What is the standard lightning inspection fee? Any netizen clear?
Guigang City Lightning Protection Center: your center reported "on the approval of Guigang City, lightning detection charges," (Gui Lei Fa [2011] No. 1) received. In view of the Guigang City Price Bureau "on the city of lightning protection center mine detection charges approved" (Guigang price fee 〔2008〕 No. 29) the provisions of the mine detection charges trial period has expired. According to the trial, after study, agreed to your center lightning detection charges to official charges, is now on the relevant issues are notified as follows: First, lightning detection charges, charges, testing and measurement and service content, specific details are shown in Annex I, Annex II and Annex III. Second, lightning detection charges and other related issues in accordance with the Autonomous Region Price Bureau and the Municipal People's Government of the relevant provisions of the implementation. Third, lightning detection charges are service charges, charges should be in accordance with the provisions of the Municipal Price Bureau for "service charge license", the implementation of the fee announcement system. Annex: I. Lightning detection charges and charges table II, lightning protection device regular safety testing measurement table III, lightning protection charges service content table Annex I: lightning detection charges and charges table No. charges billing unit charges standard preparation? Note a lightning protection technology evaluation I. Only the information system lightning protection device, mobile communication base station lightning protection device for special lightning protection technology evaluation, according to the total investment in lightning protection device 1% charge. Second, lightning risk assessment commissioned by the owner, the assessment is limited to one or two types of lightning protection of new buildings (structures). Third, the completion of the acceptance test contains lightning protection hidden project section tracking test. Fourth, the new buildings (structures) ≥ 15 floors, the high part of the additional charge for high-rise buildings, lightning protection side-strike device completion acceptance testing fee 0.15 yuan / square meter. Fifth, can not be charged by the area of the new construction, alteration, expansion of buildings (structures), according to the national lightning protection technical specifications for the test point charges. Sixth, the testing unit commissioned to test the project with the location of the project 30 kilometers (including) to carry out testing operations, the transportation and other travel costs agreed upon by the two sides. Seven, lightning category identified by the "Building Lightning Protection Design Code" (GB50057-1994) and other lightning protection technical specifications. New buildings (structures) lightning protection scheme design technical evaluation of square meters (floor area) 0.15 yuan two lightning risk assessment according to the main building fee of 0.8 ‰ three lightning disaster investigation and appraisal of the two sides negotiated four lightning protection device acceptance test 1 new buildings (structures) lightning protection device acceptance test square meters (floor area) of a class of lightning 1.25 yuan, two types of lightning 1.15 yuan, three types of lightning 1.05 yuan 2 information system lightning protection device completion acceptance test (1) machine room area <20 square meters 200 yuan (2) machine room area of 20?-40 square meters 350 yuan (3) machine room area of 41?-70 square meters 500 yuan (4) machine room area of 71?-100 square meters 800 yuan (5) machine room area of 101?-150 square meters 1100 yuan (6) Machine room area ﹥ 150 square meters of 1500 yuan (7) wireless local telephone base station of 150 yuan (8) mobile communication base station of 600 yuan five lightning protection device regular safety testing a elevator grounding resistance test, soil resistivity test, lightning wave intrusion detection, SPD degradation test charges with reference to the lightning induction (electrostatic) device testing standards. Second, the grounding network according to the area (per square meter) charges, with reference to the new construction (structures) building lightning protection device completion acceptance test charges. Grounding network does not include power system grounding network. Third, special, new lightning protection devices include: advance discharge lightning rod, current-limiting lightning rod, plasma lightning arrester, electrolytic ground pole. Fourth, the charges for the five lightning protection device regular safety testing charges, can not be cross and repeated charges. 1 a lightning protection building test point 90 yuan 2 two lightning protection building test point 80 yuan 3 three lightning protection building test point 70 yuan 4 chimneys, water towers lightning detection test point 100 yuan 5 independent lightning rod test point 90 yuan 6 lightning induction (electrostatic) device test point 50 yuan 7 high-rise buildings ( ≥ 15 floors or 45.0 meters) anti-direct lightning detection test point 130 yuan 8 high-rise buildings (≥ 15 floors or 45.0 meters) anti-side-strike lightning detection test point 60 yuan 9 special, the new lightning protection device test set of 800 yuan 10 information systems lightning protection device periodic safety testing according to the information systems lightning protection device acceptance testing standards for the completion of the implementation of the Annex II: Lightning Protection Device Periodic Safety Inspection Measurement Table Serial No. Item? Item Measurement method Remarks? Note 1 independent lightning rod test each counted 1 test point 1, each test point charges should be charged according to the lightning protection charges and charges table (Annex I) in the corresponding items, units and standards. 