National boiler safety management regulations?

Chapter I boiler room management

1, procurement and use of boilers with boiler manufacturing license manufacturers produce boilers, please have the installation qualification of the installation company to install the boiler, to ensure the quality of boiler installation.

2, the boiler system operators, must hold a valid corresponding documents on duty.

3, boiler duty operators on duty during the work, must conscientiously fulfill their duties, strictly comply with the inspection, water quality management, equipment maintenance, safety testing, cleaning and sanitation, shift handover and other systems, to ensure that the technical safety of the heating system and running in good condition.

4, boiler room and its auxiliary equipment room, gas regulator station and gas meter room and other places, strictly prohibit the entry of idle people, strictly prohibit fireworks.

5, in accordance with relevant regulations, regular calibration, maintenance or replacement of safety valves, pressure gauges, safety accessories and pressurized components to ensure that they play a normal technical function.

6, every shift on the water level meter for a flushing, weekly manual opening of the safety valve, a monthly safety valve self-blowing experiment, and detailed technical status records, for inspection.

7, often inspect the water, electricity, steam pipe lines, and resolutely put an end to the "run, drip and leakage", "white water table", "full of water" and other phenomena.

8, adhere to the daily water quality testing system, regular sewage, to ensure the quality of water and furnace water. Often maintain sufficient softened water reserves.

9, on-duty personnel are strictly prohibited from drinking before and during the shift, shall not leave their posts, shall not be in the boiler room guests, napping, sleeping or doing things unrelated to work.

10, non-stoker personnel are not allowed to enter the boiler room.

11, it is strictly prohibited in the boiler room and the vicinity of the pile of flammable, explosive products, not allowed to wash and dry clothes in the boiler room.

12, the boiler room, such as electricity, gas welding maintenance, must be reported to the management for approval, and cut off the gas source, to confirm that there is no combustible gas indoor, and after taking protective measures, can be carried out. Strictly prohibited in the boiler room private fire operations at will.

13, under any circumstances, it is strictly prohibited in the gas pipeline welding, with fire work and burning waste. Heavy vehicles must be crushed gas pipeline, must be reported to the gas management department for approval for the record, and good protection.

Chapter II stoker job responsibilities

1, strict implementation of the rules and regulations, and obey the allocation, to be an ideal, civilized, disciplined new workers.

2, stick to the post, concentrate on thinking, strict operation; on duty, do not read, do not read the newspaper, do not doze off, are not allowed to leave the workplace at will.

3, before taking over the shift, patrol as required. Check the equipment, including the water level meter, pressure gauge, blower, induced draft fan water supply system, lubrication system, cooling water, coal inlet and slag out of the device's operation. Check the daily record and count the paraphernalia on time when handing over the shift.

4, strive to learn professional knowledge, proficient in business. Study technology, constantly improve the level of operation, to ensure the safe and economic operation of the boiler.

5, the furnace and auxiliary equipment for regular inspection, civilized production.

6, found that the boiler has anomalies that jeopardize the safety of the boiler, should take emergency measures to stop the furnace and report to the person in charge of the unit in a timely manner.

7, any behavior harmful to the safe operation of the boiler should be stopped immediately.

Chapter III handover

A, the stoker handover:

1, take over the staff according to the specified shift and the specified time to the boiler room in advance, make preparations for the shift, and to understand in detail the operation of the boiler.

2, the shift handover in advance to do a good job of preparation, carry out a careful and comprehensive inspection and investigation to keep the boiler running normally.

3, shift handover, if the person who takes over the shift does not arrive on time, the shift handover shall not leave the workstation.

4, shift handover needs "five" and "five do not hand over".

Five handover is:

(1) boiler combustion, pressure, water level and temperature is normal;

(2) boiler safety accessories, alarms and protection devices, sensitive and reliable;

(3) boiler body and ancillary equipment without anomalies;

(4) boiler operation records, spare parts, tools, appliances complete;

(5) boiler room cleanliness, civilized production. Boiler room clean and sanitary, civilized production.

The five non-transfer is:

(1) do not hand over the work to the stoker workers who drink and are sick;

(2) do not hand over the boiler body and ancillary equipment when there is an abnormality;

(3) do not hand over the shift when dealing with accidents;

(4) do not hand over to the stoker without a license when the receiver is not available;

(5) the boiler pressure, water level, temperature and combustion is not normal.

