What is the full name of FATP in manufacturing?

The full name of FATP in manufacturing is Final assembly test and pack, meaning final assembly test and pack. Refers to the parts will be assembled according to the specified technical requirements, and after debugging, testing to make it a qualified product process, assembly begins with the design of the assembly drawings.

Products are composed of several parts and components. In accordance with the specified technical requirements, a number of parts into components or a number of parts and components into a product of the labor process, known as assembly. The former is called parts assembly, the latter is called total assembly. It generally includes assembly, adjustment, inspection and testing, painting, packaging and other work.

Process

1, the development of the assembly line process and the basic principles of the original data of the assembly line to reasonably arrange the assembly sequence, minimize the workload of the assembly of clamping assembly, shorten the assembly cycle of the assembly line to improve the assembly efficiency, to ensure the quality of the assembly line of products, a series of requirements is the development of the assembly line of the basic principles of the process. Formulate the assembly process of the original data is the product acceptance of technical standards, the product's production program, the existing production conditions.

2, the content of the assembly line process regulations analyze the assembly line product assembly diagram, divided into assembly units, to determine the order of assembly of parts and components and assembly methods; to determine the assembly line of the assembly process of the technical requirements of the assembly, inspection methods and inspection tools;

Selection and design of the assembly process in the required tools, fixtures and special equipment; to determine the assembly line assembly of parts and components of the transportation method of transportation tools; to determine the assembly line assembly Transportation tools; determine the assembly line assembly time quota.

3, the development of the assembly line process steps first analysis of the assembly line of the original product data; to determine the assembly line of the assembly method of organization; division of the assembly unit; to determine the order of assembly; division of the assembly process; the preparation of the assembly process documentation; the development of the product inspection and test specifications.