2, according to lightning protection norms lead line spacing standards counting lead line grounding resistance test points, each lead line counted 1 test points. The number of lead wires is more than the standard measurement point according to the standard. The number of lead wires is less than the standard according to the actual number of test points. 3, each billboard counted 1 test point, length or height of more than 10 meters, each additional 10 meters plus 1 test point. 4, side-strike lightning protection detection detection for the starting range of 15 floors or more than 45.0 meters, the detection of the intervals, a type of lightning protection at intervals of 12 meters, the second type of lightning protection at intervals of 18 meters, the third type of lightning protection at intervals of 25 meters counted 1 test point. 5, side-strike lightning protection detection with the glass curtain wall lightning protection. Protection detection and glass curtain wall lightning detection can not be repeated. Grounding network lightning protection testing and artificial grounding body lightning protection testing can not be repeated. 6, the sky surface metal objects lightning protection testing: each sky surface of all solar water heaters count 1 test point, all satellite dishes count 1 test point, the rest of the metal objects count 1 test point. 7, soil resistivity test each time the count of 4 test points (east, south, west, north). 8, each open-air oil and gas tanks count 2 test points, buried oil and gas tanks count 1 test point. 9, SPD deterioration detection, sampling rate shall not exceed 20% of the total number of SPD. 2 overhead lightning line detection of each lightning line counted 2 test points 3 lightning belt (lightning grid) detection of each building counted 1 test point 4 lead detection see Notes 25 glass curtain wall lightning detection of each 10m × 10m counted 1 test point 6 antenna tower lightning detection of each counted 1 test point 7 high-pole street lamp lightning detection of each pole counted 1 test point 8 metal flagpole Grounding lightning detection per pole count 1 test point9 outdoor independent billboard lightning detection see note 310 chimneys, water towers lightning detection each count 1 test point11 Side-strike lightning detection see note 412 sky metal objects lightning detection see note 613 elevator grounding resistance test each elevator count 1 test point14 power distribution box grounding resistance test each building count 1 test point15 weak power box grounding resistance test each building count 1 Test point 16 shielding efficiency test each shielding surface counted 2 test points 17 equipotential connection test each building counted 1 test point 18 SPD (lightning arrester) deterioration test each counted 1 test point 19 soil resistivity test see Note 720 transformer lightning protection test each counted 1 test point 21 power system lightning protection test each oil (gas) station counted 1 test point 22 monitoring and alarm system lightning protection test each oil (gas) station counted 1 test point 23 charging system lightning detection per oil (gas) station counted 1 test point 24 oil and gas tank grounding resistance test see Note 825 oil and gas tank breathing valve lightning induction, anti-static detection of each counted 1 test point 26 refueling (gas) machine lightning induction, anti-static detection of each counted 1 test point 27 crane, trestle lightning induction, anti-static detection of each counted 1 test point 28 charging tanks weigh lightning induction, anti-static test 1 test point per pole 29 unloading (gas) anti-static grounding resistance test 1 test point per meter 30 oil (gas) pump lightning induction, anti-static test 1 test point per meter 31 generator grounding resistance test 1 test point per meter 32 main oil (gas) pipeline lightning induction, anti-lightning wave intrusion measures to detect 1 test point per meter Appendix III: Lightning Protection Charges Service Table No. Charge Item Service Contents of a lightning protection technology evaluation 1, new buildings (structures) lightning protection device design program technical evaluation of a? Technical evaluation items: 1, design unit qualification, 2, design basis, 3, lightning protection category, 4, basic grounding, artificial grounding, safety distance, total equipotential connection, local equipotential connection, grounding trunk, reserved grounding terminals, 5, lead location, lead spacing, number of lead wires, lead wire materials, lead test card or disconnecting the card, 6, equalizing ring, 7, side-strike lightning protection measures, 8, Lightning arrester protection range, 9, lightning rod layout and materials, lightning belt (network) layout and materials, the surface of the metal object grounding,? Reserve grounding terminals on the sky, 