5, shift handover, handover of both parties **** with the inspection route according to the tour point by point check, the content of the handover and the existence of the problem seriously on record.

6, handover to the superior boiler operation instructions.

7, the handover in the handover record after the signature of the equipment defects found, should be responsible for the shift.

Second, the water treatment personnel handover:

1, the shift handover personnel before the shift handover of water treatment equipment and laboratory instruments, medicines to carry out a comprehensive inspection, with the following conditions before taking over:

(1) water treatment equipment is normal, the main indicators of the soft water is qualified;

(2) the boiler alkalinity, PH, chlorine, and other indicators of the qualification;

(3) water treatment equipment, glassware, and other equipment is qualified;

(3) the boiler alkaline, PH, and other indicators are qualified. (3) laboratory instruments, glassware and analytical drugs complete and intact;

(4) workplace cleanliness and hygiene, neatly arranged items;

(5) water treatment equipment and laboratory records filled out correctly, accurately and completely, and is strictly prohibited from making false statements.

2, the shift personnel should be introduced to the shift personnel equipment operation, as well as water quality testing and boiler discharge and other aspects of the problem.

3, no shift handover procedures, the shift handover personnel shall not leave the workstation.

4, the shift personnel should arrive at the workstation at the specified time, check the shift records, listen to the handover situation.

5, handover personnel *** with the check soft water treatment equipment, laboratory instruments, drugs, etc. are complete and normal, and soft water, pot water main indicators of laboratory tests, qualified before signing the handover.

6, shift workers are not on time to take over, shift workers should report to the relevant leadership, but can not leave the workstation.

7. In case of an accident or a major operation, the shift handover shall be made only after the accident has been dealt with or the operation has been completed, and the person who takes over the shift shall actively cooperate in dealing with the accident and completing the operation.

Chapter IV inspection

1, in order to ensure the normal operation of the boiler and its ancillary equipment to the head of the main shift in the following order every two hours at least a tour of inspection.

2, check whether the coal machine, slag machine, secondary fan, blower, induced draft fan is normal. Motor and bearing temperature rise is over the limit (sliding bearing temperature rise ≯ 35 ℃ maximum ≯ 60 ℃, rolling bearing temperature rise ≯ 40 ℃ maximum ≯ 70 ℃).

3, check whether the combustion equipment and combustion process is normal.

4, check the visible parts of the boiler pressurized components and furnace arch, furnace wall for abnormalities.

5, check the water level of the tank, the temperature of the feed pump bearings and motor, the position of the valve switch and feed water pressure is normal.

6, check whether the dust collector leakage, water film dust collector water volume size.

7, check the slag removal.

8, check the safety accessories and primary instrumentation, secondary instrumentation is normal, the indication signal has no abnormal changes.

9, check the grate gearbox, front and rear shafts, fans, pumps and other lubrication parts of the oil level is normal.

10, the problems found on the tour should be dealt with in a timely manner, and the results of the inspection will be recorded in the boiler and ancillary equipment within the operating record.

Chapter V boiler equipment maintenance

1, maintenance of boiler equipment is in the condition of non-stop furnace, regular maintenance and repair.

2, combined with the inspection tour found in the non-stop furnace can be repaired on the repair.

3, the main content of maintenance:

(1) a water table glass tube (plate) damage, leakage, leakage, with another water table to observe the water level, timely maintenance of the damaged water table;

(2) pressure gauge damage, the dial should be replaced in time;

(3) running, bubbling, dripping, leaking valves can be repaired in time to repair or replacement.

(4) rotating machinery lubricating oil way to keep open, oil cup to maintain a certain level of oil;

(5) inspection and maintenance of coal machine, slagging machine, grate, fan, water pipeline valves, feed pumps, etc.;

(6) inspection and maintenance of secondary instrumentation and protection devices;

(7) removal of dust on the equipment and ancillary equipment.

