How to write a professional contracting contract in 5 articles
In fact, with the ability to tangibly represent what is contained in the form of electronic data interchange, e-mail, etc., so you now know how a contract looks like? I'm here to share with you some how to write a specialty contracting contract, which I hope will help you.
How to write a professional contracting contract 1
Contractor: (hereinafter referred to as Party A) Contractor: (hereinafter referred to as Party B)
Party A will be the exterior wall insulation project contracted to Party B construction, in order to clarify the responsibilities of both parties, by mutual consensus, based on the "Contract Law", "the Chinese People's Republic of China **** and the State Building Law", and other relevant laws and regulations, to enter into this contract.
I. Project name: ? External wall insulation project.
Second, the scope of the contract:
Party B package, in addition to the removal of external wall tiles outside all external wall construction projects, specific practices are as follows: (1) polyurethane damp-proof primer; 2, 60-thick now sprayed polyurethane insulation layer of rigid bubbles; 3, interface mortar; 4, 20-thick glass beads leveling layer in the middle of the attachment of the hot-dip galvanized welded wire mesh (specifications 12.712.7mm, diameter I0.6mm) Plastic anchor bolts bidirectional @ 500 anchorage; outside with anti-cracking mortar cover; 5, rock wool fire isolation belt, width 400mm window opening through the length of the set thickness with the same insulation layer, polyurethane material fire rating of B2 level, Party B organization construction). The amount of work is about , the insulation project before the start of construction preparation, completion of cleanup, garbage removal, product protection, construction personnel comprehensive insurance, defects liability period warranty, etc. are within the scope of the contract, no longer another piece of work to deal with, Party B is fully responsible for the construction management of the thermal insulation project, such as the quality of the work period, safety.
Third, the total duration of the contract:
Fourth, the quality of Party B, safety requirements:
Project quality standards:
(1) a one-time acceptance;
(2) the basis for the construction and acceptance criteria:
a. According to the design unit recognized by the construction drawings;
b. According to the party provided by the party and by the party, General Contractor, Supervision, Design and Owner confirmed by the construction program and drawings for construction and acceptance;
c. According to the Ministry of Construction, "Unified Standard for Quality Acceptance of Building Construction" (GB50300-20__); (3) Final Acceptance Department: Party A, General Contractor, Supervision, Design, Owner and Huantai County Quality Supervision Station.
(4) and constructed in accordance with the technical measures required by the technical notification letter of the construction unit, see attached page.
1, Party B and its operators should be strictly in accordance with the safety production norms and relevant standards of construction protection, operational requirements to arrange the construction, any production safety accidents by Party B to bear the liability.
2, qualification information requirements: polyurethane, glass beads two materials manufacturers should have Zibo Wall Reform Commission certification and product qualification certificate, manufacturer's enterprise qualification certificate and invoices of incoming materials and national requirements of environmental standards; polyurethane construction unit must be a professional qualification of the construction unit, need to provide the certificate of construction qualification, material invoices according to the contract amount of 60%. The material invoice is 60% of the contracted amount, and Party B is responsible for the construction material experiments.
Fifth, the contract price:
Contract unit price, 60 thick polyurethane foam exterior wall insulation comprehensive unit price of 175 yuan / m2, Party B to complete the contracting task, the amount of work to the site of the actual measurement of the number of horizontal and vertical projection area shall prevail, and ultimately to the Party's project manager, constructor, technician signing shall prevail, the signature of less than one person is invalid.
Six, price settlement
1, the construction of two buildings, each completed a building of polyurethane foam, payment of 30% of the amount of insulation of a single building, that is, two buildings are completed after the payment of 30% of the total contract.
2, Party B completed on schedule, that is, 80%, if Party B in the agreed period is not 90%, Party A has the right to retire Party B, and will be the remaining works to be completed by another contractor designated by Party A, the resulting increase in the cost of labor costs and turnover of materials leasing fees costs by Party B is responsible for the full assumption of Party B, and at the same time, Party A has the right to delay the loss of the period of time caused by the loss of Party B to the actual loss of the fine. Party B requested from the construction of Shandong Hongjia Real Estate Co., Ltd. withholding project funds shall not affect the normal allocation of Party A's other construction projects.
3, the remaining 20% of the contracted amount previously paid.
