The pump is a heating and air conditioning system in the key equipment, manual selection can only be a limited number of pump selection, it is difficult to select the optimal pump. What do I need to pay attention to when signing a contract for the purchase and sale of water pump equipment? The following is my pump equipment for you to organize the purchase and sale contract model, thank you for reading.
On the pump equipment purchase and sales contract model 1
Purchaser: hereinafter referred to as Party A
Supplier: hereinafter referred to as Party B. The pump equipment purchase and sales contract model 1
The pump equipment purchase and sales contract model 1
Purchaser: hereinafter referred to as Party A
Supplier: hereinafter referred to as Party B .
After full consultation between the two sides, this contract, in order to **** with the compliance.
I. Purchase content:
II. Purchase and sale mode:
1- Goods to the site, Party A to pay the payment to Party B, according to the actual amount of payment on arrival after unloading to the location designated by Party A.
2- Party B delivered the goods in accordance with the contract, Party A pays up to 97% of the contract amount (59140.70 yuan). The remaining 3% ($1829.10) is the warranty deposit, which will be paid before January 1, 20_.
Third, the contract signed and sealed after the entry into force of the contract implementation period, A and B shall not be arbitrary change or terminate the contract, the contract, if any outstanding matters, shall be negotiated by the two sides *** with the supplemental provisions, supplemental provisions and the contract has the same effect. This contract in duplicate, A and B each party.
Fourth, the two sides to resolve any outstanding issues by negotiation, or to the supplier or purchaser of any party to the seat of the court litigation.
V. Warranty period: one year and six months, the warranty period of the quality of the repair package replacement. Human-induced damage to the product, Party A at its own expense.
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ year ____ month ____ day _________ year ____ month ____ Day
On the pump equipment purchase and sale contract 2
Party A:
Party B:
According to the "Chinese People's Republic of China *** and the State Contract Law" and other relevant laws and regulations, A, B and the two sides of the spirit of honesty and credit, the principle of equality and mutual benefit, through the two sides of the negotiation, on the purchase of water supply to the B, the sewage pumps Equipment, reached agreement, and hereby enter into this contract. Project Name: Project Address:
1, the name of the equipment, specifications, quality and quantity (the following table)
2, the contract price
2.1, the total price of the equipment for the CNY (capitals): two hundred thousand one hundred and eighty-four hundred yuan, (capitals): 20_40.00 yuan. The total price includes the amount of equipment, packaging, transportation, insurance, loading and unloading costs, inspection costs and taxes, the total amount of the contract shall not be subject to any changes and adjustments.
2.2, Party B according to the attached list of equipment listed in the specifications, models, quantities of supply and delivery to the Nandiyuan site Party A designated unloading place and is responsible for the life of the pumping system equipment installation and commissioning operation.
3, payment:
3.1, Goods all to the site 7 working days later, Party A to pay 30% of the total contract price of ? ::60552.00 yuan;
3.2, living water pumping system equipment installation and commissioning run after 60 working days, Party A to pay 40% of the total contract price of ? ::80736.00 yuan;
3.3, sewage pumping system equipment installation and commissioning run after 60 working days, Party A to pay 25% of the total contract price of ? ::50460.00 yuan;
3.4, quality assurance deposit of 5% of ?10092.00, equipment operation for 12 months, 7 working days after the payment; Party B should strictly abide by the Party A's Finance Department of the payment regulations and processes, and in each application for payment to provide legitimate invoices, the project payment to 95%, Party B issued 100% full invoice.
4, delivery and delivery mode and location
4.1, Party B from the date of signing the contract, Party A notified Party B, Party B within 25 working days, the contract under the project all equipment goods transported to the site of Nandi Court Party A designated unloading place and is responsible for unloading;
4.2, the equipment handed over to the Party A and provide the relevant information: "Product Factory Inspection Report", Product Conformity Certificate", "Quality Assurance Certificate", etc., and both parties to handle the transfer procedures;
4.3, the transportation mode and arrival station (port) of the cost burden, transportation and handling costs borne by Party B;
5, quality and warranty
5.1, Party B should be strictly in accordance with the relevant national standards and regulations of manufacturing and testing, materials and components are new and unused, and in line with the provisions of the Annex to this contract. and in accordance with the provisions of the Annex to this contract. To ensure product quality. Equipment shall be subject to technical inspection, in line with relevant national standards in order to leave the factory Party B product quality three packages (quality problems: one week refund; one month replacement; two-year warranty). Since the date of delivery to the site, the overall quality of free warranty for twenty-six months. 5.2, Party B is responsible for free training for Party A operation. Including: basic principles, operation, use and maintenance. In the equipment into operation, the technical performance of the product fails to meet national standards Party B is responsible for sending technicians to replace the brand new product, the cost borne by Party B;
5.3, the equipment is put into normal operation, Party B should be regular return visits to the user.
