervision of the work, though In our *** with efforts to basically complete the work successfully, but accordingly increase the labor intensity of the engineering department comrades. But on the other hand, we should realize that, why the supervision unit stationed at the site of the overall quality of the personnel on the low side? The reason for this is that we believe that the supervision costs are too low, the supervision costs are low, the supervision staff sent over to the supervision of the salary will be very low x / month), the quality of low-wage supervision staff must be low.
Technician work summary of the 5Indeed, sighing the passage of time, in the blink of an eye has been the past year, but also a year of their own work. Since I came to ___ company work so far, I have been in the project department as a construction technician, in these days both sweet and sour and bitter and spicy, and more importantly, harvest. Summarize the work of a year, standing on a personal point of view to talk about the understanding of technical work.
First, the project overview and importance
___ project an important special project, is connected to the hub and the city of Lechang traffic, is the use of the old Beijing-Guangzhou Railway Pingle branch of the reconstruction of the roadbed into a total length of 13.791 kilometers, with reference to the third-class highway standard design, the concrete pavement width of 6.5 meters for the dual carriageway. The left bank of the road will be opened to traffic for the entire Lechang Gorge Water Conservancy Hub main project raw materials transportation, mechanical and electrical equipment transportation to create good traffic conditions for the realization of the project construction goals to provide a strong traffic security, to ensure that ___ project in October this year, the dam reaches an elevation of 164 meters, to ensure that at the end of this year, with the conditions of water storage stepped on the "fast track! ".
Second, the project quality management
Technicians are working in the construction line, the quality of the construction process, safety, progress, etc. to be responsible for, to report in a timely manner in the construction of the need to solve and improve the problem, and to the leadership of the solution. In the work to deal with the construction staff and supervision of the owner's relationship, all to ensure progress and quality and safety as a prerequisite. Engaged in technical work, but also good at learning and research attitude, only rely on books to learn the knowledge is far from enough, must have a wealth of field experience, which requires a detailed understanding of the construction drawings in advance, in the mind to form a targeted construction process.
As an engineering and technical personnel, their work is also relatively hard, both to make plans in advance to prepare for the follow-up work, to ensure that the implementation of the follow-up work, not busy, not lack of East and West, does not affect the schedule, but also to do a good job in the construction process of the supervision of the work of the quality of the project for a comprehensive inspection of the construction process of potential, the emergence of the problem of timely put forward, correct the construction process of the special Construction process of the construction of the whole process of tracking checks to ensure that each process is qualified, with the supervision and technical staff to inspect and solve the problems found in a timely manner to rectify to ensure that the construction quality of each link up to standard. At the same time during the day to run around the site to guide the construction, and at night to organize the day's internal data, and the next day's work arrangements. Especially in the rush period, more hard work, which requires a hard-working spirit, timely completion of the day's work.
As an enterprise, profit is the ultimate goal, so under the premise of ensuring the quality of the project, it should pursue the maximization of profits. This requires attention in construction to rationalize the construction process, procedures, and minimize the cost of the project. At the same time in the construction process pay attention to saving labor and materials. For the changes that can be added to the supervisor and the owner to fight in a timely manner.
Third, the project data organization
In the construction process of the formation of a variety of internal data and quantitative confirmation of information to find the supervisory engineer in a timely manner to sign, so as not to affect the measurement of the later. In this year, I have been working as the left bank road engineering technician of Lechangxia Water Conservancy Hub, responsible for the construction acceptance of the fifth section, quality supervision, quality assessment, completion and acceptance of the data collation work. Because of the site construction is more familiar with, but also to help the internal work group will produce the content of the change in time to organize and report, for the future settlement and completion of the data to provide a basis.