4, the requirements of the test and inspection of safety accessories:

(1) safety valves manual release of steam or water test at least once a week; automatic release of steam or water test at least once every three months;

(2) pressure gauges in normal operation once a week flushing; storage elbow, at least once every six months to calibrate; and in the dial to indicate the working pressure of the red line, sealed after inspection;

(3) high and low water level alarm, low water level interlock device, overpressure, over-temperature alarm, overpressure interlock device, at least once a month for the alarm interlock test.

5, equipment repair and maintenance and safety accessories test calibration, to make a detailed record, the boiler room managers should be regularly checked.

Sixth chapter of the boiler water quality management

1, the boiler water must be treated, there is no reliable water treatment measures, water quality is not qualified, the boiler is not allowed to be put into operation.

2, the strict implementation of GB1576-85 standards, and strengthen water quality supervision.

3, boiler water treatment is generally used outside the pot chemical water treatment, for vertical, horizontal, internal combustion and small hot water boilers can be used in the pot dosing water treatment.

4, the use of pot dosing water treatment boiler, each shift must be hardness of feed water, pot water alkalinity, PH value of the three indicators at least one test (feed water test tank dosing water).

5, the boiler using chemical water treatment outside the pot, the feed water should be measured every 2 hours of hardness, PH and dissolved oxygen; pot water should be measured every 2-4 hours of alkalinity, chlorine, PH and phosphate.

6, full-time or part-time water quality laboratory technician, to be qualified by the labor department assessment before the water treatment work.

7, for the operation of the ion exchanger, to develop operating procedures for the characteristics of the equipment, and carefully implemented.

8, water treatment personnel should be familiar with the performance of equipment, instruments, pharmaceuticals, nature and use.

9, analysis and testing of chemicals with proper storage, flammable, explosive, toxic and harmful chemicals should be strictly in accordance with the provisions of the storage and use.

10, boiler out of service maintenance, the first water treatment personnel to check the corrosion of scaling, the composition and thickness of the scale, corrosion of the area and depth, as well as parts of a detailed record.

11, laboratory and water treatment room should be kept clean and sanitary, fire prevention measures.

12, the operation of water treatment equipment and water quality laboratory records filled out completely and correctly.

Chapter VII boiler safety and security

1, the boiler room is the use of boilers unit one of the harmful sectors, in addition to the boiler room staff, the relevant leadership and safety, security, production management personnel, other personnel are not allowed to enter without the relevant approval.

2, on-duty personnel to guard their posts, vigilance, strict implementation of safety and technical procedures and inspection system.

3, non-duty personnel, without the consent of the shift manager, are not allowed to switch the boiler room of various valves, smoke and wind door and electrical switches. Unlicensed stoker, water quality laboratory personnel are not allowed to operate alone.

4, the boiler room is prohibited from storing flammable, explosive substances, required to be loaded with a small amount of lubricating oil, cleaning oil drums, oil jugs, to be stored in the designated location, and pay attention to check the coal combustion of explosives.

5, the boiler in operation or during the pressure fire, the door is not allowed to lock or hew, pressure fire during the period to be monitored.

6, the boiler room should be equipped with fire-fighting equipment, careful management. Do not just move or diverted for other purposes.

7, the boiler once the accident, the duty officer should be accurate, rapid measures to prevent the expansion of the accident, and immediately report to the relevant leadership.

Chapter VIII boiler room cleanliness and hygiene

1, the boiler room is not allowed to store items unrelated to boiler operation, boiler coal, spare parts, operating tools should be placed in a designated place, neatly arranged.

2, boiler room floor level, walls, doors and windows should be kept clean and sanitary.

3, hand-burning furnace cast coal to clean up the coal scattered on the ground, keep the ground clean.

4, coal yard, slag yard to be set up separately, coal pile, slag pile of regular watering, stacked neatly.

5, before the end of each shift, the workplace, equipment, meters, valves, etc. clean.

6, weekly cleaning of the boiler room and the area under the control, to maintain a clean and beautiful environment.

7, the leader in charge of the organization should often organize the relevant personnel, the boiler room cleanliness inspection and evaluation, rewarding diligence and punishing laziness, to achieve cleanliness and hygiene, civilized production.

Chapter IX Boiler Accident Emergency Plan

1, an accident immediately cut off the power supply and water supply pipe valve, pull the "119" to request reinforcements, and the first time to the District Quality and Technical Supervision Bureau and other relevant departments to report.