6, the responsibility for breach of contract and settlement
6.1, the contract between the two sides of any party can not fully fulfill the terms of the contract, is a breach of contract. The economic losses caused by the defaulting party shall be borne by the defaulting party.
6.2, Party B does not arrive at the contract period and the quality does not meet the requirements, or other acts that make the contract can not be performed resulting in Party A's economic losses, should compensate Party A for economic losses and breach of contract.
6.3, the contract performance of any party without good reason and unilaterally proposed termination of the contract shall be liable for breach of contract,
6.4, Party A and Party B if a contract dispute, should be based on the principle of mutual understanding and mutual accommodation, mutual respect, peace and friendship to solve the problem through consultation.
7, Disclaimer
This contract can not be performed due to force majeure, the two sides in accordance with the relevant provisions of state law.
8, other agreements
8.1, this contract, including annexes and equipment list in quadruplicate, A and B, each party to take two copies from the date of signature and seal of the two sides to enter into force, are equally effective.
8.2, the contract is not exhaustive, can be agreed by both parties, and signed a written supplementary agreement.
Party A (official seal): _________ Party B (official seal): _________
Legal Representative (Signature): _________ Legal Representative (Signature): _________
_________ ____ ____ _________ ____ _________
On the pump equipment purchase and sales contract model 3
Party A (buyer):
Party B (seller):
Based on the "Chinese People's **** and the State of the Contract Law" and the provisions of relevant laws and regulations, A and B on the basis of equality and voluntariness on the purchase of frequency pumps to achieve the following Agreement:
First, the subject of the contract name, brand, model, specifications, manufacturers, the number of lists are shown in the table below
1, the above price includes: living water pump, frequency control cabinet, diaphragm type air pressure tank, channel steel base, supporting piping and valves and other all parts of the production, transportation, loading and unloading of trucks, installation and commissioning, acceptance, after-sales service, ordinary value-added tax invoices and other related costs.
2.
2, the packaging of materials and equipment by Party B is responsible for, according to the design of suitable transportation conditions.
Note: The attached drawing (printout) of the foundation is provided to Party A within seven working days after the contract is signed.
Second, quality standards:
1, product quality to meet the national mandatory standards;
2, provide relevant acceptance information (a copy of the company's business license, organization code certificate, tax registration certificate, company profile, a copy of the legal person's identity card and other credentials. National Industrial Products Production License; ISO9001:20_Quality Management System Certification; CCC China National Compulsory Product Certification; product inspection reports); imported goods are issued by the State Commodity Inspection Bureau of the security license issued by the factory original qualified products.
3, found that the goods supplied are inconsistent with the contract, Party A has the right to refuse to accept or return the goods, and all the responsibilities and consequences arising therefrom shall be borne by Party B.
Third, the delivery time and place:
1, Party A signed the contract, the prepayment to the account within 35 calendars, Party B should be delivered, and according to Party A's notice, the equipment will be supplied to Party A's designated location to unpacking, and is responsible for assisting in the installation and commissioning is completed after the acceptance of the Party A.
2, Party B shall deliver the goods to Party A after the installation and commissioning is completed, and the equipment shall be delivered to Party A for acceptance.
2, in the delivery of goods for use, Party B must provide Party A with product instructions, quality assurance, warranty cards, certificates of conformity and other must have the relevant information (information text in Chinese) and the necessary accessories, otherwise Party A has the right to refuse acceptance and delay the payment of the contract until Party B make up for the relevant information, during the period of delay in the delivery of the period will not be postponed.
3, delivery location:
Fourth, the payment method (transfer):
1, the payment of equipment for the two sides of the contract signed, Party A to pay Party B 20% of the total price of the equipment deposit (Party B issued a receipt to Party A);
2, to the site of the goods to the Party A to pay the total price of the equipment in the 10 working days, 60% of the total price of the equipment (Party B to issue the total price of the tax bill to Party A);
2, the goods to the site of Party A to pay the total price of 60% (Party B to issue the total price of the tax bill to Party A);;
2, to the site of Party A in 10 working days to pay the total price of equipment (Party B to issue the total price of tax bill to Party B) to Party A);.