VII, this and the same from the date of signature and seal, the two sides to clear the price of its own expiration. (In addition to the quality responsibility and warranty terms)
Contract signing place:
Party A: Party B:
Tel: Tel:
How to write a professional contract 2Contractor: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
Consultation with good friends, according to the relevant laws and regulations of the state, on the basis of equality, Voluntary, good faith and credit on the basis of the spirit of the "construction project construction contract" and the accompanying agreement signed by Party A and the construction unit, in order to ensure that the project and the construction unit signed the "construction project construction contract" full performance, clear responsibilities, rights and benefits of Party A and Party B, the relationship between Party A and Party B, and hereby enter into this contract, the two sides *** together to comply with.
Article 1 Project Overview
1, Project Name: Xuancheng City, Xiangjiang Jinxian a construction project (1 #, 2 #, 3 #, 5 #, 9 #, 10 # building and basement)
2, Project Location: Xuancheng City, Xuancheng District
3, structure, number of floors: according to the design of the drawings.
4, the total construction area: 156937.6 M2
5, the scope of the contract: the construction contract and the bidding documents agreed content.
6, the tentative total cost of the project: 32 million whole (the final settlement of the project is adjusted according to the actual audited settlement cost)
Article II Project Management Objectives
1, the contract signed to start: subject to the contractor's order of commencement of the work, the construction period of 720 days
2, the quality of the project grade: qualified
3, safety, civilization requirements:
(1) Put an end to personal injury and death: put an end to equipment, fire and other major accidents.
(2) create (city) level safety and quality standardization site.
4, contracting the scheduled cost of ¥ 32.00 million.
(1) construction taxes, company management fees, migrant workers, insurance premiums, bidding management fees borne by Party A, Party B each time the money to Party A's account after deducting 12% returned to Party B. The construction unit will not be held liable for breach of contract. In the case of the construction unit does not pursue the responsibility of the project breach of contract, the enterprise reputation and image of the contracting party is not damaged, that is, deemed to be the performance of the contractor.
(2) the term of submission of profits and fees stipulated:
Submission of profits and fees with the progress of the project: the construction unit each time the actual payment of 12% of the progress of the project is charged: the settlement of the fire project is the most total of 10% deduction of the tax pipe fee adjusted.
Note: When the amount of money collected exceeds the total cost of the contract works. Party A will continue to overcharge the amount of money part of the contract agreed rate charged management fee.
(3) The final adjustment to the final audited cost of the submitted profits and fees.
5, safety and civilization construction measures and migrant workers' wages deposit according to the requirements of the relevant departments of the project location by Party A is responsible for handling.
Article A, B responsibilities, authority
Party A:
1, is responsible for guiding and helping Party B to carry out the implementation of national laws, regulations and industry norms, standards, and strict fulfillment of the construction unit signed with the "construction contract".
2, responsible for the formation of the Project Manager Department, in accordance with the functions of the exercise of management, supervision and control of the project, to ensure that the project comprehensive contract performance. The project party A selected constructor and safety officer into the project department work, with party B on the construction of the project to do a good job of overall management.
3, to the project manager, safety officer clear duties, rights and obligations, according to the provisions of the exercise of duties, rights and obligations, effective throughout the construction of the project.
4, Party A must ensure the safety of Party B's funds and timely payment, in the project and the construction unit to make an appointment to transfer the money, the company appointed accountant for Party B to handle the transfer procedures, deducting the amount agreed to be receivable in the contract, and the balance of the money in full within three working days after the receipt of the company's payment for the project to pay to Party B.
7. Have the right to order rectification and investigate the irregularities of the project department.
8, after the completion and delivery of the project, in the quality warranty period due to the construction of quality problems, timely notification of Party B into the maintenance.
9, responsible for the project department's business process and final settlement audit supervision.
Party B:
1, the project is entirely invested by Party B, responsible for the construction tasks within the scope of contracting. The required funds are self-financed by Party B.
2, conscientiously implement the relevant national laws, regulations and construction industry standards, regulations and the relevant management departments where the project is located, and strictly fulfill the contracts, agreements and commitments signed by the project, and take full responsibility for project management.
2, under the guidance of the Group, the formation of the project management department, responsible for the development of project management personnel job responsibility system, according to the job function to perform their duties.
3, Party B should consciously accept and obey Party A's management, abide by and implement Party A's rules and regulations, obey the supervision and management of the relevant management departments where the project is located, strengthen the management of the construction process, to ensure that the contract performance. Consciously maintain Party A's corporate image and reputation, without prejudice to any of Party A's interests.