2, according to the accident or danger, immediately organize and mobilize emergency rescue personnel, vehicles, equipment. Organization of rescue forces, quickly rushed to the scene.

3, there are casualties immediately contact with the emergency center and hospitals, requesting emergency vehicles and emergency preparedness, to ensure that the injured get timely medical treatment.

4, in the accident scene evidence collection and rescue operations, arrange for personnel to do a good job in the accident investigation and evidence collection, in order to facilitate the accident processing, to prevent the loss of evidence.

5, in the rescue operation, rescue personnel should strengthen self-protection, to ensure that the rescue operation process of personal safety and property safety.

Guangzhou air pollution prevention and control regulations?

Chapter I General Provisions

Article 1 for the protection and improvement of the atmospheric environment, prevention and control of air pollution, to protect public health, to promote the construction of ecological civilization, and to promote the sustainable development of economy and society, according to the "Chinese People's Republic of China *** and the State Environmental Protection Act" and "Chinese People's Republic of China *** and the State Prevention and Control of Air Pollution Act" and other laws and regulations, in conjunction with the actual situation of the province, the formulation of these regulations.

The second article of these regulations shall apply to the prevention and control of air pollution and its supervision and management in the administrative area of the province.

Article III of the people's governments at all levels shall be responsible for the quality of the air environment in the administrative region.

People's governments at or above the county level shall strengthen the leadership of the prevention and control of air pollution, optimize the industrial structure, energy structure and transportation structure, increase the financial investment in the prevention and control of air pollution, establish and improve the coordination mechanism for the prevention and control of air pollution, and supervise and oversee the relevant departments to carry out supervision and management responsibilities in accordance with the law.

Street offices should cooperate with the relevant departments to do a good job in the jurisdiction of the prevention and control of air pollution related supervision and management.

Article 4 of the people's governments at or above the county level, the ecological environment department of the people's government to implement unified supervision and management of air pollution prevention and control.

The relevant departments of the people's governments at or above the county level in accordance with relevant laws and regulations and the people's governments at their level on the ecological environmental protection work of the division of responsibilities, in accordance with the following provisions, to carry out the supervision and management of air pollution prevention and control:

(a) supervision and management of industrial pollution prevention and control: the competent department of ecological environment is responsible for supervision and management of industrial air pollution prevention and control; the competent departments of development and reform Responsible for industrial restructuring, optimization of layout and related supervision and management work, responsible for the control of total coal consumption, energy restructuring and related supervision and management work, responsible for the coordination of energy supply, and promote the clean and efficient use of coal in the field of power generation; the competent department of industry and information technology is responsible for organizing and promoting the technological transformation and upgrading of industrial enterprises, the elimination of outdated production capacity and related supervision and management work; the competent department of market supervision and management, Customs and other departments within their respective areas of responsibility for the production, sale and import of coal, oil, biomass molding fuel and other energy and motor vehicles and ships, non-road mobile machinery fuel, engine oil, nitrogen oxide reductants and other additives to implement supervision and management of the quality.

(ii) supervision and management of mobile source pollution prevention and control: development and reform, industry and information technology, transportation authorities in charge of the supervision and management of the promotion of new energy vehicles within their respective areas of responsibility; ecological and environmental authorities in conjunction with the public security organs of the traffic management department, the transport authorities in charge of the implementation of the supervision and management of the prevention and control of air pollution from motor vehicles; ecological and environmental authorities in conjunction with the transport, Housing and urban-rural construction, agriculture and rural areas, water administration, market supervision and management of the competent authorities of the prevention and management of air pollution from non-road mobile machinery; the competent departments of transportation, maritime administration agencies in their respective areas of responsibility for the prevention and management of air pollution from transport vessels, the competent departments of agriculture and rural areas are responsible for the prevention and management of air pollution from fishing vessels.