10, the grid of the sky, the foundation grid, the grid composed of lead wires and equalizing rings, the lightning protection grid of the glass curtain wall and the grounding method, 11, access to the building of each metal pipeline, power lines, communication lines, electrical equipment in the building, the building of large-scale metal objects, equipotential measures and SPD and other over-voltage protection measures, 12, the form of power supply, power supply, grounding method, Surge protector (low-voltage), 13, lightning protection for weak power system (including TV, **, network, fire linkage, monitoring, etc.), 14, integrated wiring, 15, welding and rust requirements, lightning protection construction drawings, 16, electromagnetic safety distance. Two? , the general evaluation of the design program: 1, whether the design program meets the requirements of lightning protection technical specifications, technical standards, 2, lightning protection design program review, 3, lightning protection design program analysis and evaluation, 4, lightning countermeasures and measures, 5, the preparation of the "Lightning Protection Device Design Audit Opinion". 2, special lightning protection device design program technical evaluation a? Technical evaluation of the project: 1, lightning protection engineering contract, 2, lightning protection engineering professional qualifications, 3, lightning protection engineering design, construction personnel qualifications, 4, ? Design basis, 5, lightning protection category, 6, lightning protection status quo and site survey data, 7, independent needle, lightning line protection range, 8, lightning short needle layout and materials, lightning belt (network) layout and materials, sky surface metal object grounding, ? Sky surface reserved grounding terminals, 9, the location of the lead wire, lead wire spacing, the number of lead wires, lead wire materials, lead wire test card or disconnect card, 10, information systems room environment, 11 power supply form, power supply, grounding, surge protector (low-voltage), 12, lightning protection of the weak power system (including TV, **, network, fire linkage, monitoring and control, etc.), 13, integrated cabling, 14, welding and Rustproof requirements, 15, machine room lightning ground, AC ground, DC ground, safety ground and other grounding systems, 16, shielding, 17, electrostatic protection, 18, equipotential connection, 19, SPD type, parameters, performance, installation, 20, electromagnetic safety distance. Two? , general assessment of design scheme: 1, whether the design scheme meets the requirements of lightning protection technical specifications and technical standards, 2, lightning protection design scheme review, 3, lightning protection design scheme analysis and evaluation, 4, lightning protection countermeasures and measures, 5, preparation of the "Lightning Protection Device Design Review Opinion". Lightning risk assessment 1, lightning protection status quo survey, 2, data collection, calculation, analysis, 3, lightning risk identification, 4, lightning risk analysis and evaluation, 5, lightning protection countermeasures, 6, preparation of lightning risk assessment report. Three lightning disaster investigation and appraisal 1, lightning site investigation, 2, lightning damage investigation, 3, lightning protection device safety performance analysis and evaluation, 4, lightning cause analysis, 5, lightning identification, 6, lightning safety recommendations, 7, lightning investigation and appraisal report preparation. Four new buildings (structures) lightning protection device acceptance test 1, used as a vertical grounding body of the pile foundation reinforcement diameter, number, pile foundation reinforcement and bearing platform, floor, ground beam reinforcement welding, corrosion prevention measures, grounding resistance inspection and testing. 2, used as a horizontal grounding body of the bearing platform, floor, ground beam reinforcement diameter, number, reinforcement welding and welding and flat steel, angle welding, reserved grounding terminal welding, corrosion prevention measures, depth of grounding body, grounding body. Measures, depth of grounding body, grounding resistance inspection and testing. 3, artificial grounding body materials, welding, corrosion prevention measures, burial depth, vertical grounding body spacing, equalization grid, grounding resistance inspection and testing. 4, used as a lead wire structural column rebar diameter, number, welding inspection and measurement, used as equalization ring structural ring beams rebar diameter, number, welding inspection and measurement, equalization ring and the lead wire welded, the external wall metal Doors and windows reserved grounding terminal welding, reserved equipotential connection terminal welding, wiring metal pipe grounding, bathroom local equipotential connection welding, corrosion prevention measures, grounding resistance inspection and testing. 5, lightning rods and lightning straps diameter, height, welding, corrosion prevention measures, lightning straps mesh size, support card spacing, turning angles, expansion joints to compensate for the welding with the lead, reserved equipotential connection terminal welding, grounding resistance inspection and testing. 