4, accept the Group's functional departments of the business supervision and government departments of the industry inspection, according to the prescribed deadline to the functional departments of the project information (all kinds of business reports, external communication information and work summary, etc.).
5, responsible for the project accounting work, responsible for all the costs and expenses of the project (including social management costs and awards and fines, etc.), the establishment of a sound project accounting accounts and organize the relevant information, to ensure that there is no violation of the law.
6, strict construction and production process control to ensure that the schedule, project quality and production safety. If there is a penalty for the duration of the work or the emergence of project quality, production safety problems, in addition to all the costs of loss borne by the contractor, the company will be in accordance with the company's rules and regulations to give the contractor a certain economic penalties.
7, do not privately transfer money from the construction unit to the outside and borrowing, do not default on the wages of civil workers and project materials, and actively settle all kinds of debts.
8, Party B itself and fully responsible for the project's profit and loss responsibility and legal responsibility and consequences, the consequences of all things that happen in the project are borne by Party B.
Article IV Awards and Penalties
1, according to the contract agreed to create a quality project, the construction unit to give the quality of the project award 80% of the award to Party B, (including project construction and management of the relevant parties). Failure to complete the contract of the agreed quality objectives of the penalties and losses caused by quality accidents borne by party B.
2, in accordance with the annual excellence program arranged by the quality and safety to reach the target, the company in accordance with the relevant provisions of the award.
3, Party B must ensure the safety and civilization of construction, such as the occurrence of a serious injury penalty of Party B 5000 yuan, the occurrence of a fatal accident penalty of 10,000 yuan, Party B at the same time bear to deal with the safety of all the costs incurred in accidents and fines imposed by the higher authorities.
4, the project funds are not transferred to the company's designated account, the occurrence of extracorporeal circulation of funds, in addition to the requirement of all the recovery to the company, to the party according to the extracorporeal circulation of the amount of '3% penalty.
5, such as the cause of Party B caused by the project, material payments, such as economic litigation, Party B shall bear all the financial responsibility and litigation costs, and give Party B 20___ ~ 30000 yuan fine.
6, the project in the delivery of the responsibility of quality problems, owners or users complain about the loss of credibility of the company, depending on the circumstances of the Party B 20__-20000 yuan penalty; warranty period maintenance fees borne by Party B.
7, the completion of business management objectives and to establish the company's reputation to make significant achievements, the company will contribute to the degree of Party B will be given commendation; on the failure to complete the business management objectives or the occurrence of business damage to the credibility of the enterprise, the company will be depending on the circumstances to give Party B severe penalties.
8, Party B to ensure that labor wages paid in full and on time, shall not occur due to the settlement of labor wages and payment of complaints caused by the incident, due to complaints caused by the company's credibility loss, depending on the circumstances of the Party to give 5000 yuan 20000 yuan / times the penalty.
Article V Supplementary Provisions
A and B shall strictly fulfill the terms of this contract, Party A and the construction unit of the contract and the accompanying agreement Party B synchronized acceptance.
Article 6 Others
1. This contract shall be signed by Party A and Party B and shall come into effect.
2, this contract on the project management of outstanding matters, according to the company's relevant documents.
3, this contract in triplicate, Party B a, Party A two.
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ ____ _________ ____ ____ Day
How to write a professional contract 3Party A: Fertilizer Mining Group Weixian New Tao Yang Mining Company Limited three mines
Party B:
A, B both sides in equal and voluntary, consensus, honesty and credit on the basis of the internal staff canteen contracted to the Party B reached an agreement on matters related to the Party. In order to clarify the rights and obligations of both parties, this contract is signed, *** with compliance.
The first contract object
Fertilizer Group Weixian New Tao Yang Mining Co.
Article II daily management of the canteen business model
1, Party A independent arrangements for the staff canteen kitchen location, dining room space and other matters.
2, Party B is responsible for the daily maintenance of kitchen facilities and items, if there is man-made damage to the situation Party B need to pay compensation.
3, Party B is responsible for the daily cost of water and electricity in the cafeteria, and Party A will set up the meter in the cafeteria, and Party B will pay the electricity bill of the cafeteria according to Party A's electricity payment standard.
4. Party B arranges its own kitchen staff and its service staff, and is responsible for the staff's salary, accommodation, safety, welfare and related health documents.
5, Party B must give priority to Party A personnel dining.
6, the internal hospitality of outsiders according to Party A's request for separate arrangements.
