How much does the garbage disposal plant invest?

To be a garbage disposal plant in a county, the most ideal incineration method is "clean incineration". If clean incineration method is adopted, the equipment is "Waste Incinerator with Resource Utilization Method". The total investment of the project is about 3 million.

waste incinerator with resource utilization method is based on three elements of material combustion and adopts fuzzy design method, so that waste can be cooled, burnt out, carbonized, combustible gas generated and dried from bottom to top in a closed anoxic environment in the furnace, and then a large number of combustible gases mainly containing carbon monoxide, hydrogen, methane and other carbohydrates can be obtained. These combustible gases are new energy sources for waste regeneration, which have high heat energy and can replace diesel oil. The tail gas treatment tower behind the incinerator burns the flue gas at high temperature and oxidizes the toxic and harmful substances in the flue gas, so as to achieve the purpose of treating waste with waste, utilizing resources and protecting the environment.

The waste incinerator with resource utilization method is a kind of combustible gas generator with high load, closed, no odor spillage and no gas leakage. Under the condition that diesel oil, heavy oil, mixed oil and natural gas are not needed, the whole process of garbage dehydration, garbage gasification and garbage effective incineration is comprehensively realized. It is a new technology, new process and new product for clean incineration of garbage.

There have been engineering examples of waste incinerators with resource utilization method in Guangxi, Beijing, Shandong, Hebei, Guizhou, Shanxi, Sichuan, Inner Mongolia, Heilongjiang, Jiangsu, Jilin, Henan, Hubei, Tianjin, Xinjiang and other places in China. The cases involve waste incineration in the fields of life, hospitals, chemical industry, slaughter and food. A large number of applications have proved that the incineration effect is better than the national discharge standard, and it has won the praise of users and experts. In August, 29, it won the new technology of energy-saving drainage in Guizhou Province; In June 21, it won the national innovative product; In May, 21, it won the product of National Torch Program.