(3) supervision and management of dust pollution prevention and control: the competent ecological environment department is responsible for the supervision and management of dust pollution prevention and control of industrial enterprises' material dumps; the competent department of housing and urban-rural construction is responsible for the supervision and management of dust pollution prevention and control of construction activities of housing and municipal engineering, ready-mixed concrete and ready-mixed mortar production activities; the competent departments of urban management, municipal sanitation and gardening are responsible for the supervision and management of municipal utilities, urban roadways and urban roads within their own scope of responsibilities. The competent departments of urban management, municipal sanitation, gardening and landscaping are responsible for the supervision and management of the prevention and control of dust pollution from municipal utilities and urban road cleaning; the competent departments of natural resources are responsible for the supervision and management of the prevention and control of dust pollution from the demolition of illegal land use of buildings and structures, mine mining and mine geo-environmental treatment projects; the competent departments of transportation are responsible for the construction, maintenance and demolition of roads, ports and terminals and other transportation infrastructure and the use of the construction of bare ground parking lots. Bare ground parking lot dust pollution prevention and control, as well as highway cleaning and cleaning and greening projects, greening operations, port terminal project storage material dust pollution prevention and management; water administrative departments responsible for water conservancy project construction activities and sand farms within the management of the supervision and management of the prevention and control of dust pollution; agriculture and rural areas are responsible for the competent departments of agricultural production activities to emit atmospheric pollutants and straw and other agricultural wastes Supervision and management of the comprehensive utilization of straw and other agricultural wastes.

(d) Other supervision and management of air pollution prevention and control is organized and implemented by the relevant departments within their respective areas of responsibility.

Article V citizens, legal persons and other organizations shall enjoy the right to obtain information on the atmospheric environment, participation and supervision of atmospheric environmental protection.

The ecological environment department of the people's governments at or above the county level and other departments with supervisory and management responsibilities for the atmospheric environment shall, in accordance with the law, publicize information on the state of the quality of the atmospheric environment, and improve the public participation procedures, and facilitate public participation in and supervision of the protection of the atmospheric environment.

Article 6 enterprises, institutions and other producers and operators shall implement the national and provincial air pollutant emission standards and technical specifications, from the source, the production process and the end of the selection of pollution prevention and control technology, to prevent and reduce atmospheric pollution, and the damage caused by the responsibility according to law.

Industry associations should strengthen industry self-discipline, air pollution prevention and control laws, regulations and related knowledge of publicity, urge members to take effective measures to prevent and reduce air pollution.

Citizens should enhance the awareness of atmospheric environmental protection, adopt a green, low-carbon, thrifty lifestyle, and consciously fulfill the obligations of atmospheric environmental protection.

Article VII of the people's governments at all levels and their relevant departments and social organizations, schools, news media, grass-roots mass self-governance organizations shall carry out publicity and education on laws and regulations on the prevention and control of atmospheric pollution, popularize the scientific knowledge of air pollution prevention and control, and advocate civilized, frugal, low-carbon, green consumption habits and lifestyles.

Chapter II standards and upgrade planning

Article VIII of the people's governments at or above the county level shall incorporate the prevention and control of air pollution into the national economic and social development planning, and the prevention and control of air pollution and the main functional areas of the planning, land use planning, urban and rural planning, and with the energy structural adjustment, industrial structural adjustment and the transformation of the mode of development, etc..

City people's government preparation or modification of urban planning, should be based on the carrying capacity of the atmospheric environment, in accordance with the principle of conducive to the dissipation of air pollutants, rational planning of urban construction space layout, control the density and height of the building, reserved for urban ventilation corridors.

In the ventilation corridor shall not build high-rise building groups and other construction projects that affect the conditions of atmospheric dispersion.

Article IX does not meet the national air quality standards of the people's government of the city shall promptly prepare the air quality standards, take measures to achieve the air quality standards in accordance with the State Council or the provincial people's government to provide the deadline.

The people's governments of cities at or above the prefectural level that have reached the national atmospheric quality standards shall prepare plans for sustained attainment and improvement of atmospheric quality, and take measures to maintain and improve the quality of the atmospheric environment.

The preparation of air quality standards for a limited period of time to achieve the plan and continue to meet the standards and upgrade the plan, should seek the views of relevant industry associations, business institutions, experts and the public and other parties.

Article 10 of the atmospheric environment quality deadline to achieve the standard planning and sustained compliance and upgrading planning shall be open to the public. Municipal people's governments at or above the prefectural level of the atmospheric environment quality standards shall be reported to the State Council ecological and environmental authorities for the record, sustained compliance and enhancement planning shall be reported to the provincial people's government ecological and environmental authorities for the record.