6, the roof metal reinforcement diameter, number, welding check measurement. Inspection and testing.6. Equipotential connection of overhead metal objects, grounding inspection and testing of external metal doors and windows, railings, glass curtain walls, decorative metal panels, billboards.7. Connection of metal equipment in the bathroom, vertical metal piping, elevator guide rails, grounding trunk grounding, grounding inspection and testing of inlet and outlet metal piping.8. Power supply, **, cable TV, broadband network into the way, shield grounding inspection and testing, total equipotential connection Power distribution box, ** distribution box, TV front-end box, broadband network junction box, fire protection system, monitoring system grounding inspection and testing, power and signal SPD installation, metal trunking, wiring metal pipe grounding inspection and testing. 9, integrated wiring inspection and testing. 10, disconnect card or test card installation, height, grounding resistance, external lead near the ground end of the protective measures, corrosion prevention measures for exposed metal objects inspection and testing. 11, insulation resistance testing of power distribution systems. 12, test data analysis, calculation. 13, analysis and evaluation of lightning safety performance. 14, lightning protection devices comprehensive quality assessment. 15, the preparation of new buildings (structures) lightning protection device acceptance test report. Five information systems lightning protection device acceptance test, regular safety testing 1, information systems 1, computer room power and signal lines into the way, shield grounding, zero ground voltage detection. 2, computer room integrated cabling, shielding inspection and measurement. 3, SPD installation location, spacing, type, number, parameter checking and testing. 4, the type of computer room grounding line, grounding wire type, specifications, grounding resistance, the room, all kinds of enclosures, cabinets, cabinets and other equipment. Various enclosures, cabinets, anti-static floor racks, shielding tubes, metal doors and windows, partition walls, suspended ceilings and other potential connections, grounding resistance inspection and testing. 5, temperature and humidity in the server room, the volume resistivity of the anti-static materials in the server room, static potential detection. 6, SPD deterioration spot-checking and testing: leakage current, residual voltage, voltage-sensitive voltage, ignition voltage. 7, the server room power supply quality testing (voltage fluctuations, harmonics, frequency fluctuations, phase sequence). 8, measurement of SPD deterioration spot-checking and testing: leakage current, residual voltage, pressure-sensitive voltage, ignition voltage. Phase sequence). 8, measurement and calculation of 2.4 Gaussian line. 9, test data analysis, calculation. 10, lightning safety performance analysis and evaluation. 11, lightning protection device comprehensive quality assessment. 12, the preparation of information systems, lightning protection device acceptance or test report. 2, wireless base station 1, antenna pole height, grounding, grounding wire material type, grounding resistance, calculation of the antenna pole protection range. 2, antenna feeder shielding Grounding, grounding set row cross-sectional area inspection and measurement, low-voltage wire shielding, signal line shielding, SPD installation inspection and testing, chassis grounding resistance testing.3, test data analysis, calculation.4, lightning safety performance analysis and evaluation.5, lightning protection device comprehensive quality assessment.6, the preparation of the acceptance of the wireless telephone lightning protection device or test report.3, mobile communication base station 1, antenna tower height, grounding method, Grounding number, grounding wire type, grounding resistance value inspection and testing, calculation of antenna tower protection range. 2, antenna feeder shielding grounding number, location, SPD installation inspection and testing. 3, the nature of the grounding body, layout, grounding into the wire type, length, grounding busbar (line) cross-sectional area, DC workplace, safety protection ground type, grounding resistance inspection and testing. 4, high-voltage power line into the line way, lightning line Length, SPD installation quantity and location, transformer SPD installation, transformer grounding resistance inspection and testing. 5, low-voltage cable into the line way, alignment, SPD installation quantity, parameters and location inspection and testing. 6, the signal line type, into the line way? , shielding layer and empty wire pair grounding, SPD installation, fiber optic shielding layer and reinforcing core grounding inspection and testing. 7, various metal pipes in the server room, cable shielding layer, cable racks in the server room, equipment enclosures, shielding tanks, metal doors, windows, suspended ceilings, etc. for equipotential connection inspection and testing. 8, SPD leakage current, residual voltage, voltage-sensitive voltage, ignition voltage detection. 9, test data analysis, calculation. 10, lightning protection safety Performance analysis and evaluation. 11, lightning protection device comprehensive quality assessment. 12, the preparation of mobile communication base station lightning protection device acceptance or test report. Six lightning protection devices regular safety testing