After the completion of the project
1, the construction unit to do the project completion of pre-completion inspection (Quality Inspection Station)
Project completion of pre-completion inspection declaration form (signed by the director of the Quality Inspection Station)
completed, the construction unit information can be stored in the archives, out of the construction project completion of the acceptance of countersigning form
2, the planning of a single body acceptance Opinion (Planning Department of the Planning Bureau)
3, Planning Comprehensive Acceptance Opinion (Planning Department of the Planning Bureau)
4, Planning Acceptance Certificate (Administrative Hall)
5, Fire Acceptance (Fire Brigade)
6, Comprehensive Acceptance of Completion (Quality Inspection Station)
Application for Acceptance of Completion of Construction Works (Signed by the Director of the Quality Inspection Station)
7, the completion of the project for the record
8, file certificate of conformity
9, real estate license
Two Jimo City, construction project completion file finishing requirements
According to the Ministry of Construction and the State General Administration of Quality Supervision and Inspection of the release of the GB/T50328-2001 "construction project document filing and organizing specifications" provisions of the completion of the construction project file finishing the basic Requirements are as follows:
One, the quality of the archived documents required:
1, the archived project documents should be the original, and its content must be true, accurate, and the actual project.
2, engineering documents should be durable writing materials, such as carbon ink, blue and black ink, shall not use easy to fade writing, such as: pure blue ink, ballpoint pen, carbon paper, pencil and so on.
3, engineering documents should be clear handwriting, clear drawings, charts and graphs neatly, signatures and seals complete procedures.
4, engineering documents in the text material format size specifications for A4 format (297cm * 210cm). Drawings are appropriate to use the national standard drawings.
5, as-built drawings should be new blueprints, computerized drawings must be clear, no computerized copies of drawings.
6, the use of as-built drawings should be stamped as-built drawings.
7, the basic content of the as-built drawings chapter should include: "as-built drawings", the construction unit, the preparer, the reviewer, the person in charge of technology, the date of preparation, the supervision unit, on-site supervision, director.
8, as-built drawings should be used to seal the red sealing clay is not easy to fade, should be stamped in the blank space above the icon.
9, the use of construction drawings redrawn as-built drawings, must be marked with a change in the basis for modification; where the structure of the construction drawings, technology, layout and other major changes, or changes in more than 1/3 of the surface, should be redrawn as-built drawings.
10, different formats of engineering drawings should be "technical drawing reproduction map folding method" (GB/10609.3-89) unified accordion folding method folded into A4 format (297mm * 210mm), the icon bar exposed outside. (As-built drawings are not bound)