Article IV contracting period and deposit
1, this contract is valid from January to January (including the contract trial one month), the contract expires automatically lifted, if the two sides want to continue to work together, the need to re-sign the contract.
2, Party B to Party A to pay a deposit of yuan, Party B in the use of the items during the period of damage, Party B does not compensate in time, Party A has the right to deduct from the deposit, Party B should be within 10 days to make up for the deposit, otherwise Party A has the right to terminate the contract.
Article V. Rights and obligations of Party A and Party B
1. Rights and obligations of Party A:
(1) Party A supervises Party B's daily operation and management in accordance with the agreement of this contract, and urges Party B to fulfill its obligations under this contract effectively.
(2) Party A may, according to the actual needs, propose to Party B to change the meal time or arrange for one or more people to eat. Party B should actively cooperate, and start the meal on time, so that the meal is hot and flavorful.
2, Party B's rights and obligations
(1) Party B is responsible for the operation and management of the cafeteria, including the cafeteria staff arrangements, dishes with the production of cafeteria hygiene and cleaning, Party guests dining reception.
(2) the validity of this contract, Party B should be healthy and sound rules and regulations and related job responsibilities and operating procedures, and strictly according to the system and operating procedures. The establishment of the system mainly includes: working hours, job duties, fire prevention, drug prevention, anti-theft, health management and other aspects.
(3) Party B's contracted cafeteria for the sole purpose of serving Party A, and is not allowed to change the use, and is not allowed to subcontract.
(4) To achieve an elegant environment, food hygiene, fine quality, good order, and pay attention to do a good job of thrift and frugality, to ensure that the cafeteria quiet, safe.
(5) Consciously obey the management of Party A and accept Party A's supervision and guidance.
(6) To ensure that Party A personnel dining, so that Party A dining staff at any time to eat. And do fresh and tasty, renovation, nutrition with good.
(7) During the validity of this contract, Party B is responsible for the fire, safety and hygiene of the cafeteria. If fire, food poisoning, environmental pollution, safety and other accidents occur due to Party B's responsibility, all losses will be borne by Party B, and will be held responsible in accordance with relevant laws.
(8) After the meal carefully wash tableware to do a good job of disinfection, and do a good job of eliminating mosquitoes, flies, rodents and other work.
Article 6: Liability for breach of contract
1. If Party B provides unclean food and causes food poisoning to Party A's personnel, Party B will be responsible for compensation and bear the corresponding legal consequences.
2, Party B in the performance of this contract, if it is obvious violation of the contract, can not meet the contractual requirements of the standard of food and food time, after three written reminders, Party B still do not correct, Party A has the right to unilaterally terminate the contract and do not pay liquidated damages.
3, this contract formally effective after any party is not allowed to unilaterally unauthorized termination of the contract, such as the need for early termination of the contract, should be 30 days in advance written notice to the other party, the other party agrees to terminate the contract, but need to pay liquidated damages ------- yuan.
Article VII The expiration of this contract Party B shall deliver the outsourced goods (according to the goods handover list) to Party A in good condition, and Party B shall be responsible for compensation for any damage.
Article VIII Other Terms
1, this contract in duplicate, each side of a copy of this contract since the date of signature and seal of the two sides of the trial for one month, if the two sides have no objections, by both sides in writing to confirm the formal entry into force.
2, after the signing of this contract, Party B ------ provide cafeteria dining management system, to Party A review and implementation.
3, this contract, if any omission, can be specified in the supplementary agreement, the supplementary agreement as part of this contract.
Party A:
Party B: Year
Month
How to write a professional contracting contract Article 4Party A:
Party B:
Party A is a ___ person enterprise, providing comprehensive labor services for ___ work; Party B is a ___-based independent workers' partnership organization, providing labor services for the community. Party A in order to better provide quality services for ___, to promote the development of ___ cause, Party A will ___ property management work contracted to Party B, Party B agreed to collectively contract the management of the property. In order to protect the legitimate rights and interests of both parties, clear rights and obligations of both parties, now on Party B contracted ___ property management related matters, the two sides fully negotiated, and hereby enter into this contract, in order to *** with compliance.
Article I. Contracted content, area, location
Party A will be located in *** count square meters of property contracted to Party B management, Party B is responsible for the management of the property, daily maintenance and other work. (See the list of work content)
Article 2 Contracting period
The contracting period is one year, from January to January. When the contracting period expires, both parties can extend it without objection, but need to conclude a separate written agreement one month before the expiration of the contracting period.
