(2) factory certificate of conformity, manuals, installation test records. (3) Parts specification, the main accessories and wearing parts drawings.
(4) overhaul records (overhaul content, replacement parts and components name and quantity, overhaul quality, test acceptance, etc.).
(5) equipment accidents and defects record.
(6) the working medium of the equipment, working pressure, anti-corrosion lining and other major conditions.2 T" J8 |8 t.
2, to ensure the accuracy of the equipment ledger file. Equipment changes in the workshop to fulfill the necessary procedures to notify the Ministry of production in a timely manner to change the file ledger, equipment relocation, its equipment files with the equipment relocation. Every year, the Ministry of production and the workshop to check the file once, so that the account, the account is consistent.
3, infrastructure, technological transformation projects after the commissioning of the equipment packing information (certificate of conformity, manuals, etc.), as-built drawings and the installation of test acceptance records and other technical documents were originally archived by the General Manager's Office of the custody of a copy of the equipment by the use of the department to save the equipment after the addition of technical information, such as overhaul records, accident records, grading records, the workshop should be filled out in a timely manner to report to the Ministry of Production archives processing. 4, where the need for equipment and technical information departments, should fill out the loan application form, approved by the leader in charge, cherish the use of the use of the end of the timely return. All the drawings and information obtained from outside departments, after checking by the department of use, after the use of the General Manager's Office and the Ministry of Production archives for safekeeping.
5, the company's safety management department and workshop should be established pressure vessel files and file management system. This system to fulfill the following procedures: "equipment repair and maintenance records", "equipment accident analysis form", "equipment integrity checklist", "equipment accident handling report", "equipment opening acceptance certificate", "equipment installation acceptance handover sheet". 6、Equipment safety officer of production department will check the quantity of equipment and technical data according to the requirement of packing list and register, fill in the Certificate of Equipment Unpacking and Acceptance, and go through the procedures of warehousing and receiving as an accessory. The original of the random technical data will be filed and processed by the General Manager's Office, and the copy will be kept by the production department and the use department. The above system is for reference only.