Large equipment transportation basic operational program requirements?

What are the basic operational requirements for the transportation of large equipment, the following Zhongda consulting bidding teacher for you to answer for reference.

According to the waterways, highways and railroads from the main production plants to the project site, after consultation, calculation and demonstration, the transportation of large pieces of equipment is usually used as follows:

1. Along the highway operation: before the transportation of large pieces of equipment, it should be in conjunction with the relevant units of the road underground pipeline facilities for inspection, measurement and calculation, which determines the driving route and the measures that need to be taken. Measures to be taken.

2. Along the bridge work: according to the vehicle transportation route, according to the design load of the bridge, the use of years and the condition of the bridge, the vehicle before traveling to each bridge for testing, calculating, and take the relevant repair and reinforcement measures.

3. On-site road work: both sides of the road (the original drainage ditch) and then fill with large stones and cover the thick steel plate reinforcement; after the vehicle stops at the designated location, consider jacking, shifting, hauling and other operations, in the work area are paved with thick steel plate to increase the load-bearing capacity; along the way, other obstacles to construction should be demolished and removed as much as possible.

4. large transport operations, the whole process is entrusted to the relevant competent units and departments of the important roads, road sections and all bridges for guidance, monitoring, testing, to ensure the reliability and safety of vehicles and facilities during transportation operations.

5. Supervision of bulky transportation: prepare all the written supporting information before the transportation operation, formulate the transportation operation plan for the company's approval, and organize discussions to clarify the scope of work of each unit, responsibilities, and supervisors. Before the transportation operation, we will make the necessary technical and safety briefing to the operators, and make a comprehensive inspection of the operating vehicles and work equipment to ensure that the transportation of large equipment is foolproof.