Article 3: Amount and payment of contracting fee
1. Party A shall pay Party B the contracting fee of RMB Yuan every year;
2. The contracting fee shall be paid by installment, i.e.: RMB Yuan shall be paid on the month of 20__.
Article 4 Rights and Obligations of Both Parties
1. Party A assigns technical personnel to Party B for technical guidance in due course, and sends management personnel to supervise and manage Party B. Party B shall obey Party A's supervision and guidance.
2, Party A shall pay the property management contract fee to Party B on time, Party B shall complete the contracted property management tasks on time.
3, within days of the date of this contract, Party B shall select and assign no less than one person to manage and maintain the property in the district on a daily basis, and the personnel assigned by Party B shall be arranged by Party B on its own, but shall be reported to Party A for approval and record.
4, Party B's initial arrangements for the staff is; Party A this review that meets Party A's requirements.
5, in the absence of written consent of Party A, Party B shall not change the personnel at will, otherwise Party A has the right to terminate this contract; Party A believes that the personnel arranged by Party B is not suitable to engage in property management work, the right to require Party B to replace the personnel, Party B should be in accordance with the requirements of the Party to change the management and daily maintenance personnel, otherwise Party A has the right to terminate this contract. Store contract building contract orchard contract fishing contract
6, Party A for Party B to buy compensation for the maximum amount of RMB 100,000 yuan accidental injury insurance; Party B in the contracting period by accidental injury can enjoy compensation.
7, Party B must obey the management guidance of Party A's technical personnel, according to Party A's requirements for management and daily maintenance work.
8, Party B and its members in the contract management period, to consciously strengthen the awareness of production safety, pay attention to safety in the work, and should comply with the Party formulated and published work rules and operating procedures. If Party B seriously violates Party A's working rules and regulations, and refuses to correct after warning, Party A has the unilateral right to terminate the contract.
9, Party B shall, according to Party A's requirements, do:
Article 5 Rewards and Penalties
1, A, B, either party violates the agreement of this contract, the other party caused losses, shall compensate for the losses caused by the abiding party.
2, Party A has the right to contracted property management results based on Party B, Party B appropriate rewards and necessary penalties. (The range of rewards and penalties shall not exceed 25% of the total contracted amount).
3. If Party B does not obey Party A's guidance, management and supervision, Party A has the right to unilaterally declare the termination of the contract, and the unpaid contracting fee will not be paid.
4, Party B shall not sell the property management and daily maintenance tools and facilities provided by Party A. In addition to confiscation of illegal gains, the offender shall be compensated three times the amount of the discount in kind, and if the situation is particularly serious, it shall be transferred to the public security organs for processing.
Article 6 Force Majeure
If due to force majeure natural disasters, resulting in the loss of the property contracted by Party B, after investigation and confirmation, Party A shall accordingly reduce Party B's obligations.
Article 7 Other Matters
1. Party B and the members of Party B undertake that: the purpose of this contract is to contract Party A's property management work, Party B and its members and Party A for the contracting and contracting relationship, and do not believe that there is a labor relationship with Party A, or Party A's employees, and thus claim the relevant rights and obligations.
2. If Party B's members need to entrust Party A to buy social labor insurance or medical insurance on behalf of Party A, Party A can provide assistance, but all the insurance costs shall be borne by Party B (or authorize Party A to deduct directly from the contracting fee).
3. Party B hereby authorizes Party A to pay the members of Party B a monthly labor fee of RMB yuan; to pay the labor fee of RMB yuan; to pay the labor of RMB yuan,*** counting RMB yuan; Party B hereby authorizes Party A to deduct the above fees directly from the contracting fee that should be paid to you.
4. This contract shall take effect from the date of contracting and shall expire at the end of the contract period. After the expiration of the contract, if both parties are willing to continue cooperation, must re-enter the contract.
5, in the implementation of the contract, if there are outstanding issues, should be negotiated by the two sides **** together, to make additional agreements, additional agreements and this contract has the same effect.
6, such as disputes arising from this contract, the two sides should consult to resolve the consultation fails, either party can be to the people's court where the contract is signed to file a lawsuit.
7, this contract in duplicate, each party to sign a copy, have the same legal effect.
Party A:
Legal representative:
Party B (signed by the contracting representative):
Party B (signature of all members):
Date of signing of the contract: Monthly
Contract signing place:
How to write a professional contracting contract Article 5Party A: __
Party B: ___ ID card: ___.