3, equipment installation and commissioning acceptance within 10 days after payment to 95% of the total contract price (or for goods to the site within three months of debugging, late as debugging qualified);
4, the remaining 5% of the total price of the equipment warranty, acceptance of the full one year after 20 days to pay off (the warranty period of one year, one year from the date of acceptance of the commissioning ).
V. After-sales service
1, the free warranty period for equipment installation, commissioning and acceptance of equipment for one year from the date of acceptance; 3 years free of maintenance, after the warranty period, Party B still provides maintenance services, charge a cost fee.
2, Party B free configuration of some of the parts to ensure that the equipment supplied in the event of failure, at the latest within 24 hours to repair, if necessary, should be provided with the equipment model, specifications and technical indicators consistent with the spare parts or updated compatible products, to take temporary replacement and other measures to ensure that the normal work of Party A.
Sixth, the equipment warranty period is one year from the date of installation, commissioning and acceptance of the equipment; three years free of maintenance, maintenance services are still provided at cost.
Sixth, the liability for breach of contract
1, Party B late supply (or late installation, installation within 7 days after the arrival of the goods), each day of delay in accordance with the 500.00 yuan penalty, if more than 20 days in accordance with the default liability of the implementation of Article 3.
2, if Party B provides the product is not the contract agreed brand, model specifications, origin, then Party A has the right to return, the supply period will not be postponed, and according to the responsibility for breach of contract Article 3 implementation.
3, Party B withdraws midway according to the total cost of the contract 50% of the liquidated damages.
4, Party A if late payment, each day of delay in the unpaid part of the amount of 1‰ penalty.
5, the implementation of this contract, Party A, Party B does not adjust the unit price set in this contract due to market fluctuations in equipment, materials, labor prices.
6, Party B is fully responsible for the safety of the equipment before arriving at the site for delivery to Party A; equipment arrives at the site for delivery to Party A after the safety of Party A is responsible.
7, if the party B product upgrades, in order to ensure that the product indicators and the use of parameters unchanged or enhance the premise, the cost of party B is responsible for, party A reserves the right to change the product model agreed in the contract, party B at the same time to ensure that the product upgrades do not increase the price of all the changes in the product must be notified to the party A and party A agreed.
8, Party B to provide products must comply with the relevant national green regulations; Party B of the product materials and equipment design and quality of full responsibility, Party B or not according to the contract agreed to design the configuration and production, resulting in all losses borne by Party B.
9, Party B reserves the right to change the product model as agreed in the contract, at the same time to ensure that product upgrades without price increases.
9, Party B must provide new and authentic materials and equipment products, such as found that the materials and equipment provided by Party B are fake, counterfeit, fake, inferior, Party A has the right to return and terminate the contract, and according to the breach of contract responsibility for the implementation of Article 3 and Party B must compensate for all the losses of Party A. 10, Party A's on-site representative
B's on-site representative
VII, the settlement of disputes
The contract Disputes occurring in the course of fulfillment, the two parties to solve the problem by negotiation, the consultation fails, according to the law to the People's Court of Party A where the project is located.
VIII, the contract entered into force, expiry date: the two sides signed and sealed since Party B received the advance payment after the contract entered into force; payment clearance, the contract warranty period is automatically lifted (except as agreed).
Nine, this contract is a four copies, A and B each holding two copies. All the terms of this contract are printed text (in Chinese), the modification of any provision should be made by the two sides in the contract "Annex" indicated and confirmed in the seal after the entry into force. Attachment "Configuration List"
Party A (official seal): _________ Party B (official seal): _________
Legal representative (signature): _________ Legal representative (signature): _________
_________ ____ ____ _________ ____ ____
Related articles on pump equipment purchase and sale contract model 3 :
★ General version of the pump equipment purchase and sale contract model 3
★ water pump equipment purchase and sale contract model 3 latest 2020
★ Water Pump Purchase and Sale Contract 3 Latest 2020
★ Practical version of the pump purchase and sale contract 3 Latest 2020
★ Pump Purchase and Sale Contract 3 Practical 2020
★ 2020 Standard version of the pump purchase contract 3
★ Water Pump Purchase Contract Sample
★ Practical version of the procurement contract for building materials 3 latest 2020
★ 2020 construction materials sales contract model 3 latest
★ water pump procurement contract model