City people's governments shall report annually to the people's congresses or standing committees of the people's congresses at their respective levels on the state of the environment and the fulfillment of environmental protection objectives, they shall report on the implementation of plans for attaining atmospheric environmental quality standards in the limited term or for continuing to attain the standards and upgrading the plans and make them available to the public.

Atmospheric environmental quality plans to meet the standards for a limited period of time and sustained compliance and upgrading plans shall be assessed and revised in due course in accordance with the requirements of air pollution prevention and control and economic and technical conditions.

Article 11 of the atmospheric environmental quality plan to meet the deadline and sustained compliance and enhancement planning should be the administrative region of environmental quality and its impact on the analysis of factors, to determine the quality of the atmospheric environment in phases to improve the target, and to clarify the corresponding responsibility of the main body, the focus of the work and safeguard measures.

Chapter III supervision and management

Article XII of the key air pollutant emissions total control system. Key air pollutants, including sulfur dioxide, nitrogen oxides and other pollutants determined by the state and the province to determine the volatile organic compounds and other pollutants.

Provincial people's government in accordance with the total control targets issued by the State Council and the State Council ecological and environmental authorities of the decomposition of the total control target requirements, taking into account the level of economic and social development of the region, the industrial structure, atmospheric environmental quality conditions and other factors, will be key air pollutant emissions total control targets decomposed and implemented to the people's governments of municipalities above the prefectural level.

The people's governments of municipalities at or above the prefecture level shall control or reduce the total amount of emissions of key air pollutants in accordance with the total control targets of the administrative region.

Enterprises, institutions and other producers and operators in the implementation of national and local standards for the emission of pollutants, at the same time, shall comply with the decomposition and implementation of the total emission control targets of key air pollutants to the unit.

Article 13 of the new construction, alteration and expansion of new construction projects emitting key air pollutants, the construction unit shall apply to the competent ecological and environmental authorities in accordance with the provisions of the key air pollutant emission control targets before submitting and approving the environmental impact assessment documents.

The competent ecological and environmental authorities in accordance with the principle of equal or reduced substitution approved the total emission control indicators of key air pollutants.

The new key air pollutant emission control indicators can be obtained through the implementation of engineering treatment and emission reduction, structural adjustment and emission reduction projects or emissions trading.

Article 14 of the people's governments at or above the county level, the competent departments of ecological environment shall, in accordance with the relevant provisions of the state and province, establish and improve the monitoring network of the quality of the air environment in the administrative region and the monitoring network of atmospheric pollution sources, and to ensure that the monitoring facilities for normal operation.

Industrial parks, industrial parks, development zones, management agencies and key emission units shall, in accordance with the relevant provisions of the state and province, set up with the competent ecological and environmental authorities monitoring and control platform networking monitoring and control facilities for atmospheric characteristics of pollutants, to ensure that the monitoring and control facilities are operating normally and in accordance with the law, to disclose emission information.

Article XV of the key emissions unit installed automatic monitoring equipment included in the mandatory verification of measuring instruments catalog, in accordance with relevant national and provincial regulations for measurement and verification; not included in the mandatory verification of measuring instruments catalog, commissioned by the sewage unit has the corresponding verification capacity of the metrological verification agency for measurement and verification.

Measurement and testing and normal operation of automatic monitoring equipment monitoring data can be used as a basis for administrative law enforcement.

Whether the monitoring data of the automatic monitoring equipment exceeds the air pollutant emission standards, according to the hourly average value to determine.

No unit or individual may damage, destroy or remove without authorization the automatic monitoring equipment for air pollutant emissions, or tamper with or falsify the monitoring data.

Article 16 of the provincial people's government shall formulate and regularly revise the list of highly polluting industrial projects prohibited from new construction, expansion and the elimination of highly polluting processes and equipment, and publicize them to the public. Prohibit the new construction and expansion of highly polluting industrial projects included in the list. It is prohibited to use highly polluting processes and equipment on the elimination list. The elimination of highly polluting processes and equipment shall not be transferred to others for use.

The people's governments of cities and counties at or above the prefecture level shall organize the development of the administrative area of the existing highly polluting industrial projects to adjust the exit plan, and organize the implementation.