Address: __ No.
In order to improve the management system, to protect the normal life and health of employees, to ensure the smooth progress of the project. Party A agreed to contract the staff canteen of Pinghe Hengfeng City Plaza project to Party B for operation and management, in order to clarify the responsibilities of both parties, after friendly consultation between Party A and Party B have reached the following agreement:
I. Name of the project:
__ Project: building area: about __ square meters.
Second, the date of contracting: planned start date:
20___ __ months ___ to the project all the building number of the project outside scaffolding demolition is completed.
Third, the scope of contracting and payment of fees:
1, the scope of contracting: contracting the operation of Party A's staff restaurant canteen, is responsible for the supply of Party A's employees (morning, noon, night, night snacks, overnight), it is strictly prohibited to carry out illegal business activities in the canteen area (including the dormitory) and other uses. Employee cafeteria management, in addition to the Party provided by the single layer of about __ square meters of activity room and water and electricity in place, the rest of the cafeteria using equipment, tools, stoves and canteens used materials such as procurement management, use are responsible for by Party B itself.
2, the cost of payment:
(1) the canteen generated by the water and electricity (separate meter) according to the actual amount of use, monthly by the party on behalf of the cost of Party B to bear, and in the month before 0 days to pay off.
(2) Party B in the operation period, quarterly payment of temporary facilities rent and management fee of RMB yuan / quarter, (cost of the date of record: since 20___ ___ month ___ to the removal of all the external scaffolding to the end of the end)
3, after the contract is signed and entered into force, Party B to pay the Party ___ yuan to do the performance of the contract as a security deposit (all the building works of the external scaffolding removal is completed and then refunded).
Fourth, the responsibilities of both parties:
, Party A's responsibilities:
(1) canteen infrastructure construction, to ensure that water, electricity, and do a good job of the initial decoration of the canteen. Ensure that workers do not cook on their own, prohibit the "three stoves", Party B to cooperate with the supervision, subject to a fine of 500 yuan per photo.
(2) The project department designated ___ (contact number: ________) is responsible for supervision and management of the canteen (quality and price control of meals, etc.).
(3) Provide the cafeteria hanging "cook job responsibility system", "Food Hygiene Law", "food (finished products) storage" four segregation "and" food hygiene "five-four system" card.
2, Party B responsibilities:
() do a good job within the scope of the canteen (including the dining room) within the health, security conditions should be kept good; take effective measures to prevent fire, gas poisoning, food poisoning and other accidents. If food poisoning occurs, all losses borne by Party B.
(2) must ensure that the food (finished products) storage "four segregation" and "food hygiene five-four system".
(3) Cooks and other personnel in the cafeteria should be licensed.
(4) Purchased food should be fresh and hygienic, and efforts should be made to learn cooking techniques, improve the quality of meals, color and flavor, and ensure that workers have enough to eat at a reasonable price.
(5) Party B, in addition to the operation of the canteen, without the consent of Party A shall not operate other projects within the project, violators Party A has the right to confiscate the appropriate penalties for Party B.
(6) Party B shall be responsible for only using bottled natural gas and electrical appliances in the course of operation, and the use of honeycomb coal or other is strictly prohibited, Party A shall have the right to penalize Party B 500 ~ 000 yuan, and Party B shall be responsible for the damages caused by Party B.
(6) Party B shall be responsible for only using bottled natural gas and electrical appliances in the course of operation.
(7) Party B shall be responsible for the employee's health card and canteen business license and other relevant certificates, specifications in line with the civilized construction and health management of the relevant provisions of the timely cooperation with the relevant departments of the canteen inspection and guidance, and bear the cost of the relevant penalties for inadequate management.
(8) In addition to force majeure factors, Party B shall not use any reason not to supply meals in a timely manner or insufficiently. Shall not stop business without reason. If unauthorized cessation of business for more than three days, Party A has the right to suspend this contract from the fourth day and remove Party B from the premises, and Party B shall be responsible for any damage caused.
(9) Party A is responsible for providing a hot water tank for workers' use, which is kept by Party B on behalf of the workers.
V. This contract is in duplicate and has the same legal effect.
Party A (official seal): ______ Party B (official seal): ______
Legal Representative (Signature): ______ Legal Representative (Signature): ______
______ ___Month___, ______ ___Month___, ______