I. Investment estimation
Investment estimation refers to the process that the construction unit or its entrusted consulting organization estimates and determines the investment required for the proposed project according to the project proposal, estimation indicators and relevant information of similar projects during the project proposal and feasibility study stage.
Investment estimation is the main basis for decision-making, financing and cost control.
Second, the design budget
Design budget is an important part of design documents. According to the drawings and specifications of preliminary design (or technical design), budget quota (or budget index) and various charging standards, the design unit prepares the budget price of equipment and materials, and determines the document of total project cost, which is controlled by investment estimation and delivered at any time.
Generally speaking, the design budget is a general calculation of the project cost according to the design requirements.
Design budget is the maximum amount of project investment. According to the sequence and scope of compilation, the budget can be divided into three levels: unit project budget, single project comprehensive budget and total construction project budget.
The unit project budget is the document to determine the project cost of each unit, the basis for compiling the comprehensive budget of individual projects, and an integral part of the comprehensive budget of individual projects.
(1) unit project budget can be divided into construction project budget, equipment and installation project budget according to the nature of the project.
(2) Comprehensive budget of individual projects. The comprehensive budget estimate of a single project is a document to determine the cost of a single project on the basis of the budget estimate of each unit of a single project, and it is an integral part of the total budget estimate of a construction project.
(3) Total budget of the construction project. The total budget of a construction project is a document to determine the total cost of the whole process from preparation to completion and acceptance of the construction project, which consists of the comprehensive budget of each individual project, the budget of other expenses of the construction project, the preparation fee during the construction period and the loan interest.
Third, the construction drawing budget
Construction drawing budget, also known as design budget, is a technical and economic document of construction and installation project cost compiled and determined by the design unit (or intermediary agency or construction unit) after the completion of construction drawing design, as well as the current budget quota or valuation table, cost quota and the budget price of labor, materials and mechanical equipment in this area. It should be controlled within the cost determined in the design budget.