Chapter IV Prevention and Control of Industrial Pollution

Section I Prevention and Control of Pollution from Energy Consumption

Article 17 The Pearl River Delta Region prohibits the construction of new or expanded coal-fired and oil-fired thermal power generating units or coal-fired and oil-fired self-provided power stations of enterprises.

The Pearl River Delta Region prohibits the construction of new and expansion of steel, crude oil processing, ethylene production, paper making, cement, flat glass, ceramics other than special ceramics, non-ferrous metal smelting and other air pollution projects outside the national plan.

The coal-fired generating units in the administrative area of the province should be shut down and decommissioned on schedule. People's governments at or above the county level to promote longer service time of coal-fired generating units early retirement.

Article 18 of the province to implement total coal consumption control.

The competent department for development and reform of the provincial people's government shall, in conjunction with the relevant departments to determine the total amount of coal control targets, clear implementation path.

The people's governments of municipalities at or above the prefecture level shall, in accordance with the total coal control target, formulate plans for coal reduction and clean energy transformation, and organize the implementation.

People's governments at or above the county level shall adopt economic and technological policies and measures conducive to the reduction of the total amount of coal, adjust the energy structure, promote the development and utilization of clean energy, and guide enterprises to implement clean energy substitution measures.

Article 19 of the thermal power, iron and steel, petroleum, chemical, flat glass, cement, ceramics and other key air pollution industry enterprises and boiler projects, should adopt advanced and feasible technology for pollution prevention and control, so that the concentration of key air pollutant emissions to meet the national and provincial ultra-low emission requirements.

Article 20 of the municipal people's governments at or above the prefecture level shall organize the preparation of regional heat supply planning, construction and improvement of heat supply system, the conditions of industrial parks, industrial parks, development zones of heat-using units to implement centralized heating, and gradually expand the coverage of the heat supply pipeline network.

In the centralized heating pipe network coverage, prohibit the construction of new, expanding coal-fired, heavy oil, residual oil, biomass and other decentralized heating boilers; has been built can not meet the emission standards of the heating boiler should be dismantled in the people's governments at or above the county level within the period specified.

Article 21 prohibits the installation of the state and province expressly eliminated, mandatory retirement, prohibit the manufacture and use of boilers and other combustion equipment.

The people's governments of cities at or above the prefectural level shall, according to the needs of air pollution prevention and control, restrict the use of highly polluting boilers and kilns.

Article 22 prohibits the installation and use of non-specialized biomass boilers. Prohibit the installation and use of dual-fuel or multi-fuel biomass boilers that can burn coal and its products.

Biomass boilers should be processed woody plants or herbaceous plants as fuel, it is prohibited to mix and add combustion produces toxic and harmful soot and malodorous gases of other substances, and is equipped with high-efficiency dedusting facilities, in accordance with the relevant provisions of the state and province to install automatic monitoring or monitoring equipment.

Section II volatile organic pollutants pollution prevention and control

Article 23 of the people's governments at or above the county level in charge of forestry and gardening work of the competent departments shall, according to the prevention and control of atmospheric pollution, species diversity, plant growth dynamics, ecosystem function, geographic conditions, and other needs, to choose the appropriate greening tree species, to reduce the emission of volatile organic compounds from plant sources.

The competent departments of the people's governments at or above the county level responsible for forestry and gardening work and the competent departments of agriculture and rural areas shall take measures to encourage the promotion and application of green pesticide formulations.

Article 24 of the provincial people's government department in charge of ecology and environment shall, in conjunction with the competent department for standardization, formulate standards for the limit of the content of volatile organic compounds in products, specify the content of volatile organic compounds, and make it known to the public.

In this province, the production, sale, use of raw materials and products containing volatile organic compounds, the volatile organic compounds content should be in line with the provincial limit standards. High volatile organic compounds content of products, should be labeled in the packaging or instructions for volatile organic compounds content.

Article 25 of the provincial people's government departments in charge of ecological environment shall, in conjunction with the standardization and other competent departments, the development of the province's key industries volatile organic compounds emission standards, technical specifications.

Enterprises, institutions and other producers and operators should be in accordance with the volatile organic compounds emission standards, technical specifications